WrapBid DC
Pipe insulation takeoff by size with man-hours, material, bid PDF, pay app CSV, and change-order export.
Count pipe, fittings, valves, jacket layers, and scope notes without rebuilding the job from scratch.
Create bid PDFs, SOV rows, pay-app CSVs, and change-order backups from the same local job file.
Snap a photo of the drawing, set the scale from a known dimension, and measure runs right on screen.
Free preview, then $4.99 monthly, $39.99 yearly, or $99 lifetime for Pro exports via Google Play billing.
What It Does
Take off pipe by size, count fittings and valves, pick insulation and jacket layers, tune shop labor units, and export the number. Snap a photo of the drawing, set the scale, and measure runs right on screen.
FAQ
Does WrapBid size insulation thickness?
No. It prices the engineer spec. It does not design condensation, energy-code, or personnel-protection thickness.
Can it export a pay application?
Yes. Mark areas billed this month, set percent complete, and export a Schedule of Values CSV and PDF.
Does job data leave the device?
Only when you choose to export and share a PDF or CSV.