Readiness check

Is your demolition job ready to start safely?

Demolition goes wrong in the things you did not check before you started: the asbestos nobody surveyed, the wall that turned out to be bearing, the live wire in the chase. Answer for how the job is actually set up, not the ideal. The score stays on your device; enter an email only if you want the demolition readiness checklist sent over.

1. Has a hazardous-materials survey been done before any demolition (asbestos, lead, PCBs)?
2. Do you know what is load-bearing and have an engineer for any structural removal?
3. Are the utilities capped, disconnected, and locked out before cutting (electrical, gas, water)?
4. Do you protect what stays (structure, systems to remain, adjacent occupied space)?
5. Do you contain the dust (barriers, negative air) in an occupied or sensitive building?
6. Is egress kept clear and life-safety (fire alarm, sprinkler) maintained or planned around?
7. Do you have the demolition permit and any asbestos (NESHAP) notification filed?
8. Do you control silica dust when cutting or breaking concrete and masonry?