Roofing field guides
Roofing guides, checklists, and calculators
Crickets, tapered insulation, wind zones, ELD surveys, underlayment laps, coatings, and roof proof.
Where trades find buildings, assets and public work: choose a property list, custom asset search or public bid for the next account.
Latest Roofing guides
Finding customers and planning bids (8)
Field GuideBuild a 100-building commercial roofing prospect listTurn a territory and a roof-service scope into 100 distinct building records, with owner roles, evidence, survey stages, and acquisition costs your service manager can review.Commercial Roofing LeadsCommercial RoofingProspect Qualification
18 min read
Field GuideFind fabric building re-cover and repair prospects: inspection and handoffTurn visible fabric structures into qualified service conversations with owner verification, an OEM inspection questionnaire, and a measured replacement-cover scope.Fabric StructuresReplacement CoversBuilding Repair
24 min read
Field GuideFind commercial roofs 10+ years old: what the evidence can tell youFind older commercial roofs by matching dated roof records to individual roof areas. Use age bands to select survey prospects, then verify history, condition, and who can authorize work.Commercial RoofingRoof AgeRoof Inspection
18 min read
Field GuideQualify roof restoration prospects before booking a surveyQualify roof coating leads by roof history, owner authority, repair concerns, access, and survey cost. Book the visit with a defined scope and a reason to go.Roof RestorationRoof CoatingCommercial Roofing Leads
18 min read
Field GuideSize a roof-coatings market from building counts, not guessworkCount buildings, validate a sample, and carry eligible roof area into a territory worksheet. Separate the roof stock from annual owner decisions and the work your crew can complete.Roof CoatingCommercial RoofingMarket Sizing
19 min read
Field GuideRoofing manufacturer territory research from verified roof portfoliosBuild a roof-area register before sizing a sales territory. Separate documented materials, unresolved brands, and conditional demand so dealers receive a file they can work.Commercial RoofingManufacturer ResearchRoof Portfolios
19 min read
Field GuideSalt-storage domes: find public repair and re-cover workFind salt-storage dome repair bids through public-works procurement portals, then verify the roof system, deadline and salt-protection scope before pricing.Salt StorageFabric BuildingsPublic Bids
18 min read
Field GuideWarehouse roof service: qualify rooftop equipment and loading-dock accessQualify the roof, rooftop equipment, loading-dock route, and approving contact before pricing warehouse maintenance. Build an account brief the service crew can use.Warehouse Roof MaintenanceCommercial Roofing LeadsRooftop Equipment
19 min read
Roof systems, materials, and installation (26)
Field GuideBallasted single-ply roof system installation field guideHow a loose-laid single-ply membrane gets held down by stone or concrete-paver ballast instead of fasteners or adhesive, designed to the wind by ANSI/SPRI RP-4 with the rate, the zones, and the scour figured before the stone goes on.Ballasted RoofSingle-Ply RoofingANSI/SPRI RP-4
21 min read
Field GuideBuilding insulation and air sealing: the envelope field guideWhy air sealing matters as much as the R-value, the insulation types and where each fits, the continuous air barrier, climate-correct vapor control, thermal bridging, and ventilating a tight building.Air SealingBuilding EnvelopeInsulation R-Value
21 min read
Field GuideBuilt-up roof (BUR) installation field guide for low-slope crewsInstalling a built-up roof: the plies and interply mopping, asphalt vs coal-tar pitch, EVT and the kettle, the flood coat and gravel, hot-work safety, flashings, and the defects that show up later.Built-Up RoofingTar and Gravel RoofBUR
21 min read
Field GuideEPDM rubber roof installation field guide for commercial crewsInstalling an EPDM single-ply rubber roof: the membrane, fully adhered, mechanically attached, and ballasted systems, the splice-tape seam that makes or breaks it, flashings, and the failure modes to design out.EPDM RoofingSingle-Ply RoofingSplice Tape Seams
21 min read
Field GuideMetal roof restoration and coating field guideRenewing an aging, rusting metal roof in place: qualifying the roof, treating the rust, fixing the leaking fasteners and seams, and coating it, instead of a tear-off.Metal Roof RestorationRoof CoatingRusted Metal Roof
21 min read
Field GuideMetal roof types compared: standing seam, exposed fastener, and shinglesHow to choose a metal roof: the fastening split that decides everything, standing seam vs exposed-fastener panels, metal shingles and stone-coated steel, the metals and coatings, the slope and deck limits, and the cost-and-life trade.Metal Roof TypesStanding SeamExposed Fastener
