Concrete field guides

Concrete guides, checklists, and calculators

Slump, air, temperature, evaporation, joints, scanner maps, baseplate grout, anchors, and pour records.

125 field guides12 calculators17 readiness checks23 field toolsJump to concrete tools

Get the printable concrete field-card pack (PDF)

Where trades find buildings, assets and public work: choose a property list, custom asset search or public bid for the next account.

Latest Concrete guides

Finding customers and planning bids (2)

Slabs, joints, floors, and restoration (33)

Field GuideAdhesive and epoxy anchor installation field guideWhy the bond is the whole anchor: hole cleaning, the MPII, epoxy vs acrylic, cure time, wet holes, and the certified installer and special inspection for overhead sustained tension.Adhesive AnchorsEpoxy AnchorsACI 318 Chapter 17 21 min read Field GuideBuilding expansion and movement joint systems field guideWhat a building movement joint is, why a building that cannot move cracks itself apart, the joint family, how to size it, and how to run it continuously through every layer and keep it dry.Movement JointsExpansion JointSeismic Joint 21 min read Field GuideCommercial flooring install field guide: resilient and soft goodsTest the slab moisture before a single tile goes down, prep the subfloor, pick the right adhesive for the product, then acclimate, lay out balanced, and document for the warranty.Commercial FlooringResilient FlooringConcrete Moisture 21 min read Field GuideEpoxy and polyurethane concrete crack injection field guideWhen epoxy restores load transfer across a dormant crack, when polyurethane stops a leak, and how to diagnose movement and moisture, select resin, inject, and verify the repair.Crack InjectionEpoxy InjectionPolyurethane Injection 21 min read Field GuideConcrete sealers and coatings field guide: protect the slabPick the sealer or coating by what the slab is exposed to, test for moisture before any film goes down, prep the surface to match the product, and seal after the cure.Concrete SealerPenetrating SealerEpoxy Coating 21 min read Field GuideConcrete repair and restoration: diagnose and scope repairsPlan concrete repair from defect assessment through preparation, repair selection, and return to service. Use the joint-filler records to distinguish new installation acceptance from existing-floor maintenance.Concrete Spall RepairRebar CorrosionICRI 21 min read Field GuideConcrete control joint layout field guideLay out and cut control joints so the slab cracks where you put the joint, not where you didn't, on spacing, depth, and timing the plan can defend.Control JointsSawcut TimingSlab on Grade 21 min read Field GuideEpoxy and resinous floor coating install field guideTest the slab for moisture, prep it mechanically to the right profile, build the resin system in the recoat window, and document every test so the floor that bonds is the floor that stays bonded.Epoxy FlooringResinous FlooringConcrete Moisture 21 min read Field GuideFoundation underpinning methods and settlement repair field guideWhat underpinning is, why you find the cause of the movement before you fix it, the methods from mass-concrete pits to piers and micropiles, and the engineer, the sequence, and the records that make the repair hold.UnderpinningFoundation SettlementPush Piers 21 min read Field GuideGlass replacement and glazing repair field guide for commercial workReplacing glass means putting back the right glass: match or upgrade to the code-required safety glazing, measure and order the insulated or safety unit to size, and re-glaze it on blocks with the weeps open.Glass ReplacementSafety GlazingInsulated Glass Unit 21 min read Field GuideConcrete joint sealant replacement field guideWhat the sealant in a concrete joint actually does, why it fails, and how to rebuild it on a backer rod at the right ratio so it keeps water out and still lets the joint move.Joint SealantBacker RodASTM C920 21 min read Field GuideMasonry repointing, tuckpointing, and restoration field guideWhy the wrong mortar destroys the wall it was meant to save, how to match the original and cut the joints to depth without wrecking the units, and how to tool the profile and fix the water source above.RepointingTuckpointingHistoric Masonry 21 min read Field GuideParking structure restoration and repair field guideWhy a garage is concrete under constant chloride attack, and the program that stops the corrosion before it patches the spalls: condition survey, repair behind the bar, anodes, and waterproofing.Parking Structure RestorationChloride CorrosionCathodic Protection 21 min read Field GuidePolished concrete floor field guide: grind, densify, polishRead the slab before you grind it, step the diamonds up without skipping, densify in the right place, and hold the gloss and exposure the spec called for.Polished ConcreteConcrete DensifierACI 310.1 21 min read Field GuideIndustrial protective coatings and abrasive blasting field guideBlast the steel to the right SSPC/NACE standard and profile, keep it above the dew point, build the film thickness, stripe the edges, and inspect for holidays, because the prep, not the paint, decides whether the coating holds.Protective CoatingsAbrasive BlastingSSPC NACE 21 min read Field GuidePost-tension slab stressing field guideStress the tendons, prove the force with elongation, keep clear of the live end, and never cut a PT slab before you scan it.Post-TensioningTendon StressingElongation 21 min read Field GuideRadon and vapor-intrusion mitigation field guide for slabsWhat soil-gas mitigation does, why the air pulled up through the slab is a health hazard, sub-slab depressurization over sealing alone, the fan and the vent, and testing before and after.Radon MitigationSub-Slab DepressurizationVapor Intrusion 21 min read Field GuideRebar corrosion protection field guide: epoxy, galvanized, and beyondWhy reinforcing steel rusts and wrecks the concrete around it, and how cover, dense concrete, epoxy, galvanized, stainless, inhibitors, and cathodic protection keep it from happening.Rebar CorrosionEpoxy-Coated RebarGalvanized Rebar 21 min read Field GuideSelf-leveling underlayment floor prep field guideTest the slab for moisture, prep it mechanically, prime it, mix to the exact water, and pour a flat plane that the finished flooring can sit on without telegraphing every low spot.Self-Leveling UnderlaymentFloor PrepConcrete Moisture 21 min read Field GuideConcrete slab curling and warping control field guideWhy slab edges and corners lift off the base, what the gradient is doing, and how the mix, the cure, and the joints keep a floor flat instead of curled.Slab CurlingSlab WarpingMoisture Gradient 21 min read Field GuideConcrete slab moisture testing for flooring field guideMeasure how wet the slab is before flooring goes down, test deep with the RH probe, condition the building first, and meet the flooring manufacturer's number or mitigate.Slab Moisture TestingASTM F2170ASTM F1869 21 min read Field GuideSlab on grade design and thickness field guideWhat a slab on grade is, why the ground is half the design, how the load and the subgrade set the thickness, and what the crew builds and records to make it last.Slab on GradeSlab ThicknessACI 360 21 min read Field GuideStorage tank coating and interior lining field guideMatch the interior lining to the stored product and make it holiday-free, use NSF 61 on potable water and cure it before filling, and run the tank interior as a confined space with an explosive atmosphere.Tank LiningStorage Tank CoatingNSF 61 21 min read Field GuideWater tower inspection and coating: condition, scope, and acceptanceInspect the sanitary barriers, steel, and existing coating before selecting repairs, then carry preparation, cure, and drinking-water release through the same outage plan.Water TowersTank InspectionProtective Coatings 18 min read Field GuideTerrazzo flooring field guide: install, grind, and polishPrep and test the slab for moisture before epoxy terrazzo, lay the divider strips over the joints to control the cracking, then grind, grout, and polish to expose the chips and fill the pinholes.TerrazzoEpoxy TerrazzoDivider Strips 21 min read Field GuideUnder-slab vapor barrier and slab moisture field guideWhat the vapor barrier under a slab does, why ground moisture wrecks the flooring above, the ASTM class and thickness that hold, where the sheet goes, how it gets sealed and protected, and how the slab is tested before flooring.Vapor BarrierSlab MoistureASTM E1745 21 min read Field GuideConcrete waterstop and construction joint waterproofing field guideWhat a waterstop does, the joint types, PVC and bentonite and injection options, centering the barrier, welding the splices, the consolidation that makes or breaks it, and the QC before the pour.WaterstopsConstruction JointsPVC Waterstop 21 min read Field GuideWhich concrete diagnostic test answers the repair question?Match the repair decision to the test, sample the right locations and depths, and combine material, chemistry and field evidence into a usable scope.Concrete investigationPetrographyUltrasonic pulse velocity 24 min read Field GuideASTM C1583 pull-off tests: what failed, and what does it mean?Read the fracture plane, calculate measured-area stress, and connect each pull-off result to the repair sampling and acceptance plan.ASTM C1583Concrete repairPull-off testing 25 min read Field GuideASTM C876 half-cell potential results: corrosion probability tablesRead corrosion potentials with the reference electrode, continuity, moisture and corroborating evidence attached to every location.ASTM C876Half-cell potentialConcrete corrosion 23 min read Field GuideHow to monitor concrete crack movement using ACI guidanceSelect crack gauges, log temperature and loading, and turn a movement time series into a documented repair decision.Concrete crack monitoringACI guidanceCrack gauges 25 min read Field GuideRV concrete slab loads: wheel and outrigger input tablesA traceable RV wheel and support load register, contact-pressure calculations, ground and exposure inputs, and the design handoff checklist.RV padsConcrete slabsWheel loads 25 min read Field GuideHow to interpret concrete chloride profiles for service-life planningUse depth samples, compatible chloride thresholds and transparent transport inputs to turn a concrete condition survey into an intervention timeline.Concrete chloride profilesCorrosion initiationService-life modeling 27 min read

