ANVILFIELD Try FieldOS

Field quizzes

Readiness checks by trade

Quick, honest self-checks for the work that goes wrong when a step is missed. Score on your device, then take the right tool and field guide to the job.

Readiness check

Arc flash readiness

A 2 minute check on whether your electrical safety program would actually protect a worker from an arc flash, before an incident or an OSHA inspector tests it.

Readiness check

Cash flow readiness

A 2 minute check on whether you run a WIP, bill early, and collect fast, before a profitable company runs out of cash.

Readiness check

Contractor business health

A 2 minute check on whether your trade business is run on numbers and cash discipline, before a profitable-looking year quietly turns into a payroll you cannot make.

Readiness check

Conveyor safety readiness

A 2 minute check on whether your conveyor is guarded, e-stopped, locked out, and aligned, before a nip point takes a hand or a jam-clear takes a worker.

Readiness check

Cathodic protection check

A 2 minute check on whether your CP system is coated, sized, proven to criterion, and monitored, before corrosion eats a pipeline, tank, or structure you thought was protected.

Readiness check

Crane & rigging readiness

A 2 minute check on whether your crane pick is planned, rigged, and signaled to land safely, before a dropped load or a tip-over proves it was not.

Readiness check

Sign install readiness

A 2 minute check on whether your electric sign has the code disconnect, the wind-rated structure, and the permit, before it fails inspection or comes down in a storm.

Readiness check

Electrical safety and LOTO

A 2 minute check on the electrical safety practices that decide whether a worker goes home, before an arc flash or a re-energized circuit decides for you.

Readiness check

Elevator readiness

A 2 minute check for owners and PMs on whether your elevators are under the right contract, modernized in time, and kept up to code, before they strand tenants.

Readiness check

Energy audit readiness

A 2 minute check on whether your energy effort starts with the data, captures the free operational savings, and proves the results.

Readiness check

Estimating health check

A 2 minute check on whether your bids actually recover your costs and win the right work, or quietly bleed margin one job at a time.

Readiness check

Fleet & DOT readiness

A 2 minute check on whether your service trucks and drivers would pass a DOT review and keep your crews safe, before a roadside inspection or a crash finds the gaps.

Readiness check

Surety bonding readiness

A 2 minute check on whether you understand surety bonds and have the financials, WIP, and relationship to grow your bonding capacity.

Readiness check

Safety wearable readiness

A 2 minute check on whether your safety wearables are calibrated, wired to a real response, and actually worn, before you trust them to catch a gas, fall, or heat event.

Readiness check

Hot work safety check

A 2 minute check on whether your welding, cutting, and compressed-gas work has the permit, fire watch, clearance, and cylinder controls to avoid a fire or an explosion.

Readiness check

Bridge deck readiness

A 2 minute check on whether your bridge deck is built or rehabbed to stop chloride corrosion, before the deck spalls again and the structure suffers.

Readiness check

Coating durability check

A 2 minute check on whether your coating or lining job is set up to hold for years, before it peels at the one spot you skipped and the whole thing fails early.

Readiness check

Pool construction readiness

A 2 minute check on whether your commercial pool is engineered for uplift, shot void-free, plumbed-and-tested, and drain-compliant, before it floats, leaks, or fails inspection.

Readiness check

Concrete pour readiness

A 2 minute check before the first truck rolls, so weather, subgrade, and a missed test do not cost you the slab.

Readiness check

Layout readiness

A 2 minute check on whether your construction layout comes from a protected control network, the right tool and tolerance, and a verify before the pour.

Readiness check

Construction robotics readiness

A 2 minute check on whether a jobsite robot fits the task, the model, and the safety plan, before you buy hype instead of help.

Readiness check

Demolition readiness

A 2 minute check on whether your demo job is surveyed, made safe, and contained before you swing a hammer, not after you hit asbestos or a live wire.

Readiness check

Excavation readiness

A 2 minute check on whether the dig and the foundation are set up to avoid a collapse, a flood, or a settling building, before the excavator turns the first bucket.

Readiness check

Jobsite camera readiness

A 2 minute check on whether your camera system has the response, power, and privacy compliance to deter theft and document the site, not just record it.

Readiness check

Jobsite security readiness

A 2 minute check on whether your site layers its security, locks up the high-value gear, and can recover what walks off.

Readiness check

Lean construction readiness

A 2 minute check on whether your work is planned to flow, with constraints removed before the crew shows up, or just pushed and hoped.

