Field reference
Codes and standards
The 181 codes and standards most referenced across the Anvilfield field guides, each with the guides that put it to work in the field. Confirm the current adopted edition with the authority having jurisdiction.
On the job
FieldOS captures the inspections, readings, and sign-offs that prove work meets these codes, and turns a finished job into a clean proof page. See how FieldOS works.
ANSI
ANSI A300American National Standard for Tree Care Operations.9 guidesANSI Z223.1National Fuel Gas Code (also NFPA 54).8 guidesANSI Z60.1American Standard for Nursery Stock.5 guidesANSI/ESD S20.20A published standard from ANSI, referenced across the Anvilfield field guides below.4 guidesANSI Z133American National Standard safety requirements for arboriculture (tree care operations).3 guides
ASHRAE
ASHRAE TC 9.9A published standard from ASHRAE, referenced across the Anvilfield field guides below.62 guidesASHRAE 90.1Energy Standard for Buildings Except Low-Rise Residential Buildings.51 guidesASHRAE 62.1Ventilation for Acceptable Indoor Air Quality.27 guidesASHRAE Guideline 0The Commissioning Process.14 guidesASHRAE 15Safety Standard for Refrigeration Systems.11 guidesASHRAE 188Legionellosis: Risk Management for Building Water Systems.9 guidesASHRAE 90.4Energy Standard for Data Centers.8 guidesASHRAE 180A published standard from ASHRAE, referenced across the Anvilfield field guides below.7 guidesASHRAE 34Designation and Safety Classification of Refrigerants.7 guidesASHRAE Guideline 36High-Performance Sequences of Operation for HVAC Systems.7 guidesASHRAE 202Commissioning Process for Buildings and Systems.5 guidesASHRAE 55Thermal Environmental Conditions for Human Occupancy.5 guidesASHRAE Guideline 12Managing the Risk of Legionellosis Associated with Building Water Systems.4 guidesASHRAE 111Measurement, Testing, Adjusting, and Balancing of Building HVAC Systems.3 guidesASHRAE Guideline 21Ventilation and Thermal Management of Batteries for Stationary Applications (with IEEE 1635).3 guides
ASME
ASTM International
ASTM C1153Practice for Locating Wet Insulation in Roofing Systems Using Infrared Imaging.12 guidesASTM C39Test Method for Compressive Strength of Cylindrical Concrete Specimens.12 guidesASTM F2170Test Method for Relative Humidity in Concrete Floor Slabs Using in-situ Probes.12 guidesASTM C31Practice for Making and Curing Concrete Test Specimens in the Field.10 guidesASTM D6433Practice for Roads and Parking Lots Pavement Condition Index (PCI) Surveys.10 guidesASTM E1155Test Method for Determining Floor Flatness and Levelness (FF/FL).10 guidesASTM F1869Test Method for Measuring Moisture Vapor Emission Rate (calcium chloride).10 guidesASTM C143Test Method for Slump of Hydraulic-Cement Concrete.7 guidesASTM C1583Test Method for Tensile Strength of Concrete Surfaces (pull-off) for repair bond.7 guidesASTM C309Specification for Liquid Membrane-Forming Compounds for Curing Concrete.7 guidesASTM C1074Practice for Estimating Concrete Strength by the Maturity Method.6 guidesASTM C876Test Method for Corrosion Potentials of Uncoated Reinforcing Steel in Concrete.6 guidesASTM D2041Test Method for Theoretical Maximum Specific Gravity of Asphalt Mixtures (Rice).6 guidesASTM D2950Test Method for Density of Asphalt Mixtures in Place by Nuclear Methods.6 guidesASTM D6083Specification for Liquid-Applied Acrylic Coating Used in Roofing.6 guidesASTM C1064Test Method for Temperature of Freshly Mixed Hydraulic-Cement Concrete.5 guidesASTM C1152A published standard from ASTM International, referenced across the Anvilfield field guides below.5 guidesASTM C138Test Method for Density (Unit Weight), Yield, and Air Content of Concrete.5 guidesASTM C231Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method.5 guidesASTM C94Specification for Ready-Mixed Concrete.5 guidesASTM D6694Specification for Liquid-Applied Silicone Coating Used in Spray Polyurethane Foam Roofing.5 guidesASTM D7954A published standard from ASTM International, referenced across the Anvilfield field guides below.5 guidesASTM E1745Specification for Water Vapor Retarders Used Under Concrete Slabs on Grade.5 guidesASTM C172Practice for Sampling Freshly Mixed Concrete.4 guidesASTM C173Test Method for Air Content of Freshly Mixed Concrete by the Volumetric Method.4 guidesASTM C260Specification for Air-Entraining Admixtures for Concrete.4 guidesASTM C42Test Method for Obtaining and Testing Drilled Cores and Sawed Beams of Concrete.4 guidesASTM D226Specification for Asphalt-Saturated Organic Felt Used in Roofing and Waterproofing.4 guidesASTM D7234A published standard from ASTM International, referenced across the Anvilfield field guides below.4 guidesASTM E1105A published standard from ASTM International, referenced across the Anvilfield field guides below.4 guidesASTM E119Test Methods for Fire Tests of Building Construction and Materials.4 guidesASTM E2018A published standard from