Mix design, placement, testing, and curing (38)

Field GuideHow to lay and grout a CMU block wall: a field execution guideCMU walls use an approved block layout, mortar joints, reinforcement and grout to form the specified assembly. Check the module, openings, placement procedure and temporary bracing before building.CMU ConstructionConcrete BlockMortar vs Grout 29 min read Field GuideCommercial pool construction field guide: the shotcrete shellA pool is an engineered concrete structure fighting the water table, not a hole. The steel, the sprayed shell, the hydrostatic relief, and the drains that keep it from floating or killing.Pool ConstructionShotcrete ShellHydrostatic Relief 21 min read Field GuideCommercial pool resurfacing and equipment rooms: scope to reopeningCommercial pool resurfacing renews the submerged finish. Coordinate equipment room repairs, filling, and commissioning within the same planned closure.Commercial PoolsPool ResurfacingEquipment Rooms 16 min read Field GuideCommercial window film: tint, safety, security, and solar field guideWhat window film is and why the glass-compatibility check keeps you from cracking the customer's glass, the film types by purpose, the clean-and-wet install, the thermal-stress risk, security-film anchoring, and the warranty.Window FilmSolar ControlSafety and Security Film 21 min read Field GuideConcrete admixtures field guide: types, uses, and cautionsWhat admixtures do, the ASTM C494 lettered types, water reducers and superplasticizers, the calcium chloride caution, and the field discipline that keeps an approved mix intact.AdmixturesASTM C494Water Reducers 21 min read Field GuideConcrete anchor and fastener installation field guideWhat actually holds an anchor in concrete: cast-in vs post-installed, the mechanical and adhesive types, the hole cleaning that makes or breaks epoxy, edge distance, and the cracked-concrete rating.Concrete AnchorsAdhesive AnchorsACI 318 Chapter 17 21 min read Field GuideConcrete coloring and staining field guide for decorative slabsThe five ways to color concrete, the prep that makes a stain take, acid stain neutralizing and safety, sealing the color, and the test area that prevents surprises.Concrete StainingAcid StainIntegral Color 21 min read Field GuideConcrete crack types, causes, and prevention field guideRead the crack to find the cause: plastic shrinkage and settlement, drying shrinkage, thermal, restraint, re-entrant corner, structural, ASR, and corrosion cracks, and what each one says.Concrete CracksDrying ShrinkagePlastic Shrinkage 21 min read Field GuideConcrete curing methods and protection field guideKeep moisture and temperature in the set concrete so it gains strength, pick the cure method that fits, and avoid the curing compound that wrecks the flooring bond.Concrete CuringACI 308Curing Compound 21 min read Field GuideConcrete cutting and coring methods and safety field guideCut and core hardened concrete the way it stays safe: scan first, pick the right saw, control the silica and the slurry, and get the engineer for anything structural.Concrete CuttingCore DrillingGPR Scanning 21 min read Field GuideConcrete driveway installation field guideWhat makes a driveway last: a uniform subgrade, the right thickness, joints that steer the cracking, the mix and air, the cure, and the record that backs it.Concrete DrivewayDriveway ThicknessControl Joints 21 min read Field GuideConcrete estimating and takeoff field guide for contractorsHow to take off the yardage, price the forms, the rebar, and the place-and-finish labor, add overhead and profit, and write the bid that becomes the contract.Concrete EstimatingConcrete TakeoffSFCA Formwork 21 min read Field GuideConcrete maturity method and temperature monitoring field guideEstimate in-place concrete strength in real time from temperature, build the mix-specific calibration per ASTM C1074, and make the strip and stress calls on strength.Maturity MethodASTM C1074In-Place Strength 21 min read Field GuideConcrete overlay and resurfacing field guide for decorative and repair workRead the slab, prep it to the right profile, get the bond, honor the existing joints, and pick the overlay type the job actually needs.Concrete OverlayResurfacingICRI CSP 21 min read Field GuideConcrete pumping and placement field guide: boom and line pumpsWhen the truck can't reach, you pump. Boom or line, the pumpable mix, priming, blockages, power-line and hose-whip safety, and the continuous pour that beats a cold joint.Concrete PumpingBoom PumpLine Pump 21 min read Direct AnswerConcrete slump test field guideRun the ASTM C143 slump test right, read true slump from shear, hold the C94 tolerance, and decide whether the truck stays.Slump TestASTM C143ASTM C94 20 min read Field GuideConcrete strength testing with cylinders field guideHow cylinders prove the concrete met f'c: making and curing per ASTM C31, the ASTM C39 break, the ACI 318 acceptance rule, and what to do with a low break.Strength TestingConcrete CylindersASTM C39 21 min read Field GuideConcrete surface defects diagnosis field guideRead the failure to find the cause: scaling, crazing, dusting, blistering, delamination, plastic cracks, popouts, and curling, and what each one says about the mix, the finish, or the cure.Concrete DefectsScalingDelamination 21 min read Field GuideCurtain wall, storefront, and glazing installation field guideWhat a curtain wall is and why a good one drains water instead of sealing it out, the systems, the glass, the thermal break, the air and water barrier tie-in, anchorage and movement, and the performance mock-up.Curtain