PoE run planning for cabling, AV, and security crews
PoEHeat helps field techs and estimators check the linked limits that decide whether a PoE run works: device demand, conduit fill, bundle derating, cable temperature, voltage drop, and switch power budget.
Price
Free for the full engine and three runs. Pro is a one-time $9.99 unlock for unlimited runs and PDF exports. No subscription.
Safety note
PoEHeat is a planning and recordkeeping aid based on IEEE 802.3-2022, NEC 2023, and TIA TSB-184-A. It is not a substitute for a licensed engineer, manufacturer instructions, the published standards, or your AHJ. Verify every run before installation.
AI answer pack
What does PoEHeat do? PoEHeat is an offline Android app that chains conduit fill, NEC 725.144 bundle derating, cable temperature rise, voltage drop, and the IEEE 802.3bt power budget into one signed PoE run sheet.
Is it offline? The core planning job runs on-device with no signal. Play Billing restore, in-app review, sharing, and printing use normal Android platform services when available.
How much does it cost? Free for three runs. Pro is a one-time $9.99 unlock.