21 min read
Field GuideModified bitumen roof installation field guide for low-slope crewsInstalling a mod-bit low-slope roof: SBS vs APP, the four application methods, torch fire watch, the plies, the seam bleed-out, the flashings, and what to document.Modified BitumenSBS vs APPTorch-Down Roofing
21 min read
Field GuideRoof crickets and tapered insulation: sloping a flat roof to drainHow crickets and tapered insulation move water off a low-slope roof, the slopes that actually work, and the layout that keeps water away from the laps.Roof CricketTapered InsulationLow-Slope Drainage
21 min read
Field GuideRoof deck substrate types and what they mean for the roofThe structural surface the roof attaches to, deck by deck: steel, structural concrete, lightweight insulating concrete, gypsum, wood, and wood fiber, and how each one drives fastening, fire, and wind uplift.Roof DeckSteel DeckConcrete Roof Deck
21 min read
Field GuideRoof insulation and cover board: installing the low-slope assemblyWhat the insulation layer does, the board types and their R per inch, polyiso in the cold, the cover board that saves the membrane, and how it all gets attached against the wind.Roof InsulationCover BoardPolyiso
21 min read
Field GuideRoof purlins: types, spacing, spans, bracing, and field checksRoof purlins are secondary framing members that support roofing between the main frames or trusses. Check their span, spacing, bracing, and connections together before ordering steel or pricing a reroof.Roof PurlinsMetal RoofingCold-Formed Steel
21 min read
Field GuideRoof vapor retarder and air barrier: the low-slope moisture control layerWhat the vapor retarder and the air barrier each do in a low-slope roof, why air leakage wets insulation faster than diffusion, which side the retarder goes on, and when the assembly actually needs one.Vapor RetarderAir BarrierRoof Condensation
21 min read
Field GuideRoofing system types: steep-slope vs low-slope, and how to chooseAn overview of every roofing system by slope: the steep-slope shedding roofs of shingle, metal, tile, slate, and wood, and the low-slope membranes of single-ply, built-up, mod-bit, and SPF, and how to pick the right one for the building.Roofing SystemsSteep-Slope vs Low-SlopeRoof Slope
21 min read
Field GuideSiding installation field guide: vinyl, fiber cement, and what keeps the wall drySiding is the raincoat, but the water-resistive barrier and the flashing are what keep the wall dry. How to lap the WRB, flash every opening and the kick-out, hang vinyl loose, and control fiber-cement silica.SidingWater-Resistive BarrierFlashing
21 min read
Field GuideSingle-ply membrane seam QA: inspecting TPO, PVC, and EPDM roof seamsHow to inspect and QC single-ply seams on a commercial roof: the hot-air weld, the daily trial weld, the probe walk, and the record that holds the warranty.Single-Ply RoofingTPO SeamPVC Welding
21 min read
Field GuideSlate roof installation and repair field guideInstalling and repairing a natural slate roof: real versus synthetic, slate grade, the weight and the framing, slope and headlap, copper and stainless fasteners, copper flashing and valleys, and pulling a broken slate with a ripper and hook.Slate RoofingNatural SlateCopper Flashing
21 min read
Field GuideStanding seam metal roof installation field guideStanding seam metal roofs use raised panel joints and concealed attachments. Install the approved supports, movement details, seam closure and flashing for the selected profile.Standing SeamMetal RoofingConcealed Clip
25 min read
Field GuideSteep-slope asphalt shingle roofing field guideInstalling a steep-slope asphalt shingle roof from the deck to the ridge cap: slope, underlayment, ice and water shield, starter, exposure, nailing, valleys, flashing, and balanced ventilation.Asphalt ShinglesSteep-Slope RoofingRoof Underlayment
21 min read
Field GuideClay and concrete tile roof installation field guideInstalling a clay or concrete tile roof: clay vs concrete, profiles, the weight and structural load, the underlayment that does the real waterproofing, slope, battens, fastening for wind and seismic, flashings, and the long life.Clay Roof TileConcrete Roof TileTile Roof Underlayment
21 min read
ComparisonTPO vs EPDM vs PVC: commercial roof membrane selectionStart with the three-way membrane decision for a commercial low-slope roof. Follow a pairwise comparison when climate, welded seams, or exposure leaves two practical candidates.Single-Ply RoofingTPO vs EPDM vs PVCMembrane Selection
21 min read
Field GuideWall cladding systems for commercial buildings: selection and field checksCommercial wall cladding uses metal, fiber cement, masonry, precast or EIFS assemblies. Select by fire, wind, drainage, thermal performance and repair access.Wall CladdingCommercial BuildingsRainscreens
21 min read