ASTM International, referenced across the Anvilfield field guides below.4 guidesASTM E2393Practice for On-Site Inspection of Installed Fire-Resistive Joint Systems and Perimeter Fire Barriers.4 guidesASTM E814Test Method for Fire Tests of Penetration Firestop Systems.4 guidesASTM F2200Specification for Automated Vehicular Gate Construction.4 guidesASTM F710Practice for Preparing Concrete Floors to Receive Resilient Flooring.4 guidesASTM A615Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement.3 guidesASTM B88A published standard from ASTM International, referenced across the Anvilfield field guides below.3 guidesASTM C1315Specification for Liquid Membrane-Forming Curing and Sealing Compounds for Concrete.3 guidesASTM C1611Test Method for Slump Flow of Self-Consolidating Concrete.3 guidesASTM C1701Test Method for Infiltration Rate of In Place Pervious Concrete.3 guidesASTM C1782Specification for Segmental Concrete Paving Slabs.3 guidesASTM C270Specification for Mortar for Unit Masonry.3 guidesASTM C33Specification for Concrete Aggregates.3 guidesASTM C476Specification for Grout for Masonry.3 guidesASTM C494Specification for Chemical Admixtures for Concrete.3 guidesASTM C936Specification for Solid Concrete Interlocking Paving Units.3 guidesASTM D1557Test Methods for Laboratory Compaction of Soil Using Modified Effort (Modified Proctor).3 guidesASTM D4541A published standard from ASTM International, referenced across the Anvilfield field guides below.3 guidesASTM D4637Specification for EPDM Sheet Used in Single-Ply Roof Membranes.3 guidesASTM D6878A published standard from ASTM International, referenced across the Anvilfield field guides below.3 guidesASTM D698Test Methods for Laboratory Compaction of Soil Using Standard Effort (Standard Proctor).3 guidesASTM D8231A published standard from ASTM International, referenced across the Anvilfield field guides below.3 guidesASTM E108A published standard from ASTM International, referenced across the Anvilfield field guides below.3 guidesASTM E1592A published standard from ASTM International, referenced across the Anvilfield field guides below.3 guidesASTM E2174Practice for On-Site Inspection of Installed Firestops.3 guidesASTM E84A published standard from ASTM International, referenced across the Anvilfield field guides below.3 guidesASTM E96A published standard from ASTM International, referenced across the Anvilfield field guides below.3 guides
American Concrete Institute
ACI 318Building Code Requirements for Structural Concrete.42 guidesACI 301Specifications for Concrete Construction.19 guidesACI 302Guide to Concrete Floor and Slab Construction.14 guidesACI 330Guide for the Design and Construction of Concrete Parking Lots.7 guidesACI 360Guide to Design of Slabs-on-Ground.7 guidesACI 117Specification for Tolerances for Concrete Construction and Materials.6 guidesACI 305Guide to Hot Weather Concreting.6 guidesACI 306Guide to Cold Weather Concreting.6 guidesACI 308Guide to External Curing of Concrete.6 guidesACI 355Anchorage to concrete: qualification and design of cast-in and post-installed anchors.4 guidesACI 224Guide to control of cracking in concrete structures.3 guidesACI 347Guide to Formwork for Concrete.3 guidesACI 522Report on Pervious Concrete.3 guidesACI 546Guide to concrete repair.3 guides
American Society of Civil Engineers
American Water Works Association
American Welding Society
IEEE
IEEE 1584Guide for Performing Arc-Flash Hazard Calculations.9 guidesIEEE 802.3Standard for Ethernet.8 guidesIEEE 1547Standard for Interconnection of Distributed Energy Resources with Electric Power Systems.5 guidesIEEE 1100Recommended Practice for Powering and Grounding Electronic Equipment (Emerald Book).4 guidesIEEE 1184Guide for Batteries for Uninterruptible Power Supply Systems.4 guidesIEEE 1188Recommended Practice for Maintenance, Testing, and Replacement of VRLA Batteries.4 guidesIEEE 142Recommended Practice for Grounding of Industrial and Commercial Power Systems (Green Book).4 guidesIEEE 400Guide for Field Testing and Evaluation of the Insulation of Shielded Power Cable Systems.4 guidesIEEE 802A published standard from IEEE, referenced across the Anvilfield field guides below.4 guidesIEEE 1106Recommended Practice for Maintenance, Testing, and Replacement of Nickel-Cadmium Batteries.3 guidesIEEE 1635Guide for the Ventilation and Thermal Management of Stationary Battery Installations.3 guidesIEEE 242Recommended Practice for Protection and Coordination of Industrial and Commercial Power Systems (Buff Book).3 guidesIEEE 400.2Guide for Field Testing of Shielded Power Cable Systems Using Very Low Frequency (VLF).3 guidesIEEE 450Recommended Practice for Maintenance, Testing, and Replacement of Vented Lead-Acid Batteries.3 guidesIEEE 519Recommended Practice and Requirements for Harmonic Control in Electric Power Systems.3 guides
IICRC
InterNational Electrical Testing Association
International Code Council
