ANVILFIELD Try FieldOS

Paving field guides

Paving guides, checklists, and calculators

Compaction windows, striping layout, lot assessments, force-account logs, and material slips.

58 field guides5 calculators8 readiness checks11 field toolsJump to paving tools

Get the printable paving field-card pack (PDF)

Where trades find buildings, assets and public work: choose a property list, custom asset search or public bid for the next account.

Latest Paving guides

Finding customers and planning bids (3)

Asphalt placement, compaction, and materials (23)

Field GuideAsphalt compaction and rolling: density, mat temperature, and the patternHow rolling the hot mat to target density in the temperature window decides how long the pavement lasts: air voids, the three rolling phases, roller types, the pattern from a test strip, joint and edge density, and the testing that accepts it.Asphalt CompactionPavement DensityRolling Pattern 21 min read Direct AnswerAsphalt compaction window: temperature, rolling, and densityHow the time and temperature range for rolling hot-mix asphalt works, what closes it, and how to hit density before the mat goes cold.Asphalt CompactionCompaction WindowHMA Density 20 min read Field GuideAsphalt density and compaction testing: measure and accept the matHow in-place asphalt density is measured and accepted: percent of Gmm, nuclear and non-nuclear gauges, cores, joint density, and the pay factor that rides on it.Asphalt DensityPercent GmmNuclear Density Gauge 21 min read Field GuideAsphalt pavement distress: diagnose the crack, find the cause, pick the fixHow to read the crack pattern, its location, and its shape to tell a structural failure from an aging surface, and match each distress to the treatment that actually fixes it.Asphalt DistressCrack DiagnosisAlligator Cracking 21 min read Field GuideAsphalt driveway installation: base, drainage, mat, and edgesHow to install an asphalt driveway that lasts: the grade and drainage, the subgrade and base, the mat thickness and compaction, the edges, the cure, and the maintenance cycle.Asphalt DrivewayDriveway InstallationAggregate Base 21 min read Field GuideAsphalt mill and overlay: cold milling, tack coat, and resurfacingHow mill and overlay resurfaces asphalt: the milling cut, the tack bond, the leveling course, the overlay lift, the joints, raising structures, and keeping cracks from coming back.Mill and OverlayAsphalt ResurfacingCold Milling 21 min read Field GuideAsphalt milling and cold planing field guide: depth, grade control, and profilingWhat a milling crew controls before the overlay: cut depth, automatic grade and cross-slope, the drum and teeth, a clean textured surface for bond, RAP, utilities, and the drop-off.Cold MillingCold PlaningGrade Control 21 min read Field GuideAsphalt mix design field guide: Superpave, PG binder, volumetricsHow Superpave sets the aggregate and binder a pavement needs, the PG grade and volumetrics that drive it, the job mix formula, and how the field protects the design.SuperpaveAsphalt Mix DesignPG Binder 21 min read Field GuideAsphalt mix types field guide: surface, binder, and base courseWhy a pavement uses a different mix in every lift, what the surface, binder, and base courses each do, the dense, gap, and open families, and how to match the mix to the traffic.Asphalt Mix TypesSurface CourseStone Matrix Asphalt 21 min read Field GuideAsphalt pavement design: thickness by traffic and subgradeHow to size the asphalt section, the surface, base, and subbase thicknesses, to the truck traffic and the subgrade strength so the pavement lasts its design life without under-building or over-paying.Pavement DesignESALStructural Number 21 min read Field GuideAsphalt paving estimating and takeoff field guideHow to take off the quantities, convert area to tonnage, price the units, and add overhead and profit so the bid wins the job without losing money on it.Paving EstimatingQuantity TakeoffAsphalt Tonnage 21 min read Field