WeldVT: Weld VT Report

Offline visual weld inspection reports for AWS D1.1:2025 VT calls, NCRs, repair re-inspection, and inspector-attested shift records.

WeldVT app feature graphic showing a rejected undercut weld call and structural steel weld

Judge measured VT calls

Enter undercut, porosity, fillet size, profile, crack, fusion, and overlap findings. WeldVT applies the active AWS D1.1:2025 visual criteria for the weld context.

Branch on the weld context

Loading class, base-metal thickness, primary-member status, and transverse tensile-stress flags drive the active limits. Missing safety-critical context blocks export.

Issue NCRs and reports

Rejected welds carry NCR numbers, measured-versus-limit values, clause citations, and repair re-inspection status. Reports include a weld-by-weld ledger and inspector identity.

Example field call

Weld W-114 has measured undercut of 0.04 in on 1/2 in statically loaded plate. WeldVT compares it to the 1/32 in active limit and marks the call REJECT. Porosity, fillet size, and profile can still show ACCEPT when their measured values are within limit.

Offline by design

Core inspection, local autosave, the D1.1 judgment engine, and PDF report generation run without an Anvilfield account or cloud backend.

Inspector remains responsible

WeldVT assists qualified inspectors with recordkeeping and measured-call judgment. It does not replace AWS CWI certification, the published standard, contract documents, the Engineer of Record, or the AHJ.