Anchor Template Check

Offline pre-pour anchor-bolt template verification packets.

Check the cluster before the pour

Anchor Template Check helps field crews compare anchor-bolt readings to the plan values and tolerances they enter, capture evidence, and export a pre-pour verification packet.

The app is a field aid. It does not stamp, certify, approve, or accept work. The EOR and AHJ keep authority for acceptance.

Privacy policy · Support

Workflow

Plan values
Enter bolt pattern, tolerances, plan dimensions, projection, offsets, and project notes from approved drawings.
Field readings
Record actual values with fraction input, out-to-out conversion, unverified-axis handling, and pass/fail status.
Evidence
Capture required photos, GPS stamp or manual location note, deviations, and foreman signature.
Exports
Create PDF packets, with paid plans unlocking unmarked PDF, CSV, JSON, and ZIP export sets.