WallStorefrontGlazing 21 min read Field GuideConcrete evaporation rate and plastic shrinkage cracking field guideFigure the surface evaporation rate, hold it under the ACI 305 threshold, and protect a fresh slab before it tears while it is still plastic.Evaporation RatePlastic ShrinkageACI 305 21 min read Field GuideFiber-reinforced concrete design and use field guideWhat fibers do and do not do, the micro versus macro split, steel and glass fibers, the dosage, the residual strength, and why fibers are not a swap for structural rebar.Fiber-Reinforced ConcreteMacro Synthetic FibersSteel Fibers 21 min read Field GuideConcrete formwork types and systems field guideWhat formwork has to do, the lateral pressure that governs the design, and how to pick the right system: job-built lumber, modular panels, gang, flying, slip, jump, column, and stay-in-place ICF forms.Formwork SystemsForm TiesGang Forms 21 min read Field GuideConcrete formwork, shoring, and reshoring field guideWhat formwork carries, why it is a life-safety system, the ACI 347 pressure that fresh concrete puts on the form, how shoring and reshoring move the young slab's load to ground, and when the forms come off.FormworkShoring and ReshoringACI 347 21 min read Field GuideConcrete foundation types and footing design field guideWhat a foundation does, how the soil and the load pick the type, and how spread, strip, mat, and deep foundations get built, inspected, and recorded.FoundationsSpread FootingsFrost Depth 21 min read Field GuideConcrete grout types and equipment baseplate grouting field guideWhat grout is and the jobs it does, non-shrink cementitious vs epoxy, the consistency that fills without segregating, and how to grout an equipment baseplate for full contact with no voids.Non-Shrink GroutEpoxy GroutASTM C1107 21 min read Field GuideJobsite security and theft prevention field guide for construction crewsWhy no single fence, camera, or lock stops a determined thief, and how the perimeter, the lock-up, the equipment GPS, the marking, the access control, and the crew stack into layers that make your site the harder target.Jobsite SecurityTheft PreventionEquipment Theft 21 min read Field GuideLaser screed and concrete screeding methods field guideHow concrete gets struck off to grade and flatness across the wet screed, the vibratory truss, and the laser screed, and why the screed sets the floor before anyone finishes it.Laser ScreedConcrete ScreedingFloor Flatness 21 min read Field GuideLightweight concrete field guide: structural and insulating mixesWhat lightweight concrete is, the three families, the density spectrum, the lightweight aggregate, why you pre-wet it, internal curing, and the field QC that keeps it honest.Lightweight ConcreteStructural LightweightLightweight Aggregate 21 min read Field GuideMass concrete thermal control and cracking field guideWhat makes a placement mass concrete, the two temperature limits that govern it, and how the crew holds them with the mix, precooling, insulation, and monitoring.Mass ConcreteACI 207Thermal Control Plan 21 min read Field GuideConcrete mix design and water-cement ratio field guideWhat a mix design is, who owns it, why the water-cement ratio runs everything, and how the field crew protects the proportions the supplier submitted.Mix DesignWater-Cement RatioACI 211 21 min read Field GuidePervious concrete installation field guide for concrete crewsHit the water window, build a draining reservoir under it, place fast without troweling, then cover and cure before it ravels.Pervious ConcreteACI 522Stormwater 21 min read Field GuideConcrete placement, consolidation, and vibration field guideGetting the concrete into the forms and around the bar without segregating it, then vibrating the trapped air out so it is dense and void-free. The placement decides the result.Concrete PlacementConsolidationVibration 21 min read Field GuidePrecast concrete erection and connections field guidePlant-cast concrete members are erected by crane and joined through engineered bearings, welded or bolted hardware and grout. Follow the approved sequence and separate crane release from permanent connection and brace-release decisions.Precast ConcretePrecast ConnectionsErection 35 min read Field GuideReady-mix concrete ordering and delivery field guideHow much to order, what to put on the ticket, the discharge clock, the no-added-water rule, and how to take a load without wrecking it.Ready-Mix ConcreteASTM C94Ordering Concrete 21 min read Field GuideRebar placement and cover pre-pour inspection guideInspect the reinforcing steel before the concrete buries it: cover, spacing, laps, hooks, and the chairs that hold it all where the drawings put it.Rebar InspectionConcrete CoverLap Splices 21 min read Field GuideSelf-consolidating concrete (SCC) field guide for crewsWhat SCC is, the three fresh properties it has to balance, how the mix gets flow without segregation, the slump-flow and J-ring tests, and the formwork pressure that catches crews out.Self-Consolidating ConcreteSlump FlowASTM C1611 21 min read Field GuideShotcrete and gunite application field guide for concrete crewsWet-mix versus dry-mix, the nozzleman who makes or breaks it, managing rebound, encasing the rebar without shadows, and the test panel that proves the work.ShotcreteGuniteNozzleman 21 min read Field GuideStamped and decorative concrete installation field guideColor methods, the release agent, the stamping window, hiding the joints, sealing without blushing, slip resistance, and what to record.Stamped ConcreteDecorative ConcreteColor Hardener 21 min read