GuideAsphalt paving inspection and quality control field guideWhat the paving inspector checks from the base to the finished mat: tack, tickets, temperature, segregation, thickness and yield, joints, smoothness, and the record that backs acceptance.Asphalt InspectionPaving QCJob Mix Formula 21 min read Field GuideAsphalt paving joints and handwork: longitudinal, transverse, and seam densityHow asphalt longitudinal and transverse joints are built and why they fail first, the hot echelon and notched-wedge joint, the cold joint, joint density, raking, segregation, and the handwork around structures.Asphalt JointsLongitudinal JointTransverse Joint 21 min read Field GuideAsphalt plant field guide: batch and drum hot mix productionHow a hot mix plant turns stockpiled stone and liquid binder into the mix on your truck, how batch and drum plants differ, and what the temperature, gradation, and timing decide before the paver ever sees it.Asphalt PlantHot Mix AsphaltBatch Plant 21 min read Field GuideAsphalt recycling, RAP, and full-depth reclamation field guideHow asphalt gets recycled: RAP in new hot mix, the aged binder and the rejuvenator, full-depth reclamation, the stabilizer choice, cold in-place and central plant recycling, curing, and proving the reclaimed base.Asphalt RecyclingRAPFull-Depth Reclamation 21 min read Field GuideAsphalt segregation: causes, prevention, and detectionWhy scattered coarse patches and cold spots become the first potholes: physical and thermal segregation, where they start in the plant, truck, silo, and paver, and how handling, the MTV, the IR bar, and density catch them.Asphalt SegregationThermal SegregationMaterial Transfer Vehicle 21 min read ComparisonAsphalt vs concrete pavement: the honest comparisonThe real tradeoff between flexible asphalt and rigid concrete: first cost versus life-cycle cost, where each one wins, the climate, the recycling, and how to pick by the load and the use instead of a brand preference.Asphalt vs ConcretePavement SelectionLife-Cycle Cost 21 min read Field GuideCold-weather asphalt paving and the temperature limitsHow cold air, ground, and wind shut the compaction window, what minimum temperatures the spec lets you pave at, and the playbook for late-season work that still makes density.Cold-Weather PavingPaving TemperatureCompaction Window 21 min read Field GuideIntelligent compaction (IC) for asphalt: pass maps, ICMV, temperatureHow an IC roller maps every pass, mat temperature, and relative stiffness in real time so you cover 100 percent of the mat to a uniform pattern, find the weak and missed areas while you can still fix them, and keep the data as the as-built record. ICMV is relative stiffness, not density, and cores still accept the work.Intelligent CompactionICMVPass Mapping 21 min read Field GuidePavement base and subgrade compaction: build the structure under the matHow to prep and compact the subgrade and aggregate base under pavement, proof roll for soft spots, hit the Proctor density, keep the base draining, and prove it before you pave.Subgrade CompactionAggregate BaseProctor Density 21 min read Field GuidePothole patching and asphalt repair field guideWhy potholes form, which patch method fits, the square-clean-dry procedure that makes a patch hold, and the record that backs the repair you billed.Pothole RepairAsphalt PatchingThrow-and-Roll 21 min read Field GuideTack coat and prime coat field guide: bonding asphalt layersWhy the thin sprayed coats between asphalt layers decide whether a pavement lasts: what tack and prime do, application rate and coverage, breaking and curing, and the bond failures they prevent.Tack CoatPrime CoatAsphalt Bonding 21 min read Field GuideWarm mix asphalt (WMA) field guide for paving crewsWhat warm mix asphalt is, the three ways it is made, how it changes the haul, the season, and the compaction window, and the moisture and anti-strip tradeoff that comes with the lower heat.Warm Mix AsphaltWMAFoamed Asphalt 21 min read

