Effective date: June 2, 2026. Published by Anvilfield. Contact: [email protected].
TurfRate provides calculation tools and reference notes for convenience. It does not replace the current product label, local regulations, professional judgment, or required applicator training.
You are responsible for checking every input, product label, rate, unit, site condition, and legal requirement before applying fertilizer or chemicals. The label is the law.
Purchases
TurfRate Pro is a one-time Google Play Billing unlock for the features listed in the app. Purchase processing, receipts, refunds, and restore behavior are handled by Google Play.
No warranty
The app is provided as is and without a guarantee that any result is fit for a specific job.
Liability limit
To the maximum extent allowed by law, Anvilfield is not liable for lawn damage, plant damage, chemical misuse, regulatory penalties, lost profits, rework, or other indirect or consequential losses from using the app.
Use limits
Do not use TurfRate for emergency, medical, environmental-response, or legally required compliance decisions. Stop using the app if you do not agree to these terms.