IPCInternational Plumbing Code.65 guidesIBCInternational Building Code.61 guidesUPCUniform Plumbing Code.61 guidesIRCInternational Residential Code.24 guidesIECCInternational Energy Conservation Code.23 guidesIMCInternational Mechanical Code.18 guidesIFGCInternational Fuel Gas Code.7 guidesIFCInternational Fire Code.5 guides
National Fire Protection Association
NECThe U.S. standard for electrical wiring and installation, published by the NFPA as NFPA 70.181 guidesNFPA 70EStandard for Electrical Safety in the Workplace, covering arc-flash and shock protection.38 guidesNFPA 110Standard for Emergency and Standby Power Systems.30 guidesNFPA 72National Fire Alarm and Signaling Code.17 guidesNFPA 54National Fuel Gas Code (also ANSI Z223.1).13 guidesNFPA 70BStandard for Electrical Equipment Maintenance.12 guidesNFPA 75Standard for the Fire Protection of Information Technology Equipment.12 guidesNFPA 855Standard for the Installation of Stationary Energy Storage Systems.12 guidesNFPA 13Standard for the Installation of Sprinkler Systems.10 guidesNFPA 101Life Safety Code.8 guidesNFPA 25Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems.8 guidesNFPA 96Standard for Ventilation Control and Fire Protection of Commercial Cooking Operations.8 guidesNFPA 99Health Care Facilities Code.7 guidesNFPA 76Standard for the Fire Protection of Telecommunications Facilities.6 guidesNFPA 780Standard for the Installation of Lightning Protection Systems.5 guidesNFPA 2001Standard on Clean Agent Fire Extinguishing Systems.4 guidesNFPA 30Flammable and Combustible Liquids Code.4 guidesNFPA 1Fire Code.3 guidesNFPA 10Standard for Portable Fire Extinguishers.3 guidesNFPA 20Standard for the Installation of Stationary Pumps for Fire Protection.3 guidesNFPA 58Liquefied Petroleum Gas Code.3 guidesNFPA 68Standard on Explosion Protection by Deflagration Venting.3 guidesNFPA 69Standard on Explosion Prevention Systems.3 guidesNFPA 79A published standard from National Fire Protection Association, referenced across the Anvilfield field guides below.3 guidesNFPA 80Standard for Fire Doors and Other Opening Protectives.3 guidesNFPA 90AStandard for the Installation of Air-Conditioning and Ventilating Systems.3 guides
SMACNA
Standards body
Uptime InstituteA published standard from Standards body, referenced across the Anvilfield field guides below.64 guidesTIA-942A published standard from Standards body, referenced across the Anvilfield field guides below.40 guidesTIA-568A published standard from Standards body, referenced across the Anvilfield field guides below.14 guidesTIA-606A published standard from Standards body, referenced across the Anvilfield field guides below.12 guidesTier IIIA published standard from Standards body, referenced across the Anvilfield field guides below.8 guidesTier IVA published standard from Standards body, referenced across the Anvilfield field guides below.8 guidesISO/IEC 30134A published standard from Standards body, referenced across the Anvilfield field guides below.7 guidesTIA-607A published standard from Standards body, referenced across the Anvilfield field guides below.7 guidesTIA-569A published standard from Standards body, referenced across the Anvilfield field guides below.5 guidesISO 8528A published standard from Standards body, referenced across the Anvilfield field guides below.4 guidesISO/IEC 11801A published standard from Standards body, referenced across the Anvilfield field guides below.4 guidesISO/IEC 14763A published standard from Standards body, referenced across the Anvilfield field guides below.4 guidesISO 19650A published standard from Standards body, referenced across the Anvilfield field guides below.3 guidesTIA-942-CA published standard from Standards body, referenced across the Anvilfield field guides below.3 guidesTier IA published standard from Standards body, referenced across the Anvilfield field guides below.3 guides
U.S. OSHA
Underwriters Laboratories
UL 9540ATest Method for Thermal Runaway Fire Propagation in Battery Energy Storage Systems.9 guidesUL 9540Standard for Energy Storage Systems and Equipment.8 guidesUL 1479Standard for Fire Tests of Penetration Firestops.4 guidesUL 325Standard for Door, Drapery, Gate, Louver, and Window Operators and Systems.4 guidesUL 489Standard for Molded-Case Circuit Breakers, Molded-Case Switches, and Circuit-Breaker Enclosures.4 guidesUL 1008Standard for Transfer Switch Equipment.3 guidesUL 1449Standard for Surge Protective Devices.3 guidesUL 1741Standard for Inverters, Converters, and Controllers for Use in Distributed Energy Resources.3 guidesUL 181AStandard for Closure Systems for Use with Rigid Air Ducts.3 guidesUL 1973Standard for Batteries for Use in Stationary and Auxiliary Power Applications.3 guidesUL 467Standard for Grounding and Bonding Equipment.3 guidesUL 857A published standard from Underwriters Laboratories, referenced across the Anvilfield field guides below.3 guides