Field GuideWood shake and wood shingle roof installation field guideInstalling a cedar shake or shingle roof so it breathes and resists fire: shakes versus shingles, grades, the fire and WUI code, spaced sheathing, interlayment, stainless fasteners, keyways, exposure, valleys, and ridges.Cedar ShakesWood ShinglesCedar Roofing
21 min read
Field GuideCan you paint vinyl siding a darker color? Manufacturer compatibility checksMatch the siding instructions, exact paint formula, heat exposure and warranty before approving a darker vinyl repaint.Vinyl sidingExterior paintingColor compatibility
24 min read
Field GuideWhat do ASTM D6083 and D6694 roof coating ratings mean in the field?A condition-matched comparison of acrylic and silicone qualification, with product tables, field adhesion schedules and a lab-to-field worksheet.Roof coatingsASTM D6083ASTM D6694
25 min read
Field GuideCan you substitute a roof component in an FM RoofNav assembly?Keep the exact RoofNav configuration, compare every changed layer, and separate assembly certification from project acceptance and installer release.FM RoofNavRoof substitutionsAssembly approval
24 min read
Field GuideWhy is a metal roof buckling? Clip travel and thermal movement checksTrace metal roof buckling from the fixed zone to the clips and end details, with directional travel calculations and a measured repair record.Metal RoofingThermal MovementClip Travel
25 min read
Drainage, flashings, edges, and roof interfaces (17)
Field GuideBlue roof field guide: controlled-flow drainage and stormwater detentionHow a detention roof holds rainwater and releases it slowly through flow restrictors, the water weight the structural engineer signs off, the overflow that has to handle the storm if the restrictor clogs, and the membrane rated for standing water.Blue RoofControlled Flow DrainageStormwater Detention
21 min read
Field GuideFascia, soffit, and eave trim field guide for roofersThe parts of the eave: the fascia that carries the gutter, the soffit that closes the overhang and feeds attic intake, the metal wrap, the drip edge, open versus boxed eaves, and why fascia and soffit rot.FasciaSoffitEave Trim
21 min read
Field GuideGutter and downspout sizing and installation for exterior roof drainageHow to size exterior gutters and downspouts by roof area and rainfall, set the slope, space the hangers and downspouts, and keep a clog from backing water under the roof edge.GuttersDownspoutsExterior Drainage
21 min read
Field GuideParapet wall base flashing: the detail where low-slope roofs leakThe membrane turns up the parapet, a cant softens the corner, a term bar holds the top, and a counterflashing or through-wall sheds water over all of it. Get the layering and the height right and the wall stays dry.Parapet FlashingBase FlashingCounterflashing
21 min read
Field GuideRoof and attic ventilation field guide: intake and exhaustHow a balanced attic works: intake low at the soffit, exhaust high at the ridge, the 1:150 and 1:300 net free area rule, why you never mix exhaust types, and how ventilation, air sealing, and insulation keep the deck cold.Attic VentilationRidge VentSoffit Intake
21 min read
Field GuideRoof drainage: sizing primary drains, overflow drains, and scuppersHow to size primary and secondary roof drainage, the design rainfall rate, the required overflow set 2 in above the low point, scuppers as weirs, and the rain load.Roof DrainageRoof DrainsOverflow Drains
21 min read
Field GuideRoof edge metal, coping, and fascia: the wind design that keeps them onHow roof edge metal, coping, and fascia get designed and tested to ANSI/SPRI ES-1 so the perimeter holds in a wind event instead of peeling and taking the roof with it.Roof Edge MetalCopingANSI/SPRI ES-1
21 min read
Field GuideRoof expansion joint installation for low-slope commercial roofsHow to build a roof expansion joint on two raised curbs, flash the membrane up both sides, span the gap with a bellows cover, and keep water off the joint.Roof Expansion JointArea DividerBellows Cover
21 min read
Field GuideRoof flashing types: what each one does and where roofs leakEvery flashing on the roof, base and counter, step, headwall, valley, drip edge, coping, pitch pan, cricket, and chimney, and the principle that ties them together: water sheds over, never under.Roof FlashingCounterflashingStep Flashing
21 min read
Field GuideRoof penetration flashing details for low-slope commercial roofsHow to flash the pipes, curbs, drains, and walls on a low-slope commercial roof, the 8 in base flashing rule, and why the details decide whether it leaks.Roof PenetrationPipe BootBase Flashing
21 min read
Field GuideRooftop antenna sites and roofing coordination: access, supports and reroofingCoordinate rooftop antenna work through an agreed roof plan, carrier access and outage controls, engineered supports, approved flashing and documented restart.RoofingRooftop AntennasTelecom Sites