Readiness check

Metal building readiness

A 2 minute check on whether your pre-engineered metal building has the anchor bolts, bracing, and sequence right, before a frame will not land or a wall collapses.

Readiness check

Silica control readiness

A 2 minute check on whether your crew controls respirable silica at the source and meets the OSHA standard, before the dust scars lungs or draws a citation.

Readiness check

Fireproofing readiness

A 2 minute check on whether your spray fireproofing is applied to the listed thickness, bonded to the steel, inspected, and patched, before the rating is silently void.

Readiness check

Stucco/EIFS readiness

A 2 minute check on whether your stucco or EIFS drains the water out, before trapped water rots the wall like the EIFS failures of the 90s.

Readiness check

Tenant improvement readiness

A 2 minute check on whether your TI is set up to hit the move-in date, with the permit, long-lead items, and allowance under control.

Readiness check

Tile install readiness

A 2 minute check on whether your tile job has the substrate, coverage, waterproofing, and movement joints to hold, before it cracks, tents, or leaks.

Readiness check

Cold storage readiness

A 2 minute check on whether your refrigerated warehouse handles the floor heave, vapor drive, and ammonia risk a walk-in never faces, before the slab cracks or a leak shuts you down.

Readiness check

Succession & exit readiness

A 2 minute check on whether your business is built to transfer for real value, before the day you want out arrives and you find out it is worth less than you hoped.

Readiness check

EPA 608 practice test

Ten questions across the Core section and all four certification types, the way the real EPA 608 exam splits the work.

Readiness check

HVAC Cx readiness

A 2 minute check on whether an HVAC system will actually pass commissioning and run as designed, before the Cx agent and the owner find the problems.

Readiness check

IAQ monitoring readiness

A 2 minute check on whether your IAQ monitoring uses good sensors, watches the right things, and triggers a real response, or just shows numbers.

Readiness check

NFPA 96 grease exhaust readiness

A 2-minute check on whether the grease path, its fire protection, and the records are actually ready before the fire marshal walks it.

Readiness check

Predictive maintenance check

A 2 minute check on whether your maintenance catches failures developing on the critical equipment, or just reacts after they break.

Readiness check

Brazing and evacuation readiness

A two-minute check that catches the setup gaps that seed scale, hide leaks, and leave moisture in the system.

Readiness check

Retro-commissioning readiness

A 2 minute check on whether your existing building is tuned to work as intended, or quietly drifting and wasting energy.

Readiness check

RTU startup readiness

A 2-minute check that catches the curb, trap, rotation, airflow, charge, and rise gaps before you sign the startup sheet.

Readiness check

Warranty management readiness

A 2 minute check on whether you track warranties, catch defects before they expire, and triage callbacks, or let the warranty year drift.

Readiness check

Backflow test readiness

Catches the expired cert, the out-of-cal gauge, or the unbled line that gets a clean assembly reported wrong or the report bounced.

Readiness check

Confined space readiness

A 2 minute check on whether your confined-space entries are permitted, tested, and rescue-ready, before an atmosphere or a would-be rescuer turns one death into three.

Readiness check

Fire protection readiness

A 2 minute check on whether the sprinklers, fire pump, and standpipes would actually do their job in a fire, before an inspection or an incident finds out for you.

Readiness check

Fire restoration readiness

A 2 minute check on whether your fire and smoke cleanup matches the soot type, dries the water first, and kills the odor at the source.

Readiness check

Medical gas piping readiness

A 2-minute check that catches the credential, brazing, and verification gaps that keep a system from being used on a patient.

Readiness check

Process piping weld check

A 2 minute check on whether your process piping is welded, examined, and tested to the fluid service it carries, before a failed weld leaks something hazardous.

Readiness check

Loss response readiness

A 2 minute check on whether your team can respond to a water, fire, or biohazard loss safely, correctly, and in a way the insurer will pay, before the next call comes in.

Readiness check

Water restoration readiness

A 2 minute check on whether your water mitigation moves fast enough, dries to standard, and documents the job, before mold sets in or the claim is denied.

Readiness check

Water heater install readiness

A 2-minute check that catches the missing demand number, unproven draft, and starved combustion air before you set the unit.

Readiness check

Treatment plant readiness

A 2 minute check on whether your water or wastewater plant work is controlling the gases, confined spaces, biological process, and discharge permit, before a fatality or a violation.

Readiness check

BIM coordination readiness

A 2 minute check on whether your model coordination actually resolves clashes before the field, before a duct meets a beam on site.

