ANVILFIELD [email protected]

Android field tool · Anvilfield

Line Clearance Inspection Log

Document before-and-after spans with photos, GPS, timestamps, and PDF export.

What it is for

A focused workflow instead of a generic form

Line Clearance Inspection Log is designed for utility vegetation and line-clearance teams documenting inspected spans. Its public description is intentionally limited to functions present in the Android app.

Job-specific input

Document before-and-after spans with photos, GPS, timestamps, and PDF export.

Reviewable results

Check the entered values, calculated output, saved record, and any source or assumption notes before relying on the result.

User-controlled handoff

Core field and project records stay on the device. They leave when you deliberately use an available export or Android share destination.

Verify before field use

Follow the utility’s work rules, minimum approach distances, vegetation specifications, and qualified-person requirements. The app does not determine safe clearance.

Clear identity

The installed app and this page use the same name

Package com.anvilfield.clearanceproof is published by Anvilfield. The app is independent and is not presented as an official app of a government agency, standards body, equipment maker, or trade association. Third-party names identify compatibility, reference material, or field context only.

Availability, feature access, and any purchase terms are shown on Google Play and in the installed app. No fixed price or promotional promise is made on this page.