Free field tools
Every Anvilfield field tool in one place
298 free calculators, readiness checks, and offline apps, grouped by trade. Run the number here, then take the offline app and the record to the field.
Where trades find buildings, assets and public work: choose the right source before planning the next site visit or estimate.
Calculators
Bolt torque calculatorEstimate bolt torque from the target preload: T = K x D x F, where K is the nut factor.Sling load calculatorFind the tension in each sling leg: (load weight / legs) divided by the sine of the sling angle from horizontal.Energy cost calculatorFind what a load costs to run: kWh = kW x hours, times the rate per kWh, per day and per year.Footcandle calculatorEstimate fixtures for a target light level: target lumens = area x footcandles, divided by the lumens each fixture delivers.Generator runtime calculatorFind how long a generator runs: usable fuel in gallons divided by the consumption in gallons per hour.Generator sizing calculatorSize a generator from the running load plus the largest motor's starting surge, with headroom: peak = running + surge.kVA to amps calculatorConvert kVA to full-load amps (or amps back to kVA) for single-phase and three-phase, from the voltage.Markup & margin calculatorConvert between markup and margin and price a job right: enter your cost and a target margin, target markup, or price, and get the price, profit, markup %, and margin %.Ohm's law calculatorEnter any two of voltage, current, resistance, and power, and the calculator solves the rest with Ohm's law.Watts to amps calculatorFind single-phase current from power: amps = watts divided by (volts x power factor).Solar production calculatorEstimate solar energy: kWh = system kW x peak sun hours x a derate factor, per day and per year.Three-phase power calculatorFind three-phase kW and kVA from volts, amps, and power factor: kVA = sqrt(3) x V x A / 1000, and kW = kVA x PF.Voltage drop calculatorSize the conductor against the run: enter the load and length, get the volts dropped and the percent against the 3 percent target.
Readiness checks
Arc flash readinessA 2 minute check on whether your electrical safety program would actually protect a worker from an arc flash, before an incident or an OSHA inspector tests it.Cash flow readinessA 2 minute check on whether you run a WIP, bill early, and collect fast, before a profitable company runs out of cash.Contractor business healthA 2 minute check on whether your trade business is run on numbers and cash discipline, before a profitable-looking year quietly turns into a payroll you cannot make.Conveyor safety readinessA 2 minute check on whether your conveyor is guarded, e-stopped, locked out, and aligned, before a nip point takes a hand or a jam-clear takes a worker.Cathodic protection checkA 2 minute check on whether your CP system is coated, sized, proven to criterion, and monitored, before corrosion eats a pipeline, tank, or structure you thought was protected.Crane & rigging readinessA 2 minute check on whether your crane pick is planned, rigged, and signaled to land safely, before a dropped load or a tip-over proves it was not.Sign install readinessA 2 minute check on whether your electric sign has the code disconnect, the wind-rated structure, and the permit, before it fails inspection or comes down in a storm.Electrical safety and LOTOA 2 minute check on the electrical safety practices that decide whether a worker goes home, before an arc flash or a re-energized circuit decides for you.Elevator readinessA 2 minute check for owners and PMs on whether your elevators are under the right contract, modernized in time, and kept up to code, before they strand tenants.Energy audit readinessA 2 minute check on whether your energy effort starts with the data, captures the free operational savings, and proves the results.Estimating health checkA 2 minute check on whether your bids actually recover your costs and win the right work, or quietly bleed margin one job at a time.Fleet & DOT readinessA 2 minute check on whether your service trucks and drivers would pass a DOT review and keep your crews safe, before a roadside inspection or a crash finds the gaps.Surety bonding readinessA 2 minute check on whether you understand surety bonds and have the financials, WIP, and relationship to grow your bonding capacity.Safety wearable readinessA 2 minute check on whether your safety wearables are calibrated, wired to a real response, and actually worn, before you trust them to catch a gas, fall, or heat event.Hot work safety checkA 2 minute check on whether your welding, cutting, and compressed-gas work has the permit, fire watch, clearance, and cylinder controls to avoid a fire or an explosion.