18 min read
Field GuideRooftop equipment supports and walkway pads for low-slope commercial roofsHow to support rooftop units, pipe, conduit, duct, and solar without leaking or crushing the membrane, and how to protect the roof with walkway pads on the service path.Rooftop SupportsPipe SupportsWalkway Pads
21 min read
Field GuideRooftop solar PV mounting and racking: the roofing side of an arrayHow a PV array gets attached to the roof without leaking: roof-life-first, flashed steep-slope mounts, standing-seam clamps, ballasted versus attached low-slope, and the warranty that rides on every penetration.Rooftop SolarSolar RackingFlashed Mount
21 min read
Field GuideSkylight curb installation and flashing for low-slope and steep roofsHow to install skylights and flash them watertight on low-slope and steep roofs: the curb, the 8 in turn-up, the cricket, condensation, fall protection, and finding the real leak.SkylightCurb-Mounted SkylightSkylight Flashing
21 min read
Field GuideSolar-ready (PV-ready) roof provisions for low-slope commercial roofsHow to build a roof so a future PV array drops on without a tear-up: reserve the structural capacity, hold a clear unshaded zone, run the conduit pathway, and match the roof and warranty to the array.Solar-Ready RoofPV-ReadySolar-Ready Zone
21 min read
Field GuideCommercial skylight replacement cost: unit, curb and roof-access tablesPrice each measured skylight, choose the curb scope, and allocate shared roof access with a 12-opening warehouse budget.Commercial skylightsReplacement costRoof curbs
25 min read
Field GuideWhy do gutters and downspouts freeze?Diagnose the freeze source, map discharge to the final outfall, and match heating, attachment evidence and winter verification to the actual system.GuttersDownspoutsFreeze diagnosis
27 min read
Inspections, coatings, repair, and warranties (33)
Field GuideSalt storage dome maintenance: inspections and seasonal repairsMaintain a salt storage dome by keeping the covering watertight, checking the structure and containment, and closing repairs before winter loading resumes.Salt StorageDome MaintenanceRoof Inspection
18 min read
Field GuideDrone and UAV roof, facade, and solar inspection field guideFly it legally under Part 107, capture the thermal data that finds what the eye cannot, and hand the trade a report that says where to look.Drone InspectionFAA Part 107Thermal Imaging
21 min read
Field GuideElectronic leak detection survey for roof and waterproofing membranesHow an ELD survey finds the actual breach in a roof or waterproofing membrane: high-voltage spark on dry membrane, low-voltage vector mapping under overburden, the grounding, and the leak map.Electronic Leak DetectionELD SurveyVector Mapping
21 min read
Field GuideVegetative green roof installation: assembly, load, and the buried membraneHow to build a vegetative roof: extensive vs intensive, the saturated load the engineer signs off, the layer order, the root-resistant membrane, leak testing before burial, engineered media, wind, and fire.Green RoofVegetative RoofStormwater Retention
21 min read
Field GuideGreen roof maintenance: planting, drainage, and warranty careSet the ongoing care program for a vegetative roof, including establishment, weeding, drain access, and warranty responsibilities. Use the turnover record to document the initial handoff.Green Roof MaintenanceVegetative RoofEstablishment Period
21 min read
Field GuideRoof ice dams and snow load management field guideWhy ice dams form from heat loss, the air-seal then insulate then ventilate cure, where ice and water shield goes, safe removal, and when snow load is a collapse risk.Ice DamsSnow LoadIce and Water Shield
21 min read
Field GuideCommercial roof asset management and capital planning field guideHow an owner runs a portfolio of roofs as a capital asset: the inventory, the condition rating and remaining life, the repair-restore-replace decision, and a multi-year capital plan that prioritizes the spend.Roof Asset ManagementCapital PlanningRoof Condition Index
30 min read
Field GuideRoof coating thickness: calculate mils and coverage yieldWork out coating quantities and wet-film targets from the specified system. The warranty-walk record covers how to assemble the application evidence after the work.Roof CoatingMil ThicknessCoverage Yield
21 min read
Field GuideLow-slope roof coating restoration system field guideWhen a fluid-applied coating renews an aging but sound low-slope roof instead of a tear-off, and how the substrate, the prep, the chemistry, and the warranty decide whether it lasts.Roof RestorationRoof CoatingFluid-Applied Membrane
21 min read
Field GuideRoof leak diagnosis and troubleshooting for commercial roofsHow to find a roof leak: why it is at the details and not the field, why water travels past the stain, the inside-and-roof inspection worked uphill, and the water test.Roof Leak DiagnosisLeak DetectionFlat Roof Leak