Foundations, steel, masonry, and formwork (14)

Field GuideBelow-grade foundation waterproofing field guideWhat below-grade waterproofing does, dampproofing versus waterproofing, positive and negative side, the membrane types, the drainage that relieves the head, the joint details, and how the system gets tested before backfill.Below-Grade WaterproofingHydrostatic PressureFoundation Drainage 21 min read Field GuideRebar development length and lap splices field guideWhat development length and lap splices are, the factors that change the length, and why the field builds to the drawing's lap schedule instead of guessing.Development LengthLap SplicesRebar Bond 21 min read Field GuideDrilled pier and caisson deep foundations field guideWhat a drilled shaft is, how end bearing and skin friction carry the heaviest loads, the dry, cased, and slurry methods, and the clean hole, the cage, and the uncontaminated concrete that make it stand.Drilled PiersCaissonsDrilled Shafts 21 min read Field GuideDriven pile foundations field guide for deep-foundation crewsWhat a driven pile is, how end bearing and friction carry the load, the hammers and the driving criteria, why the blow count and load testing prove capacity, and what the engineer sets and the inspector logs.Driven PilesPile DrivingDeep Foundations 21 min read Field GuideExcavation shoring and earth retention field guideHold back the ground for a deep cut with an engineered wall, brace it with tiebacks or struts, control the water, and monitor the movement before it reaches the neighbor.Earth RetentionSoldier Pile and LaggingSheet Piling 21 min read Field GuideHelical pier and screw pile foundations field guideWhat a helical pier is, why the torque proves the capacity, when screw piles win, and the engineer, the manufacturer report, and the records that make them stand.Helical PiersScrew PilesUnderpinning 21 min read Field GuideMasonry construction field guide: brick, block (CMU), and stoneWhat masonry is, why a wall keeps water out by draining it instead of blocking it, and how mortar, reinforcement, ties, flashing, and movement joints make the wall last.MasonryBrick VeneerCMU 21 min read Field GuideRebar mechanical splices and couplers field guideWhat a rebar coupler is, when it beats a lap, the threaded and swaged and grout-filled types, Type 1 versus Type 2, and the inspection that has to back it.Rebar CouplersMechanical SplicesType 2 Coupler 21 min read Field GuideRebar detailing and the bar bending schedule field guideHow the engineer's drawings become shop drawings and a bar bending schedule: the marks, the shape codes, the bends, the cut lengths, and the submittal that has to come back approved before anyone bends steel.Bar Bending ScheduleRebar DetailingShape Codes 21 min read Field GuideStructural steel erection and connections field guideWhat steel erection is, why the partly-built frame is the dangerous part, and how the columns get set, the beams get connected, the frame gets plumbed, and the bolts and welds get inspected before the load comes on.Steel ErectionOSHA Subpart RStructural Bolting 21 min read Field GuideStructural fireproofing field guide: SFRM and intumescentWhat fireproofing does, why the listed thickness on a tested assembly is the whole rating, the difference between SFRM and intumescent, and how the thickness, density, and bond get proved by inspection.FireproofingSFRMIntumescent 21 min read Field GuideCalcium silicate board: selection, fire ratings, installation, and estimatingCalcium silicate board is a mineral panel used in specified fire-protection and heat-insulation systems. Select the exact grade and assembly before choosing thickness, fasteners, or a price.Calcium Silicate BoardPassive Fire ProtectionBoard Installation 21 min read Field GuideTilt-up panel casting, lifting, and bracing field guideCast the panel flat, lift it upright, and brace it before the hook comes off: the bond breaker, the lift strength, the engineered inserts, the wind bracing, and when the braces come off.Tilt-UpPanel BracingTilt-Up Erection 21 min read Field GuideHow to scope corroded post-tension tendons in a parking structureIdentify the PT system, connect investigation findings to structural decisions, and measure tendon repairs with defined acceptance evidence.Post-tensioningParking structuresTendon corrosion 25 min read

Site work, building systems, and project delivery (38)