Offline apps
PoEHeatPoE voltage drop, bundle heat, conduit fill, and 802.3bt checks.EVFeederEV charger load, voltage drop, and feeder planning.Pull Plan CardCable pull planning and turnover card export.Storm Crew Day LogOffline storm crew timesheet, per-diem, lodging, equipment, mileage, and export records for mutual-aid foremen.Reel Remainder LogOffline cable reel balance log, pull history, partial-reel estimator, low-reel dashboard, and yard export packets.Assured Ground RouteOffline AEGCP color-route log for cord sets, temporary receptacles, tools, continuity readings, failed-item holds, and export records.Alarm Sweep 72Scans fire alarm devices, logs smoke detector sensitivity due dates, and exports NFPA 72 test records.AmpRightOffline electrical field tool for crews.BendRight DCOffline conduit bend calculator with cut list and phone angle check for electricians.CertPrep DCNICET fire alarm practice test app with NETA, NCCER, and NFPA 70E drills.Clearance ProofBefore and after span proof for utility line-clearance crews with GPS, clearance math, and sealed packets.Conduit Bid-in-a-TruckCounts devices and conduit footage into a line-item electrical bid from the truck, offline.Deficiency Tag LoopWrites consistent fire-life-safety deficiency wording with stamped photos and re-inspect tracking, offline.DGA Bottle Chain of CustodyTracks transformer oil DGA sample bottles with labels, photos, GPS, and custody export packages.DoorCertRuns AAADM-style automatic door inspections against ANSI limits and exports a signed PDF per door.Transformer Oil DGA ReaderGrades transformer oil, plots Duval triangle and pentagon, and exports per-unit field reports offline.FireBatt 72Builds an NFPA 72 fire alarm battery calc and point-by-point NAC voltage-drop worksheet for the AHJ.Foot Candle GridVerifies exterior lighting foot-candle readings against the approved photometric plan with uniformity and PASS/FAIL.GangBox DC ApprenticeOffline how-to cards, take-up marks, jargon decoder, and checkoffs for first-year electrical apprentices.Illegal Attach TallyPhoto-backed pole attachment audits for joint-use field walks, tallying exposure and exporting a review record.OhmGround FOPPlots fall-of-potential ground resistance readings, checks the 62% value, and exports a field report.Oil Pass GateRecords transformer oil and electrical acceptance tests offline with witness sign-off and evidence export.Pad-Mount Receiving CheckDocuments pad-mount transformer receiving with photos, nameplate compare, and locked signed records.Pay App SOVOffline G702/G703 SOV billing, retention, T&M, and closeout tracking for subcontractors.PitWitness Test-WellLogs ground test-well readings along routes with trends, GPS stamps, and photo evidence.Reel ReceivingInspects cable reels at the dock, photographs damage, tracks the claim clock, and builds receiving packets.Sag Field CardGives line crews a PASS or FAIL conductor sag card checked against the issued stringing chart.StaticFloor S20.20Logs ESD floor resistance and walking-body-voltage against the S20.20 pass-fail grid.Storm Force-Account LogLogs storm labor, equipment, photos, and force-account packets for utility and public works crews.Storm Material SlipBuilds GPS-tagged material slips for storm line crews and sends a clean PDF yard request from the pole.SunVaultOffline off-grid solar sizing for panels, battery bank, inverter, and charge controller from real loads.Sweep Radius CheckLogs conduit bends and sweep radius for duct-bank crews before backfill.
Calculators
CMU block calculatorFind blocks and mortar for a wall: about 1.125 standard 8x8x16 blocks per square foot, plus a bag of mortar per 28 to 32 blocks.Concrete bags calculatorFind how many bags of concrete a job needs: bags = volume (cubic feet) divided by the yield per bag, plus waste.Formwork pressure calculatorEstimate the lateral pressure of fresh concrete on column forms: P = Cw x Cc x (150 + 9000R/T).Concrete yardage calculatorFigure the cubic yards for a slab or footing from length, width, and thickness, with a waste allowance so you do not come up short.Dumpster calculatorFind how many roll-off containers a job needs: loose debris volume divided by the container size, in cubic yards.Drywall sheet calculatorFind how many drywall sheets a job needs: area to cover divided by the sheet size, plus waste.Truck load calculatorFind how many truck loads to haul off an excavation: loose volume = bank volume x (1 + swell), divided by truck capacity.Bearing pressure calculatorCheck soil bearing pressure under a footing: pressure = load divided by footing area.Rebar weight calculatorEstimate the weight of reinforcing steel in pounds and tons from the bar size, the length per bar, and the number of bars, using the standard ASTM A615 unit weights.Sonotube concrete calculatorFind the concrete for round piers or columns: volume = pi x radius squared x height.Stair calculatorLay out a stair from the total rise: number of equal risers, the exact riser height, the tread count, and the total run.Stud count calculatorFind how many studs a wall needs: length divided by the on-center spacing, plus the corners and openings.