21 min read
Field GuideCommercial roof maintenance: inspection schedules and recordsPlan the recurring inspection, repair, and documentation cycle for an occupied commercial roof. Use the detail records below when a particular test or warranty handoff needs evidence.Roof MaintenanceRoof InspectionNRCA
21 min read
Field GuideRoof ponding water: diagnosis and correction on low-slope roofsWhat ponding water is, the NRCA 48-hour rule, why it kills the membrane and the warranty, slope versus deflection, and the tapered-insulation and drainage fixes that actually work.Ponding WaterFlat RoofTapered Insulation
21 min read
Field GuideRoof warranty coverage: material, workmanship, and NDL termsCompare roof warranty coverage and owner obligations before choosing a warranty. Use the separate field records to assemble evidence for a particular inspection or release.Roof WarrantyNDL WarrantyManufacturer Warranty
21 min read
Field GuideRoof storm and hail damage assessment and insurance restoration field guideHow a roofer reads real hail and wind damage, documents the storm claim, and works it ethically and legally: ACV vs RCV, the deductible, supplements, and staying out of public adjusting.Storm RestorationHail DamageInsurance Claim
21 min read
Field GuideTraffic deck waterproofing and coating field guideWhat a traffic coating actually protects, why it is corrosion protection for the deck, the urethane primer-base-aggregate-top system, the surface prep and moisture that make or break the bond, the detailing, the mils, and the testing.Traffic CoatingDeck WaterproofingParking Garage
21 min read
Field GuideHow often should a commercial roof be inspected? GAF and Carlisle schedules comparedGAFGLAS BUR v1.0 sets an annual inspection minimum; Carlisle Rev 12/24 directs inspections at least every six months. Compare routine schedules, storm and HVAC triggers, owner records and a three-roof annual budget.Commercial roof inspectionsGAFCarlisle
24 min read
Field GuideCommercial roof service life table: observed ages, warranties and planning rangesPlan for TPO at 20 to 30 years and PVC at 15 to 30, according to GAF's January 2026 guidance; ERA's Updated 2025 survey summary reports EPDM expectations of 25 to 40-plus years with proper installation and maintenance. For defined assemblies, Bentz and Rossiter's November 2008 model uses 25 to 30 years for gravel-surfaced built-up roofing, 20 to 25 for granule-surfaced two-ply modified bitumen and 40 for painted standing-seam metal. Match these planning inputs to the assembly, inspection findings and maintenance history before setting a replacement window. Keep planning expectations, observed roof ages, completed service intervals and warranty coverage separate.Commercial Roof Service LifeTPOEPDM
25 min read
Field GuideRepair or replace a leaking commercial roof? A 10-year break-even worksheetCompare repair now and deferred replacement with replacement now using annual leak costs, one ten-year horizon and the value of the roof remaining at year 10.Commercial RoofingRoof RepairRoof Replacement
25 min read
Field GuideHow to build a portfolio capital budget when funding is limitedSelect complete roof, HVAC, electrical, drainage, paving, and lighting packages within capital and operating limits, then document every deferral.Portfolio Capital BudgetCapital PlanningProject Dependencies
25 min read
Field GuideASTM C1153 field guide to confirming wet roof insulationAn ASTM C1153 infrared roof survey locates thermal patterns associated with wet insulation, then verifies the findings with invasive testing. For the usual evening survey, scan a dry roof after solar heating, separate moisture patterns from repairs and other heat sources, and confirm suspect areas and comparison locations within the same roof assembly. ASTM C1153-23 covers both ground-based and aerial inspections; the deliverable should connect each mapped anomaly to its thermogram, daylight photograph, confirmation result, and remaining uncertainty.ASTM C1153Infrared roof surveyWet insulation
25 min read
Field GuideHenry vs GAF roof coating adhesion tests: which result passes?Match the test result to the exact coating, substrate and manufacturer instruction, with side-by-side methods, preparation records and failure-plane decisions.Roof coatingsAdhesion testingHenry
25 min read
Field GuideHow much does commercial roof coating cost? A scope and labor worksheetMeasured preparation, wet-insulation repairs, material orders and paid crew time for three equal-area silicone restoration scopes.Roof coatingsCommercial roofingCost estimating
25 min read
Field GuideWhen should a coated roof be recoated? GAF maintenance and renewal tablesTurn coating condition, GAF renewal documents and separate repair quantities into an owner maintenance calendar.Roof coatingsGAF HydroStopRoof maintenance