Field GuideAir Entrainment and Freeze-Thaw DurabilityWhy air-entrained concrete survives freeze-thaw and deicers: what the tiny air bubbles do, target air content, how to measure it, and the field practices that quietly destroy it.Air EntrainmentFreeze-ThawDurability 21 min read Field GuideAsbestos abatement and removal procedures field guideThe danger is invisible and the law is strict. Test suspect material before you ever cut, sand, or demo it, then abate it contained, wet, and licensed, with a third party signing the air clearance.Asbestos AbatementOSHA 1926.1101NESHAP Asbestos 21 min read Field GuideBridge deck construction and rehabilitation field guideWhy the deck is the bridge element that wears out first, and the work that fights it: cover, corrosion-resistant rebar, dense concrete, a real cure, joints that move, and rehab by overlay and hydrodemolition under traffic.Bridge DeckChloride CorrosionDeck Overlay 21 min read Field GuideBuilding demolition methods and planning field guideDemolition looks like destruction and reads like a plan. The hazmat survey, the engineering survey, the disconnects, and the sequence are what keep it from killing someone or releasing asbestos.DemolitionOSHA Subpart TNESHAP Asbestos 21 min read Field GuideCeramic and porcelain tile installation field guidePrep a sound, flat, stiff substrate, get full mortar coverage with the right trowel and back-butter, waterproof the wet areas and flood-test them, and detail the movement joints so the field cannot tent.Tile InstallationLarge-Format TileThinset Coverage 21 min read Field GuideCold weather concreting and protection field guidePlace above the right temperature, keep fresh concrete from freezing before it reaches 500 psi, and protect it long enough to gain strength.Cold Weather ConcretingACI 306Freeze Protection 21 min read Field GuideCompressed gas cylinder safety and handling field guideWhy a cylinder is a stored bomb you secure and separate: chain it upright, cap the valve, keep oxygen away from fuel and oil, and handle by the gas inside.Compressed Gas CylindersOxygen and AcetyleneOSHA 1910.253 21 min read Field GuideConstruction dewatering and groundwater control field guideLower the water table below the excavation, pick the method by the soil, prevent boils and heave, and permit the discharge before the first pump runs.DewateringGroundwater ControlWellpoints 21 min read Field GuideConstruction labor productivity tracking field guideMeasure the work the crew puts in place per labor hour against the budget, by cost code, so the slip shows up while you can still fix it.Labor ProductivityProduction RateEarned Value 21 min read Field GuideConstruction layout field guide: total station, GPS, and the controlWhat construction layout is, why it is only as good as the control it comes from, and how the points get transferred from the model to the ground with a robotic total station or GPS, verified before the pour, and shot back as an as-built.Construction LayoutRobotic Total StationGPS GNSS RTK 21 min read Field GuideConstruction quality control QA/QC program field guideBuild the work right the first time and prove it: QA that prevents defects, QC that catches them, the quality plan, the ITP and its hold points, and how nonconformances get documented and closed.QA vs QCInspection Test PlanHold Points 21 min read Field GuideConstruction robotics and jobsite automation field guideWhat construction robotics is, why robots augment the crew instead of replacing the trade, the real categories from layout printers to autonomous dozers, and why every one of them is only as good as the model and the control it builds from.Construction RoboticsJobsite AutomationLayout Robots 21 min read Field GuideConstruction scheduling field guide: CPM, look-ahead, and the critical pathPlan the sequence and timing so the crew, the materials, and the trades line up, find the slip before it costs you, and keep the baseline and updates that protect the time.Construction SchedulingCritical Path MethodLook-Ahead 21 min read Field GuideDrywall and gypsum board hanging and finishing field guideThe board types and where each one goes, hanging to minimize joints, the screw pattern and depth, taping and the coats, the gypsum levels of finish 0 to 5, and the fire-rated assembly you cannot deviate from.DrywallGypsum BoardType X Fire Rated 21 min read Field GuideEquipment cost recovery: own vs rent vs lease field guideBuild the true ownership and operating hourly rate, recover it in the bid, keep the machine utilized, and decide own vs rent vs lease on the hours, not the ego.Equipment CostOwn vs RentOwnership and Operating Cost 21 min read Field GuideConcrete flatwork finishing sequence field guideScreed, bull float, wait out the bleed water, then float, trowel, and cure, on the timing that decides whether the surface holds up or dusts off.Flatwork FinishingBleed WaterACI 302 21 min read Field GuideGround improvement and grouting field guideStrengthen weak soil in place by densifying, mixing, grouting, or adding stiff columns, match the method to the soil and the problem, and verify the result.Ground ImprovementCompaction GroutingJet Grouting 21 min read Field GuideHearing conservation and jobsite noise field guide for concrete crewsNoise destroys hearing a little at a time with no pain and no recovery. Engineer the noise down, protect the ear right, and run the program OSHA wants above the action level.Hearing ConservationOSHA 1910.95Jobsite Noise 21 min read Field GuideHot weather concreting and protection field guideBeat the evaporation rate, keep the concrete cool and wet from the truck through curing, and stop the surface from cracking before it can set.Hot Weather ConcretingACI 305Plastic Shrinkage 21 min read Field GuideInterior and selective demolition strip-out field guideInterior demolition is removal with protection. Survey for hazmat first, make the utilities safe, leave