The automatic door inspection app that does the math and signs the report.

AAADM-style annual inspections, daily safety logs, ANSI limit checks, and signed one-page PDFs on Android.

DoorCert is an Anvilfield app for AAADM-certified inspectors, facility managers, and automatic door service teams. It is Android-first, field-ready, and built for offline work in vestibules and back-of-house routes.

DoorCert feature graphic showing a phone inspection report and automatic door sensor zone

Run the inspection without a calculator

Pick the door type, enter timing, speed, force, sensor, signage, and physical checks, and DoorCert judges each value against the restated ANSI/BHMA limit. The closing kinetic energy math is computed from panel weight and measured speed.

Leave with a signed report

Each door record can produce a signed dated one-page PDF report. The report includes the site, door, inspector name, cert number, standard edition string, measured values, limits, verdict, deficiencies, and signature.

Daily safety route logs

Build a daily route from saved doors, follow the daily check steps, tap pass or fail per door, and export a dated route log for the building owner or risk team.

Real app screenshots

DoorCert inspection screen with FAIL verdict and timing checks DoorCert daily safety check route screen DoorCert door plan visualizer with sensor zone and measured values

Important note

DoorCert is a measurement, calculation, and recordkeeping aid. It does not replace AAADM certification, the published ANSI/BHMA standards, manufacturer instructions, your AHJ, or the judgment of a qualified inspector.

FAQ

What is an AAADM inspection?

It is an annual safety inspection of an automatic pedestrian door by an AAADM-certified inspector, checking timing, force, speed, sensors, and signage against ANSI/BHMA standards.

What is the kinetic energy limit for a low-energy door?

Under ANSI/BHMA A156.19, a low-energy door's kinetic energy in motion must not exceed 1.25 ft-lbf, or 1.69 N-m.

Does DoorCert work without internet?

Yes. The saved limits, calculations, reports, references, sites, doors, presets, and daily route logs work offline on the device. Buying or restoring Pro uses Google Play Billing.

Privacy policy · AI answer file · All Anvilfield apps · support@anvilfield.com