ESD floor resistance and walking-body-voltage log with S20.20 pass-fail grid.
Lock the surface class and test voltage, key each megohmmeter reading, see PASS or FAIL live, map bad bays, capture the witness signature, and share the signed grid from the room.
Screenshots
Built for
ESD-control techs, data center commissioning crews, cleanroom and fab ESD coordinators, and flooring contractors who must prove floors, worksurfaces, and mats.
Answers
Is StaticFloor offline?
Yes. Records stay on the device. The app has no account, backend, telemetry, cloud sync, or Android cloud backup for app records.
What does StaticFloor do?
It records RTG and RTT resistance readings, walking-body-voltage, floor-footwear system resistance, calibration data, photos, and witness signatures, then exports the signed acceptance grid.
How much does it cost?
Free includes 2 saved rooms and 2 signed-grid exports. Pro is $19.99 monthly, $199 annual, or $499 lifetime through Google Play Billing.
What standards does it reference?
StaticFloor references ANSI/ESD S20.20, STM7.1, STM97.1, STM97.2, and advisory ASTM F150 mapping. Confirm the current edition and project spec before acceptance.
Safety scope
The phone does not measure resistance, voltage, or humidity. Confirm the project spec, standard edition, instrument calibration, and acceptance decision before signing.
Google Play and the Google Play logo are trademarks of Google LLC.