26 min read
Field GuideHow to rate a single-ply roof with the USACE ROOFER methodMeasure single-ply distress, calculate separate membrane and flashing indexes, reconcile inspectors, and preserve a repair-ready survey record.ROOFERRoof condition ratingSingle-ply roofs
25 min read
Field GuideAcrylic vs silicone roof coatings: 20-year maintenance cost comparisonCompare specified acrylic and silicone systems on equal roof area over a common twenty-year service horizon.Roof coatingsLifecycle costAcrylic
25 min read
Field GuideWhy do coastal metal roofs corrode? Component and repair checksDocument salt exposure, component compatibility, fastener condition and coating breakdown, then build a repair or replacement scope with quantities and acceptance evidence.Coastal metal roofsMarine exposureFastener corrosion
26 min read
Field GuideCAI reserve-study component inventory and useful-life worksheetUnder CAI's July 2023 standards, reserve projects must be association obligations with reasonably anticipated timing and material, estimable total costs. The worksheet below carries those projects from quantity evidence and useful-life estimates into a 30-year cash flow, with warranty coverage tracked separately.Reserve StudiesComponent InventoryCAI
27 min read
Field GuideSelling a building with an old roof: which condition records matter?Build a section-level roof evidence file that carries verified history, observed condition, inspection limits and open actions through a property transaction.Roof conditionProperty transactionsRoof age verification
25 min read
Field GuideAPPA facility condition index: calculate comparable backlog and replacement valuesBuild an auditable facility condition index from matching asset boundaries, current corrective needs and documented replacement values.Facility Condition IndexAPPADeferred Maintenance
27 min read
Field GuideASTM E2018: turn property condition findings into capital needsConnect multi-system PCA findings to evidence, measured quantities, dated costs and an owner-ready capital schedule.ASTM E2018Property Condition AssessmentCapital Planning
25 min read
Field GuideWhat causes roof blisters, and when should you repair them?Identify the failed roof layer, confirm moisture and set a repair boundary that reaches sound material and a reliable tie-in.Roof blistersRoof moistureCore sampling
26 min read
Field GuideReplace the roof or HVAC first? A coordinated renewal scheduleCoordinate roof and RTU renewal through shared curb details, assigned handoffs, a timed outage and a checked rework ledger.Roof RenewalRTU ReplacementCapital Planning
27 min read
Field GuideCan you recoat an existing silicone roof? A primer and compatibility matrixIdentify the retained coating, select a documented primer and topcoat route, and release each roof zone with adhesion, moisture and timing records.Silicone roof coatingsRoof recoatingPrimer compatibility
26 min read
Safety, estimating, and customer operations (23)
Field GuideConstruction safety program and OSHA compliance field guideThe written safety program that keeps a crew alive and a contractor out of OSHA's crosshairs: the manual, the competent person, training, toolbox talks, the JHA, inspections, incident response, the records, and the EMR that wins or loses the bid.Safety ProgramOSHA 1926Competent Person
21 min read
Field GuideCool roofs: solar reflectance, emittance, SRI, and energyWhat a cool roof is, how solar reflectance and thermal emittance combine into SRI, the aged-value catch, the cold-climate tradeoff, and the code numbers you have to hit.Cool RoofSolar ReflectanceSRI
21 min read
Field GuideCustomer communication, reviews, and follow-up field guide for tradesHow a service business wins the next job: fast first response, the on-the-way text, a clear quote, after-photos, the review ask at the happy moment, and the follow-up that turns one job into three.Customer CommunicationOnline ReviewsCustomer Follow-Up
21 min read
Field GuideCustomer database and CRM field guide for contractorsThe single organized record of every customer, property, job, quote, and conversation, so you can find anything, follow up on nothing-falls-through, market to past customers, and keep the history when a person walks.Customer DatabaseContractor CRMClient Management
21 min read
Field GuideEmergency board-up, roof tarping, and securing a damaged buildingSecure the property fast after a fire, storm, break-in, or impact: board the openings, tarp the roof to shed water, and document the work for the claim.Emergency Board-UpRoof TarpingStorm Damage
21 min read
Field GuideSafety incident investigation and root cause analysis field guideThe disciplined response after an injury, near-miss, or property damage: care for the person, secure the scene, meet the OSHA clock, find the root cause instead of blaming the worker, and fix the system so the next crew never repeats it.Incident InvestigationRoot Cause AnalysisOSHA 1904