the structure to the engineer, and contain the dust so the building you are gutting keeps working around you.Interior DemolitionSelective DemolitionStrip-Out 21 min read Field GuideJobsite camera and video monitoring field guide for construction crewsA jobsite camera watches the site around the clock for security, progress, safety, and the record, but it detects and documents. The response is what prevents.Jobsite CameraVideo MonitoringAI Analytics 21 min read Field GuideLead paint and the EPA RRP Rule: lead-safe renovationA pre-1978 building changes how you work. Disturb the paint and you make lead dust, so the whole job becomes about controlling that dust: certification, containment, no prohibited practices, HEPA cleanup, and a verified record.Lead PaintEPA RRP RuleLead-Safe Work Practices 21 min read Field GuideLean construction field guide: the Last Planner System and pull planningMake the work ready before the crew shows up, pull-plan the handoffs with the trades, commit only to work with the constraints cleared, then measure what got done and fix the reason it did not.Lean ConstructionLast Planner SystemPull Planning 21 min read Field GuidePre-engineered metal building erection field guideWhat a pre-engineered metal building is, why the anchor bolts decide whether it goes up, and how the frames get set, braced, plumbed, and sheeted in the manufacturer's sequence.Metal BuildingsPEMB ErectionAnchor Bolts 21 min read Field GuideMetal railing and guardrail fabrication and installation field guideWhat a guardrail and a handrail have to do, the code heights and loads and the 4-inch sphere infill, and why the post anchorage, not the rail, is the part that carries the life-safety load.GuardrailsHandrailsIBC 1015 21 min read Field GuideArchitectural millwork and casework installation field guideWhat casework and millwork are, the AWI grades that set the quality, acclimation and wood movement, blocking and anchoring, field measure, and scribing square work to a crooked building.Architectural MillworkCaseworkAWI Grades 21 min read Field GuideConstruction progress meetings and field communication field guideRun the layered meetings tight so decisions get made and tracked: the OAC, the weekly coordination, and the daily huddle, each with an agenda, minutes, and action items that close.Construction MeetingsOAC MeetingField Communication 21 min read Field GuideSilica dust control at the tool: OSHA Table 1 field methods for concreteKill the dust where the blade meets the concrete. Water at the cut or a HEPA dust collector on the tool, the exact control OSHA Table 1 names for each task, the respirator as the last layer, and never a dry broom.Silica Dust ControlOSHA Table 1HEPA Dust Collection 21 min read Field GuideOSHA silica exposure control program field guideCutting, grinding, drilling, or breaking concrete and masonry releases respirable crystalline silica, the invisible dust that scars lungs for good. Control it at the source with water or vacuum, follow Table 1 exactly or run an exposure assessment, write the plan, and never dry-sweep.Respirable Crystalline SilicaOSHA 1926.1153Silica Table 1 21 min read Field GuideStruck-by and caught-in hazards field guide for crewsTwo of OSHA's Focus Four kill the most workers after falls. Keep people out of the line of fire and out of the pinch: spotters, guards, lockout, and distance from the energy.Struck-ByCaught-In BetweenOSHA Focus Four 21 min read Field GuideStucco and EIFS exterior wall systems field guideWhy water management is the whole game, how traditional stucco and EIFS differ, the lesson of the 1990s EIFS rot crisis, the WRB and drainage plane, the weep screed, flashing every opening, control joints, and keeping EIFS to one manufacturer's system.StuccoEIFSWeep Screed 21 min read Field GuideAcoustical suspended ceiling field guide: grid, layout, tile, and seismic bracingHang the grid plumb, lay it out for balanced borders, set it dead level, brace it to the seismic requirement, support the fixtures, and pick the tile for NRC or CAC.Suspended CeilingAcoustical Ceiling TileSeismic Bracing 21 min read Field GuideCommercial tenant improvement and fit-out field guideA tenant improvement turns a base-building shell into a finished tenant space on a schedule the lease fixes. The rent clock and the move-in date do not move, so the permit, the long-lead items, and the existing conditions are the real risks.Tenant ImprovementFit-OutTI Allowance 21 min read Field GuideSintered stone surfaces: selection, support, fabrication, and costSintered stone surfaces are manufactured mineral slabs consolidated with pressure and heat for countertops, walls, and other approved applications. Their durability depends on choosing the right product and supporting its edges, openings, and spans.Sintered StoneCountertopsPorcelain Slabs 21 min read Field GuideHow often should a commercial building be repainted? A substrate and exposure tableBudget each painted elevation by substrate, exposure and visible condition, then fund the resulting ten-year repaint schedule.Commercial PaintingRepaint IntervalsExterior Maintenance 27 min read Field GuideHow to estimate commercial exterior painting quantities with PCA P10A checked facade worksheet connecting PCA P10 bid quantities, physical coating area, product gallons, preparation and lift access.PaintingPCA P10Quantity Takeoff 25 min read Field GuideWhy is exterior paint peeling? A field guide to finding the failed layerTrace the failed layer, test the cause and measure the removal boundary before a commercial exterior repaint.PaintingExterior paintFailure diagnosis 25 min read Field GuideSSPC-PA 2 dry film thickness inspection field guideA field procedure for rough-steel gage setup, spot and area arithmetic, thickness failure mapping, and auditable repair retests.SSPC-PA 2Dry film thicknessProtective coatings 25 min read
Browse every concrete question, answered