Readiness checks
Bridge deck readinessA 2 minute check on whether your bridge deck is built or rehabbed to stop chloride corrosion, before the deck spalls again and the structure suffers.Coating durability checkA 2 minute check on whether your coating or lining job is set up to hold for years, before it peels at the one spot you skipped and the whole thing fails early.Pool construction readinessA 2 minute check on whether your commercial pool is engineered for uplift, shot void-free, plumbed-and-tested, and drain-compliant, before it floats, leaks, or fails inspection.Concrete pour readinessA 2 minute check before the first truck rolls, so weather, subgrade, and a missed test do not cost you the slab.Layout readinessA 2 minute check on whether your construction layout comes from a protected control network, the right tool and tolerance, and a verify before the pour.Construction robotics readinessA 2 minute check on whether a jobsite robot fits the task, the model, and the safety plan, before you buy hype instead of help.Demolition readinessA 2 minute check on whether your demo job is surveyed, made safe, and contained before you swing a hammer, not after you hit asbestos or a live wire.Excavation readinessA 2 minute check on whether the dig and the foundation are set up to avoid a collapse, a flood, or a settling building, before the excavator turns the first bucket.Jobsite camera readinessA 2 minute check on whether your camera system has the response, power, and privacy compliance to deter theft and document the site, not just record it.Jobsite security readinessA 2 minute check on whether your site layers its security, locks up the high-value gear, and can recover what walks off.Lean construction readinessA 2 minute check on whether your work is planned to flow, with constraints removed before the crew shows up, or just pushed and hoped.Metal building readinessA 2 minute check on whether your pre-engineered metal building has the anchor bolts, bracing, and sequence right, before a frame will not land or a wall collapses.Silica control readinessA 2 minute check on whether your crew controls respirable silica at the source and meets the OSHA standard, before the dust scars lungs or draws a citation.Fireproofing readinessA 2 minute check on whether your spray fireproofing is applied to the listed thickness, bonded to the steel, inspected, and patched, before the rating is silently void.Stucco/EIFS readinessA 2 minute check on whether your stucco or EIFS drains the water out, before trapped water rots the wall like the EIFS failures of the 90s.Tenant improvement readinessA 2 minute check on whether your TI is set up to hit the move-in date, with the permit, long-lead items, and allowance under control.Tile install readinessA 2 minute check on whether your tile job has the substrate, coverage, waterproofing, and movement joints to hold, before it cracks, tents, or leaks.
Offline apps
FreshTest DCSlump, air, temperature, unit weight, yield, and truck verdicts.PourClockConcrete evaporation timing and active pour gates.ScanMark DCScanner readings, bit-depth stops, and deck drill maps.AnchorProofRuns post-installed anchor special inspections against your ESR and exports a signed proof-load record.Anchor Template CheckPre-pour anchor-bolt template checks with evidence capture and export packets.BracePass DCTilt-up brace calculator for brace count, insert height, deadman pull, and crane-release checklist.CoatYield DCPlans resinous floor coating coverage, kits, pot-life, recoat windows, and yield for slab crews.FrostPourPlans cold-weather concrete placement temp, protection period, and a signed temperature log per ACI 306R.GroutPour Baseplate DCCalculates non-shrink baseplate grout bag count and gives a cure GO/NO-GO by substrate temperature.JointPlanSolves a near-square control-joint grid for slab-on-grade with saw-cut depth and timing.Laydown Yard MapGrids a jobsite laydown yard, pins bulk material by cell, and exports handover maps and item lists.OverhangProof: Counter SpanChecks countertop overhangs against material limits and the 1/3 rule and plans bracket spacing.PlankPilotPlans LVP, laminate, and wood flooring installs, floating or glue-down.PourPilotCalculates concrete yards, bags, and ready-mix cost in a fast offline app.SetupCheck DCGrades a total station setup check shot PASS or RE-SHOOT for layout techs before they stake.ShoreSafeOSHA trench slope calculator and soil classifier that gives a signed GO or STOP trench card.SnapTime Silicone QCLogs snap-time, butterfly, snake, and mix-ratio checks per batch for two-part structural silicone pumps.SprayMixCalculates HVLP thinning ratio, tip size, and ounces to mix for lacquer and conversion varnish.StrengthGate DCValidates an ASTM C1074 maturity curve and logs logger temps to gate concrete strip, load, and lift releases.StringerWiseOffline stair stringer calculator for rise, run, cut marks, and IRC/IBC code checks for carpenters.StuccoProofOffline stucco inspection checklist that records WRB, lath, weep, coats, and exports a signed field report.WallWrightOffline concrete, masonry, and hardscaping field tool with a one-time purchase.WeldVTJudges visual weld calls against AWS D1.1, issues NCRs, and exports a weld-by-weld VT report.
