ANVILFIELD Try FieldOS

Readiness check

Are you keeping people clear of the equipment, or hoping?

Struck-by is a construction Focus Four, and the danger is people and heavy equipment sharing space, especially in the blind spots. Separation is the real control; the spotters, high-vis, and proximity tech back it up. Answer for how your site actually manages it. The score stays on your device; enter an email only if you want the struck-by prevention checklist sent over.

1. Is there an internal traffic control plan that separates people from equipment routes?
2. Are equipment blind spots identified and the kill zones kept clear?
3. Is a dedicated spotter used for blind moves, with eye contact and signals?
4. Is high-visibility PPE worn and enforced around equipment?
5. Where proximity warning or camera tech is used, is it tuned so it is not crying wolf?
6. Do you understand the tech is the last layer, not a replacement for separation and spotters?
7. Is the equipment maintained (cameras, alarms, mirrors, ROPS, seat belts) and inspected?
8. Do you log near-misses and proximity alerts and use them to fix the plan?

Next step: Build a yard list