Plan the roof ELD survey, pick low or high voltage, pin every breach on a grid, confirm the retest, and send the report from the roof.
Built for ELD techs
- Pick low-voltage wet vector mapping or high-voltage dry arc from the assembly and surface.
- Split large roof areas into survey fields and track lane coverage.
- Capture as-found and re-test photos for every breach.
- Export PDF, CSV, stamped images, field card, building roll-up, and ZIP.
Price
Three reports are free. Pro plans are handled by Google Play Billing: monthly, annual, and lifetime.
Privacy
VectorMap ELD stores records on the device. It has no account, no backend, no analytics, and no ads. Read the privacy policy.