ANVILFIELD Try FieldOS

Readiness check

Is your energy program cutting waste or guessing at it?

An energy program works when it starts with the data, captures the free operational savings first, and proves the results, instead of jumping to capital and hoping. Answer for how your building's energy is actually managed. This is general guidance; confirm with ASHRAE and your utility program. The score stays on your device; enter an email only if you want the energy audit checklist sent over.

1. Do you benchmark the building's energy use intensity against similar buildings before acting?
2. Do you analyze 12+ months of utility bills (energy, demand, rate) before the walk-through?
3. Is the audit matched to the decision (Level 1 walkthrough vs Level 2 detailed vs Level 3 investment-grade)?
4. Do you capture the free and low-cost operational fixes (schedules, setpoints, controls) first?
5. Are the energy conservation measures ranked by payback?
6. Do you submeter or log data so you know which systems use the energy?
7. Do you prove savings with measurement and verification (a baseline and post-install)?
8. Do you monitor so the savings persist (setpoints and controls do not drift back)?

Next step: See energy audit award winners