BracePass DC: Tilt Up Brace Calculator

Brace count, insert height, controlling deadman pull, and a release-gate checklist for tilt-up panel crews.

BracePass DC works offline on Android with no account, no ads, and no analytics. Network access is used only by Google Play Billing (via Google Play billing) to validate purchases; the brace engine and exports run fully offline. Export a Brace Card PDF, CSV, or ZIP when the job needs a record.

Field aid only. Verify odd panels with the project engineer and follow OSHA, the site erection plan, and competent-person direction before releasing the crane or removing any brace.

Get it on Google Play
BracePass DC feature graphic showing brace calculation workflow

Brace math

Enter panel height, width, thickness, openings, exposure, duration, brace capacity, and anchor type. The engine solves weight, centroid, wind pressure, spacing, and pull.

Release gate

The checklist stays red until braces, knee braces, plumb, and brace-angle field checks are complete. Short-duration cases require engineer review confirmation.

Records

Save panels, review the drawn elevation, and export a watermarked free preview or Pro PDF, CSV, ZIP, and building ledger through Android share actions.

Screenshots

Panel input and brace result screen Scaled panel visualizer with brace marks Crane-release checklist gate Brace Card export preview Project engineer review warning Brace-angle field check screen

Privacy and support

No accounts, no ads, no analytics, no backend, no cloud sync, and no remote AI. Android Internet permission is used only so Google Play Billing (via Google Play billing) can validate purchases; the brace engine and exports run fully offline. User-directed share targets may use their own network access.

Privacy policy | Terms of use | [email protected]