Pavement condition, repair, and drainage (15)

Field GuideCulvert inspection: defects, measurements and maintenance decisionsCulvert inspection checks the inlet, barrel, outlet, channel and road above for blockage, deterioration, scour and lost support, then records the action each finding needs.Culvert InspectionRoad DrainageStormwater 18 min read Field GuideConcrete pavement jointing and curing: the rigid slab done rightHow to place, joint, and cure rigid concrete pavement: rigid versus flexible, joint types and spacing, sawcut timing and depth, dowels versus tie bars, texture, the curing compound, sealing, and opening to traffic.Concrete PavementJointingCuring 21 min read Field GuideConcrete pavement types: JPCP, JRCP, and CRCP explained for the fieldThe three rigid pavement families and the specialty slabs: how JPCP, JRCP, and CRCP each handle cracking, dowels versus tie bars, slab thickness and support, whitetopping, pervious concrete, RCC, faulting and repair, and how to pick the type.Concrete Pavement TypesJPCPCRCP 21 min read Field GuideFog seal and asphalt rejuvenator pavement preservation field guideWhat a fog seal and a rejuvenator each do, the road that is a candidate, the application rate and friction that decide whether it works, and the record that backs the treatment.Fog SealAsphalt RejuvenatorPavement Preservation 21 min read Field GuidePavement condition assessment and PCI: rate asphalt, build the planHow to rate asphalt with the PCI, tell a base failure from age, read the deterioration curve, and turn the survey into a prioritized repair plan and budget.PCIASTM D6433Pavement Assessment 24 min read Field GuideIndustrial yard paving and drainage: loads, grades and repair scopeMatch pavement to truck, forklift and trailer loads, then grade it to verified inlets and an approved outlet. Fix trapped water before resurfacing.Industrial YardsHeavy Duty PavementSite Drainage 17 min read Field GuidePavement marking and striping layout field guideHow to lay durable, reflective, code-compliant stripes: the material, the surface prep and cure window, the weather limits, the layout, and the MUTCD colors.Pavement MarkingParking Lot StripingThermoplastic 21 min read Field GuidePavement marking materials and application field guideWhich marking material to use and how to put it down: paint, thermoplastic, epoxy, MMA, and tape, the glass beads, the surface prep, and the MUTCD standards.Pavement MarkingThermoplasticTraffic Paint 21 min read Field GuidePavement preservation treatments: the field guide to keeping good roads goodThe treatment toolbox from crack seal to thin overlay, the curve that sets the timing, and how to match the right treatment to a road that is still worth saving.Pavement PreservationPreventive MaintenanceCrack Seal 21 min read Field GuidePavement subdrains and edge drains: getting water out of the baseHow to drain water out of the pavement base and subgrade with edge drains, underdrains, geotextile filters, and permeable bases, and why the neglected outlets decide whether any of it works.Edge DrainsPavement UnderdrainSubsurface Drainage 21 min read Field GuidePermeable pavement installation: build the reservoir, place the surface, prove it drainsHow a crew builds permeable pavement: the build order and hold points, the subgrade you protect instead of compact, placing the open-graded reservoir and the surface without closing the voids, and proving drainage at handoff.Permeable PavementPorous AsphaltPervious Concrete 21 min read Field GuidePorous and permeable pavement field guide for site crewsHow porous asphalt, pervious concrete, and permeable pavers move water through the surface into a stone reservoir, why the subgrade stays uncompacted, and how to keep the pores open.Permeable PavementPorous AsphaltPervious Concrete 21 min read Field GuideSealcoat and crack seal: asphalt pavement preservation field guideHow crack sealing and sealcoating keep water and UV out of good pavement, the sequence that makes them work, and the record that backs the scope you bid.SealcoatingCrack SealingPavement Preservation 21 min read Field GuideParking lot sealcoating cost per square foot: 3 worked scope budgetsThree measured-scope budgets connect sealer concentrate, repair quantities, crew production and occupied-site phases to a complete commercial sealcoating price.SealcoatingParking lotsCost estimating 25 min read Field GuideSealcoat, overlay or replace? A 10-year parking lot maintenance budgetCompare eligible pavement treatments, annual cash calls, closures and the reserve needed before each bill falls due.Parking lot maintenanceLife-cycle costSealcoat 25 min read

Striping, accessibility, and traffic control (5)

Field GuideParking lot ADA accessibility layout field guideHow to lay out accessible parking: the required count, the van spaces, the stall and access-aisle width, the slope that fails most lots, the route to the door, and the signs.ADA ParkingAccessible ParkingVan Accessible 21 min read Field GuideADA curb ramp and detectable warning field guideHow to build a pedestrian curb ramp that passes: the running and cross slope the inspector measures, the landing, the flares, the truncated-dome detectable warning, the flush gutter, and the as-built that backs it.ADA Curb RampDetectable WarningTruncated Domes 21 min read Field GuideParking lot striping layout and stall geometry field guideHow to lay out a parking lot: the stall size, the parking angle, the drive aisle, the ADA spaces, and the fire lane, fit to the lot and the code.Parking Lot StripingStall GeometryADA Parking 21 min read Field GuideParking lot paint vs thermoplastic: lifespan and annual cost tablesSource-qualified service lives, turning-zone inspection records and equal-layout annual costs for paint and thermoplastic parking lot markings.Parking lot stripingThermoplasticTraffic paint 26 min read Quantity worksheetHow much striping paint do you need? A parking-lot quantity worksheetGemSeal ProStripe and ProStripe Plus list 325 feet of 4-inch stripe per gallon at 15 wet mils; order each color from the complete marking takeoff.Striping paintParking lotsQuantity takeoff 24 min read

