National Fire Protection Association (NFPA)
NFPA 110: Emergency and Standby Power Systems, transfer timing and fuel reserve
An NFPA 110 specification ties the required power interruption and operating duration to equipment, installation, and maintenance evidence. The current publication is the 2025 edition. A usable specification identifies the required interruption time, duration at rated load, and consequence of failure before selecting equipment. Commissioning must prove the transfer path and supporting services as well as the generator; tank capacity alone cannot establish emergency-power performance.
Applies to
Designers turn the building's required power functions into an EPSS specification; commissioning teams demonstrate that installed system; owners preserve the accepted settings and maintenance basis. NFPA 110 does not decide which building loads require emergency or legally required standby power. Stored-electrical-energy EPSS performance is the subject of NFPA 111; an engine starting battery is instead an auxiliary part of the NFPA 110 installation.
Key topics
Type 10: count the interruption through the transfer switch
Cummins' 2025 NFPA 110 training places the Type timing boundary at the transfer-switch load terminals. For a Type 10 installation, seven seconds to acceptable generator power followed by a four-second transfer delay produces an 11-second interruption, exceeding the ten-second limit. Put generator-ready and load-restored timestamps on the same event record. A generator controller showing ready does not establish when the switch restored acceptable power to the load. Class describes the separate duration duty, so extending fuel storage cannot cure that timing failure. Cummins, classification and transfer timing, slides 14 through 25
The 24-hour boundary changes the tank multiplier
Cummins' August 2025 NFPA 110 training identifies a minimum main-tank capacity of 133 percent of the low-fuel sensor quantity for classifications of 24 hours or less under section 5.5.3.1. NFPA 110-2025 section 5.5.3.2 requires main-tank capacity of at least 100 percent of the low-fuel sensor quantity for classifications greater than 24 hours, as documented by Cummins. The boundary includes a 24-hour classification in the higher-multiplier group. A blanket instruction to add one-third to every runtime tank misses this edition change. Cummins, fuel tank capacity, slide 55
Submittal worksheet: sensor quantity, usable fuel and vessel volume
For a Class X design specifying 24 hours and a documented low-fuel sensor quantity of 1,800 gallons, the 2025 minimum main-tank calculation is 1,800 × 1.33 = 2,394 gallons. For a duration above 24 hours and a documented sensor quantity of 3,600 gallons, it is 3,600 × 1.00 = 3,600 gallons. These calculations apply the two multipliers on Cummins' slide 55. Show the sensor quantity, rated-load duration, nominal vessel capacity, usable fuel, and fill limit as distinct submittal fields. The selected tank and sensor elevation must support the approved quantities. Cummins, main-tank capacity
The 2025 start-signal requirement reaches the controls contractor
NFPA 110-2025 section 5.6.5.9 requires Level 1 remote start circuits to be monitored for broken, disconnected, or shorted wiring and requires those faults to start the EPS, according to Cummins' edition briefing. Include the remote device, wiring interface, annunciation, and specified fault response in the controls submittal and witnessed acceptance record. Distinguish an engine start from a load transfer: a recorded fault-start result does not itself demonstrate the transfer sequence. Cummins, Level 1 start-signal integrity, slide 24
Long runtime creates a fuel-turnover obligation
NFPA 110-2025 section 7.9.1.5 calls for tank sizing that permits fuel consumption within its storage life, or fuel remediation or replacement, as summarized by Cummins. A larger reserve changes the owner's turnover problem as well as the outage duration. The turnover worksheet pairs stored gallons with annual consumption and names who will restore or replace aged fuel. Cummins, fuel storage provisions, slide 54
How it is used in the field
Build a fuel worksheet with one line for every engine drawing from a tank. Show the published consumption at the specified operating duty, the duration, sensor quantity, and edition-dependent capacity multiplier. A parallel plant also needs the operating engine combination recorded so later load changes have a traceable starting point.
Review the whole fuel path with the mechanical scope: bulk storage, transfer pumps, day tanks, control power, level signals, and engine connections. Carry tank calibration information into commissioning. A correctly sized vessel with a wrongly located level switch produces a different reserve than the approved calculation.
Separate acceptance evidence from subsequent maintenance records. The owner needs the approved design basis and actual equipment settings to judge later changes in load or storage. A load-bank report without the associated tank and alarm documentation leaves the fuel reserve unproven on paper.
Adoption
Seattle's 2021 Fire Code Chapter 80 identifies NFPA 110-2019 as its referenced edition. Sections 1203.1.3, 1203.4, and 1203.5 bring that standard into installation, maintenance, and operational testing. The 2025 fuel and start-signal changes described above belong to a newer publication; the Seattle citation does not by itself adopt them. Seattle application provisions; Referenced edition
Quarterly monitoring through PorchRocket Asset Search reports generators added, removed, or altered, with dated views for updating the fuel-service route.
Frequently asked questions
Does a 48-hour classification still require the 133-percent multiplier?
The 2025 main-tank provision uses the 100-percent minimum for classifications above the stated boundary. Retain any additional volume required by the actual tank arrangement, usable-fuel calculation, project specification, or adopted earlier edition.
Can a day-tank capacity be substituted for the main-tank calculation?
A day tank establishes a local supply volume; the main reserve worksheet must also demonstrate replenishment throughout the specified duration. Follow the transfer pumps, power supply, controls, and level signals on the coordinated drawing. Retain the tank calibration and approved alarm settings with that worksheet.
Sources checked
- NFPA 110: current edition, development record, and official access
- Cummins: NFPA 110 for Emergency Power Systems, August 21, 2025
- Seattle 2021 Fire Code, Chapter 12, section 1203
- Seattle 2021 Fire Code, Chapter 80: NFPA 110-2019 reference
- NFPA 111: stored-electrical-energy emergency and standby system scope