FryerStat Manometer Log

Gas-pressure logbook and before/after proof sheet for commercial food-equipment hot-side service techs. Read with your own manometer, type the numbers, compare to fryer, range, griddle, oven, and combi NAT and LP manifold WC targets, and see the likely supply, regulator, or valve call.

Offline. No login. No ads. Logbook and math helper only.

Get it on Google Play

What it does

What it does not do

Answer pack

What is FryerStat Manometer Log?

FryerStat is an offline Android app for commercial food-equipment hot-side techs. You read pressure with your own manometer, type the numbers, compare to bundled NAT and LP manifold WC targets, and export a before/after proof sheet.

Is FryerStat a manometer?

No. It is a logbook and math helper. The tech reads pressure with a real manometer and types the value. It does not read, control, approve, or energize gas.

Does FryerStat work offline?

Yes. Targets, decisions, saved logs, and PDF or CSV export are generated on the phone. Files leave the phone only when you share an export. Network is used only for the one-time Pro purchase and restore.

How much does FryerStat cost?

Free includes the full engine, 3 logs a month, and hazard notes. Pro is a one-time $9.99 unlock for the full target library, unlimited logs, polished PDF, CSV, deeper history, and meter details. No subscription.

Privacy policy | Terms of use