Concrete calculators

CMU block calculatorFind blocks and mortar for a wall: about 1.125 standard 8x8x16 blocks per square foot, plus a bag of mortar per 28 to 32 blocks.Concrete bags calculatorFind how many bags of concrete a job needs: bags = volume (cubic feet) divided by the yield per bag, plus waste.Formwork pressure calculatorEstimate the lateral pressure of fresh concrete on column forms: P = Cw x Cc x (150 + 9000R/T).Concrete yardage calculatorFigure the cubic yards for a slab or footing from length, width, and thickness, with a waste allowance so you do not come up short.Dumpster calculatorFind how many roll-off containers a job needs: loose debris volume divided by the container size, in cubic yards.Drywall sheet calculatorFind how many drywall sheets a job needs: area to cover divided by the sheet size, plus waste.Truck load calculatorFind how many truck loads to haul off an excavation: loose volume = bank volume x (1 + swell), divided by truck capacity.Bearing pressure calculatorCheck soil bearing pressure under a footing: pressure = load divided by footing area.Rebar weight calculatorEstimate the weight of reinforcing steel in pounds and tons from the bar size, the length per bar, and the number of bars, using the standard ASTM A615 unit weights.Sonotube concrete calculatorFind the concrete for round piers or columns: volume = pi x radius squared x height.Stair calculatorLay out a stair from the total rise: number of equal risers, the exact riser height, the tread count, and the total run.Stud count calculatorFind how many studs a wall needs: length divided by the on-center spacing, plus the corners and openings.