Readiness check

Connected jobsite readiness

A 2 minute check on whether your IoT and RTLS data actually changes decisions, with the connectivity, platform, and privacy to make it work.

Readiness check

AI density readiness

A 2 minute check on whether your facility can actually power, cool, connect, and support the 50-to-130kW+ AI racks the build-out is bringing, before you commit the space.

Readiness check

Data center Cx readiness

A 2 minute check on whether the project is actually ready to commission, before a squeezed Cx schedule or a missed failure test turns into a go-live outage.

Readiness check

Liquid cooling readiness

A 2 minute check on whether your facility and team can deploy and operate liquid cooling safely and reliably, before the first leak or the first stranded GPU rack proves you were not.

Readiness check

DC ops readiness

A 2 minute check on whether your day-2 operations actually deliver the uptime the facility was designed for, before a human-error outage proves they do not.

Readiness check

Digital twin readiness

A 2 minute check on whether your digital twin is connected, current, and actually used to operate the building, or just a static model on a shelf.

Readiness check

Turnover and closeout readiness

A 2 minute check before you call a job done, so a missing as-built or test report does not hold your retention hostage.

Readiness check

Quality control readiness

A 2 minute check on whether your QC program builds quality in with an ITP and hold points, or just catches defects at the end.

Readiness check

Reality capture readiness

A 2 minute check on whether your laser scanning ties to control, hits the right accuracy, and actually gets used to verify the build.

Readiness check

Switchgear delivery readiness

A 2 minute readiness check before the gear hits the dock, so a tripped indicator or a missed claim window does not become your problem.

Readiness check

Envelope readiness

A 2 minute check on whether the air barrier, insulation, and moisture control are working together, before high bills, condensation, or rot prove they are not.

Readiness check

Roof maintenance readiness

A 2 minute check on whether your low-slope roof is on a real maintenance program, before a clogged drain or a skipped inspection turns into an interior leak and a voided warranty.

Readiness check

Drone inspection readiness

A 2 minute check on whether your drone inspections are flown legally, capture the thermal data that matters, and feed a report the crew can act on.

Readiness check

Facade access readiness

A 2 minute check on whether your swing stage, mast climber, or scaffold is rigged, tied, loaded, and tied off so a failure does not drop someone off the building.

Readiness check

Fall-protection compliance

A 2 minute check on the program OSHA actually looks for, before a fall or an inspection finds the gap for you.

Readiness check

Jobsite safety readiness

A 2 minute check on whether your crews are actually protected from the hazards that kill in the trades, before an injury or an OSHA inspection finds the gap for you.

Readiness check

Siding install readiness

A 2 minute check on whether your siding job has the water barrier, flashing, and install details that actually keep the wall dry.

Readiness check

Single-ply seam and attachment QA readiness

A 2-minute check that catches the missing trial weld, the unprobed seam, and the untested deck before they cost you the warranty.

Readiness check

Storm claim documentation readiness

A quick check of whether your crew has the verification, test squares, photos, and legal guardrails a storm claim needs before tear-off.

Readiness check

Track surfacing readiness

A 2 minute check on whether your running track has the flat, sealed base, the right system thickness, and the geometry and certification it needs, before it ponds and fails.

Readiness check

Dock & marina readiness

A 2 minute check on whether your dock or marina handles electric shock drowning, the water environment, and the permits, before someone is hurt or the build is stopped.

Readiness check

Deck construction readiness

A 2 minute check on whether your deck has the ledger, footings, span, and guardrail to carry people safely, before a collapse or a fall.

Readiness check

Exterior cleaning check

A 2 minute check on whether your pressure and soft washing matches the method to the surface, protects people and plants, and keeps the wash water out of the storm drain.

Readiness check

Living wall readiness

A 2 minute check on whether your green wall is built as a building system, with the waterproofing, irrigation, structure, light, and maintenance it needs to survive.

Readiness check

Fire feature readiness

A 2 minute check on whether your fire pit or fireplace holds its clearances, uses rated media, and runs gas to code, before a fire, an explosion, or a code violation.

Readiness check

Outdoor kitchen readiness

A 2 minute check on whether your outdoor kitchen has the gas, ventilation, and outdoor-rated build to be safe and survive the weather.

Readiness check

Pergola readiness

A 2 minute check on whether your pergola or shade structure is anchored against wind uplift, footed below frost, and permitted, before it lifts off.

Readiness check

Playground readiness

A 2 minute check on whether your playground has the surfacing, use zones, and entrapment safety that prevent the injuries, before a fall or an audit finds them.