ANVILFIELD Try FieldOS

Trust & disclaimers

How to use Anvilfield, and what stands behind it.

Straight answers on what our guides are, how they are made, and where the responsibility line sits.

Field-reference, not a stamp

Anvilfield guides are practical field references written and reviewed against published standards and codes. They are not a substitute for the adopted code in your jurisdiction, the manufacturer's instructions, or a licensed professional. Always verify against the current local code and the authority having jurisdiction before you build, bid, or sign off.

How the guides are made

Every guide is written and reviewed by subject-matter reviewers, checked against current standards, and re-audited for accuracy and currency. We correct errors when we find them and we do not fabricate citations, values, or standards.

Your data in our tools

The Anvilfield field tools and FieldOS are built to keep your records yours. See the privacy policy for exactly what is collected and how it is handled.

Found something off?

If a guide is out of date or a number looks wrong, tell us at [email protected] and we will check it. Accuracy is the product.

Editorial standards

How a guide is written, reviewed, and kept current

  1. Grounded in published standards. Each guide is written against the codes and standards that actually govern the work, and every code reference shown on a guide is one it genuinely cites. We do not fabricate citations, values, or standards.
  2. Reviewed for accuracy. Guides are reviewed by subject-matter reviewers and checked against current standards before publishing, then re-audited for accuracy and currency. Each guide shows its last-reviewed date.
  3. Answer-first and field-tested. Every guide leads with a direct answer and the field assumptions behind it, so the number or rule is usable on site, not buried.
  4. Corrected in the open. If a number looks wrong or a code has moved, tell us at [email protected] and we check it. Accuracy is the product.

Standards we check against

Anvilfield guides are reviewed against the published standards that apply to each trade, including:

NEC / NFPA 70NFPA 72NFPA 13NFPA 70EACI 318 / 301 / 305 / 306ASHRAE 62.1 / 90.1ASTMOSHA 29 CFR 1926IBC / IMC / IPCIEEEULSMACNAAWS D1.1IICRC S500

Browse the codes and standards hub to see the guides that apply to each one, and read any guide's own "Codes cited in this guide" section for the exact references behind it.

See also the privacy policy for data handling across Anvilfield and FieldOS.