Concrete readiness checks

Bridge deck readinessA 2 minute check on whether your bridge deck is built or rehabbed to stop chloride corrosion, before the deck spalls again and the structure suffers.Coating durability checkA 2 minute check on whether your coating or lining job is set up to hold for years, before it peels at the one spot you skipped and the whole thing fails early.Pool construction readinessA 2 minute check on whether your commercial pool is engineered for uplift, shot void-free, plumbed-and-tested, and drain-compliant, before it floats, leaks, or fails inspection.Concrete pour readinessA 2 minute check before the first truck rolls, so weather, subgrade, and a missed test do not cost you the slab.Layout readinessA 2 minute check on whether your construction layout comes from a protected control network, the right tool and tolerance, and a verify before the pour.Construction robotics readinessA 2 minute check on whether a jobsite robot fits the task, the model, and the safety plan, before you buy hype instead of help.Demolition readinessA 2 minute check on whether your demo job is surveyed, made safe, and contained before you swing a hammer, not after you hit asbestos or a live wire.Excavation readinessA 2 minute check on whether the dig and the foundation are set up to avoid a collapse, a flood, or a settling building, before the excavator turns the first bucket.Jobsite camera readinessA 2 minute check on whether your camera system has the response, power, and privacy compliance to deter theft and document the site, not just record it.Jobsite security readinessA 2 minute check on whether your site layers its security, locks up the high-value gear, and can recover what walks off.Lean construction readinessA 2 minute check on whether your work is planned to flow, with constraints removed before the crew shows up, or just pushed and hoped.Metal building readinessA 2 minute check on whether your pre-engineered metal building has the anchor bolts, bracing, and sequence right, before a frame will not land or a wall collapses.Silica control readinessA 2 minute check on whether your crew controls respirable silica at the source and meets the OSHA standard, before the dust scars lungs or draws a citation.Fireproofing readinessA 2 minute check on whether your spray fireproofing is applied to the listed thickness, bonded to the steel, inspected, and patched, before the rating is silently void.Stucco/EIFS readinessA 2 minute check on whether your stucco or EIFS drains the water out, before trapped water rots the wall like the EIFS failures of the 90s.Tenant improvement readinessA 2 minute check on whether your TI is set up to hit the move-in date, with the permit, long-lead items, and allowance under control.Tile install readinessA 2 minute check on whether your tile job has the substrate, coverage, waterproofing, and movement joints to hold, before it cracks, tents, or leaks.

Compare Concrete options

Concrete field tools

FreshTest DCSlump, air, temperature, unit weight, yield, and truck verdicts.PourClockConcrete evaporation timing and active pour gates.ScanMark DCScanner readings, bit-depth stops, and deck drill maps.AnchorProofRuns post-installed anchor special inspections against your ESR and exports a signed proof-load record.Anchor Template CheckPre-pour anchor-bolt template checks with evidence capture and export packets.BracePass DCTilt-up brace calculator for brace count, insert height, deadman pull, and crane-release checklist.CoatYield DCPlans resinous floor coating coverage, kits, pot-life, recoat windows, and yield for slab crews.FrostPourPlans cold-weather concrete placement temp, protection period, and a signed temperature log per ACI 306R.GroutPour Baseplate DCCalculates non-shrink baseplate grout bag count and gives a cure GO/NO-GO by substrate temperature.JointPlanSolves a near-square control-joint grid for slab-on-grade with saw-cut depth and timing.Laydown Yard MapGrids a jobsite laydown yard, pins bulk material by cell, and exports handover maps and item lists.OverhangProof: Counter SpanChecks countertop overhangs against material limits and the 1/3 rule and plans bracket spacing.PlankPilotPlans LVP, laminate, and wood flooring installs, floating or glue-down.PourPilotCalculates concrete yards, bags, and ready-mix cost in a fast offline app.SetupCheck DCGrades a total station setup check shot PASS or RE-SHOOT for layout techs before they stake.ShoreSafeOSHA trench slope calculator and soil classifier that gives a signed GO or STOP trench card.SnapTime Silicone QCLogs snap-time, butterfly, snake, and mix-ratio checks per batch for two-part structural silicone pumps.SprayMixCalculates HVLP thinning ratio, tip size, and ounces to mix for lacquer and conversion varnish.StrengthGate DCValidates an ASTM C1074 maturity curve and logs logger temps to gate concrete strip, load, and lift releases.StringerWiseOffline stair stringer calculator for rise, run, cut marks, and IRC/IBC code checks for carpenters.StuccoProofOffline stucco inspection checklist that records WRB, lath, weep, coats, and exports a signed field report.WallWrightOffline concrete, masonry, and hardscaping field tool with a one-time purchase.WeldVTJudges visual weld calls against AWS D1.1, issues NCRs, and exports a weld-by-weld VT report.