Estimating, equipment, and project records (12)

Field GuideAggregate base and gravel roads: build and maintain the unpaved sectionHow to build and keep up an aggregate road: the layers, the dense-graded crushed stone, the fines that bind, the crown that sheds water, and the grading, dust control, and regravelling that keep it from going to pieces.Aggregate BaseGravel RoadsCrusher Run 21 min read Field GuideChip seal and surface treatments: a pavement preservation field guideHow a chip seal seals sound pavement, the spray-and-chip sequence that makes it stick, where slurry and micro-surfacing fit instead, and the record that backs the rates you ran.Chip SealSurface TreatmentPavement Preservation 21 min read Field GuideConcrete curb, gutter, and sidewalk: the site flatwork field guideHow to build site concrete flatwork: curb and gutter shapes and the flow line, slip-form versus hand-formed, the subgrade and base, the exterior mix, the broom finish, sidewalk joints, ADA curb ramps, approaches, curing, and the records that back the work.Curb and GutterSidewalkFlatwork 21 min read Field GuideVehicle DOT and FMCSA compliance field guide for paving contractorsFind out whether your trucks make you a motor carrier, then run the USDOT number, driver files, hours of service, inspections, and testing the FMCSA and your state expect.DOT ComplianceFMCSAUSDOT Number 21 min read Field GuideEquipment fleet maintenance program field guide for paving contractorsHow to keep the trucks, pavers, rollers, and loaders running on a schedule so a breakdown does not idle the crew, blow the paving window, or eat the margin you bid.Fleet MaintenancePreventive MaintenanceHeavy Equipment 21 min read Field GuideGeotextile separation and stabilization fabric for pavement and site baseHow a layer of fabric between the subgrade and the stone keeps a base from pumping into soft soil: the four functions, woven vs nonwoven, geotextile vs geogrid, AASHTO M288 classes, overlap, and placing stone without tearing it.GeotextileSeparation FabricAASHTO M288 21 min read Field GuideGrade control: stringline, laser, and machine control for grading and pavingHow grade control sets the design elevations, slopes, and ride, from stringline and blue tops to laser, 2D, and 3D GPS and total-station machine control, and how to check it behind the machine.Grade ControlMachine ControlStringline 21 min read Field GuideAsphalt longitudinal joint density and construction: the seam that fails firstWhy the longitudinal joint is the lowest-density line in the mat and fails years before the rest, and how method, tack, and rolling build a dense, bonded seam: the cold unconfined edge, the density differential, echelon and notched-wedge joints, rolling from the hot side, and the joint density spec.Longitudinal JointJoint DensityNotched Wedge 21 min read Field GuideProximity warning and struck-by safety technology field guide for paving crewsWorker tags, cameras, and radar reduce the struck-by risk around heavy equipment, but they are the last layer. Separate people from equipment first, run the traffic plan and the spotter, and let the tech catch what slips through.Struck-ByProximity WarningHeavy Equipment 21 min read Field GuideSlurry seal and micro-surfacing: the pavement preservation field guideWhat separates slurry seal from micro-surfacing, the cold mix that makes each one work, the cure that decides which weather you can run, and the candidate pavement that has to be sound underneath.Slurry SealMicro-SurfacingPavement Preservation 21 min read Field GuideSubgrade stabilization with lime, cement, and geogridHow to treat a soft, wet, or clay subgrade so it carries the pavement: find it with a proof roll, match lime to clay and cement to granular soil by a lab mix design, bridge with geogrid or undercut when treatment will not work, and prove it before the base.Subgrade StabilizationLime StabilizationCement Stabilization 21 min read Field GuideUtility locating and call before you dig: the 811 ticket, the marks, and digging safeHow to call 811 before you dig, read the APWA marks, wait for positive response, hand-dig the tolerance zone, pothole to verify, and find the private lines 811 will not mark.Call 811Utility LocatingOne-Call 21 min read
Browse every paving question, answered

Paving calculators

Paving readiness checks

Compare Paving options

Paving field tools

Next step: See parking lot lists