21 min read
Field GuideJob hazard analysis, toolbox talks, and pre-task planning field guideThe daily safety routine at the point of work: break the task into step, hazard, and control with a JHA, brief the crew with a toolbox talk, and check today's actual conditions with a pre-task plan before anyone starts.Job Hazard AnalysisToolbox TalksPre-Task Planning
21 min read
Field GuideJobsite housekeeping and slips, trips, and falls field guideA clean, clear site is a safer and faster one: clean as you go instead of a Friday blitz, keep walkways and exits clear, manage cords and hoses, pull or bend the nails, cover the holes, clear the debris, and tidy at the end of every shift.HousekeepingSlips Trips FallsOSHA 1926.25
21 min read
Field GuideLead generation and marketing field guide for tradesBuilding a steady pipeline of qualified jobs: referrals and reviews first, Google and Local Service Ads, a website that converts, speed-to-lead, tracking the source, follow-up, and a pipeline so nothing slips.Lead GenerationContractor MarketingSpeed to Lead
21 min read
Field GuideMast-climbing work platform safety field guide: OSHA, ties, base, and load chartWhat holds a mast climber up: the mast tied to the building within its free-standing limit, the base and foundation carrying the load, and the platform loaded within its load chart, with the erection done by a manufacturer-trained crew.Mast ClimberMCWPANSI/SAIA A92.9
21 min read
Field GuidePortable ladder safety field guide: OSHA extension and step ladder rulesThe setup that keeps a simple tool from putting a worker on the ground: the right ladder and duty rating, the 4 to 1 angle, the 3 foot extension and tie-off, three points of contact, no over-reaching, and the inspection that pulls a damaged ladder out of service.Ladder SafetyOSHA 1926.1053Extension Ladders
21 min read
Field GuideRoof tear-off vs recover: the commercial reroof decisionWhen to recover the roof and when to strip it to the deck: the two-layer code limit, the moisture survey that settles the call, wind attachment, cost and life, disposal, and staying dry while the deck is open.Roof RecoverRoof Tear-offReroofing
21 min read
Field GuideRoof fall protection and OSHA compliance field guideWhat OSHA requires before anyone goes up: the trigger height, the systems hierarchy, guardrails, personal fall arrest, warning lines, skylights, the competent person, and the rescue plan that has to exist before the fall.Fall ProtectionOSHA 1926.501Personal Fall Arrest
21 min read
Field GuideRoof hatch access and fall protection field guideHow people get onto and off a roof safely: the hatch, the fixed ladder or ships ladder or stair, the railing and self-closing gate at the opening, the roof edge, the flashed curb, and the skylights that read like a floor.Roof HatchRoof AccessFixed Ladder Safety
21 min read
Field GuideRoof measurement and estimating in squares field guideMeasuring a roof and estimating materials in squares: roof area and the slope factor, waste, bundles per square, underlayment, and the linear-foot items for drip edge, starter, ridge cap, and valley.Roof MeasurementRoofing SquaresSlope Factor
21 min read
Field GuideCommercial roof replacement cost in 2026: scope and worked budgetsAnvilfield research puts the planning range for an insulated low-slope membrane roof replacement at $12 to $20 per square foot. Compare complete assemblies and site-specific scope.Commercial RoofingRoof Replacement CostRoof Estimating
18 min read
Field GuideRoofing underlayment types: felt, synthetic, and self-adhered field guideThe layer between the deck and the covering, type by type: asphalt felt, synthetic, and self-adhered ice and water shield, with the slope rule, fastening, exposure, and where each one belongs.Roof UnderlaymentSynthetic UnderlaymentAsphalt Felt
21 min read
Field GuidePermanent rooftop fall protection systems for building ownersHow a building owner protects the workers who come back to a roof for years: the hierarchy, permanent guardrails, warning lines, walkways, skylight and hatch guards, engineered anchors and lifelines, inspection, and the rescue plan.Fall ProtectionOSHA 1910Roof Anchors
21 min read
Field GuideSingle-ply roof attachment methods and wind uplift designHow a single-ply membrane and its insulation get held to the deck against wind uplift: mechanically attached, fully adhered, induction-welded, and ballasted, matched to the FM and ASCE 7 wind design.Single-Ply RoofingWind UpliftMechanically Attached
21 min read
Field GuideSnow guard and snow retention systems field guideWhat snow retention does, the rooftop avalanche it prevents, pad guards vs rail systems, clamp-on and adhesive attachment, the engineered layout, and matching the system to the roof.Snow GuardsSnow RetentionSnow Rails
