FiberCert DC by Anvilfield

Fiber test report app for data-center closeout

Label trunks, log OTDR and OLTS PASS evidence, solve MPO polarity, and build the cert packet without a login or signal in the hall.

Get it on Google Play

Built for the warranty witness

Screenshots

FiberCert DC link detail with margin and retest state FiberCert DC planned versus tested matrix FiberCert DC pull planner checks

Scope

FiberCert DC is a calculation and record aid based on TIA-568/606, FOA methods, and IEC 61300-3-35. It does not measure optics, grade endfaces, replace the test-set manufacturer procedure, or grant owner acceptance.

Privacy policy | Terms | [email protected]