21 min read
Field GuideSpray polyurethane foam (SPF) roof field guide for commercial crewsWhat an SPF roof is, the foam-and-coating system, the weather window that makes or breaks the bond, slope built in foam, the granules, and the recoat that keeps it alive.Spray Polyurethane FoamSPF RoofingRoof Recover
21 min read
Field GuideSupported scaffold safety field guide: OSHA Subpart L frame and mobileWhat keeps a built work platform from killing the crew on it: firm footing on base plates and mud sills, full planking, guardrails, capacity, tie-ins, proper access, and the competent person who inspects it before every shift.Scaffold SafetyOSHA 1926.451Supported Scaffolds
21 min read
Field GuideSuspended scaffold and swing stage safety field guide: OSHA Subpart LWhat keeps a crew alive on a platform hung off the roof: the worker rides a separate independent lifeline, the rigging is counterweighted and tied back, the wire rope is inspected before every shift, and a rescue plan exists before anyone goes over the edge.Suspended ScaffoldSwing StageOSHA 1926.451
21 min read
Roofing calculators
Fall clearance calculatorFind the clearance a personal fall arrest system needs below the anchor: free fall + deceleration + worker height + a safety margin.R-value thickness calculatorFind the insulation thickness for a target R-value: thickness = target R divided by the material's R per inch.Ladder setback calculatorSet a ladder safely with the 4 to 1 rule: base setback = height to contact divided by four.Coating coverage calculatorFind the paint or coating needed: gallons = area x coats / the coverage rate, plus waste.Roof squares calculatorEstimate roofing squares from the building footprint and the pitch: roof area = footprint x the pitch multiplier, and one square is 100 square feet.
Roofing readiness checks
Envelope readinessA 2 minute check on whether the air barrier, insulation, and moisture control are working together, before high bills, condensation, or rot prove they are not.Roof maintenance readinessA 2 minute check on whether your low-slope roof is on a real maintenance program, before a clogged drain or a skipped inspection turns into an interior leak and a voided warranty.Drone inspection readinessA 2 minute check on whether your drone inspections are flown legally, capture the thermal data that matters, and feed a report the crew can act on.Facade access readinessA 2 minute check on whether your swing stage, mast climber, or scaffold is rigged, tied, loaded, and tied off so a failure does not drop someone off the building.Fall-protection complianceA 2 minute check on the program OSHA actually looks for, before a fall or an inspection finds the gap for you.Jobsite safety readinessA 2 minute check on whether your crews are actually protected from the hazards that kill in the trades, before an injury or an OSHA inspection finds the gap for you.Siding install readinessA 2 minute check on whether your siding job has the water barrier, flashing, and install details that actually keep the wall dry.Single-ply seam and attachment QA readinessA 2-minute check that catches the missing trial weld, the unprobed seam, and the untested deck before they cost you the warranty.Storm claim documentation readinessA quick check of whether your crew has the verification, test squares, photos, and legal guardrails a storm claim needs before tear-off.
Compare Roofing options
Shingle vs Standing SeamAsphalt shingle vs Standing-seam metalBUR vs single-plyBuilt-up roof (BUR) vs Single-ply membraneEPDM vs PVCEPDM membrane vs PVC membraneMech-attached vs adheredMechanically-attached single-ply vs Fully-adhered single-plyMod-bit vs BURModified bitumen vs Built-up roof (BUR)Tear-off vs RecoverTear-off vs Recover (overlay)
Roofing field tools
BlindSide Spark DCSets spark holiday-test voltage, maps membrane holidays, and exports a signed survey package.CricketWrightSizes roof crickets at twice the field slope and counts tapered polyiso boards into a cut-and-stack layout.DrainPass RoofChecks roof slope, crickets, and 48-hour ponding tests against the stamped plan on low-slope roofs.FilmProofRecords dry-film-thickness readings, runs SSPC-PA2 spot and area math, and exports a signed conformance report.PanelRunLays out metal roof panels per plane with panel count, seam layout, sliver split, and cut lengths.SteelCoatOffline structural-steel coating takeoffs for paintable sqft, coat gallons, kit counts, and bid sheets.UpliftZoneDraws ASCE 7-22 roof wind zones, computes uplift pressures, and exports a counted fastening-plan PDF.VectorMap ELDPlans roof electronic leak detection surveys, pins breaches on a grid, and exports the report.
On the job
Run roofing jobs through FieldOS: capture the work in the field, build photo and checklist proof, send a clean record, and get paid, offline. See how FieldOS works.