Calculators
ACH to CFM calculatorFind the airflow for a target air change rate: CFM = room volume x ACH / 60, from floor area and ceiling height.Ventilation rate calculatorFind the breathing-zone outdoor air a space needs: Vbz = Rp x Pz + Ra x Az.Tons to BTU calculatorConvert a cooling load to tons of refrigeration: tons = BTU per hour divided by 12,000.Dew point calculatorFind the dew point from air temperature and relative humidity, and the surface temperature condensation forms at.Duct equivalent diameterConvert a rectangular duct to its equal-friction round diameter: De = 1.30 x (a x b)^0.625 / (a + b)^0.250.Affinity laws calculatorScale fan or pump flow, pressure, and power for a speed change using the affinity laws: flow with speed, pressure with the square, power with the cube.Duct airflow calculatorSolve duct airflow and velocity from the duct size using continuity (Q = V x A): enter a round or rectangular duct and either the CFM or the velocity, and get the other.Hydronic load calculatorFind the heat load of a hydronic loop from flow and temperature difference: BTU/hr = GPM x 500 x delta-T, and tons = GPM x delta-T / 24.Mixed air temp calculatorFind the mixed air temperature from the outdoor and return temps and the outdoor-air percentage.NPSH available calculatorFind the net positive suction head available to a pump: NPSHa = atmospheric + static - vapor pressure - friction head.Pump BHP calculatorFind pump brake horsepower from flow and head: BHP = (gpm x head x specific gravity) / (3960 x efficiency).Sensible heat calculatorFind the sensible heat an airstream carries: BTU/hr = 1.08 x CFM x the temperature difference.
Readiness checks
Cold storage readinessA 2 minute check on whether your refrigerated warehouse handles the floor heave, vapor drive, and ammonia risk a walk-in never faces, before the slab cracks or a leak shuts you down.Succession & exit readinessA 2 minute check on whether your business is built to transfer for real value, before the day you want out arrives and you find out it is worth less than you hoped.EPA 608 practice testTen questions across the Core section and all four certification types, the way the real EPA 608 exam splits the work.HVAC Cx readinessA 2 minute check on whether an HVAC system will actually pass commissioning and run as designed, before the Cx agent and the owner find the problems.IAQ monitoring readinessA 2 minute check on whether your IAQ monitoring uses good sensors, watches the right things, and triggers a real response, or just shows numbers.NFPA 96 grease exhaust readinessA 2-minute check on whether the grease path, its fire protection, and the records are actually ready before the fire marshal walks it.Predictive maintenance checkA 2 minute check on whether your maintenance catches failures developing on the critical equipment, or just reacts after they break.Brazing and evacuation readinessA two-minute check that catches the setup gaps that seed scale, hide leaks, and leave moisture in the system.Retro-commissioning readinessA 2 minute check on whether your existing building is tuned to work as intended, or quietly drifting and wasting energy.RTU startup readinessA 2-minute check that catches the curb, trap, rotation, airflow, charge, and rise gaps before you sign the startup sheet.Warranty management readinessA 2 minute check on whether you track warranties, catch defects before they expire, and triage callbacks, or let the warranty year drift.
Offline apps
BlowerCFMAirflow and commissioning checks for HVAC work.GaugeGate DCDuct gauge, leakage, layout, and balance records.Hood Suppression PacketWet-chemical kitchen-hood semi-annual packets with nozzle maps, link clocks, cylinder date checks, signatures, and AHJ exports.ChargeRightOffline superheat and subcooling calculator giving HVAC/R techs a charge PASS, ADD, or RECOVER verdict.Dryer Airflow TestMeasures commercial dryer airflow, static pressure, and lint restriction and prints a condition report.DryPlan S500Sizes air movers and dehumidifiers for water-damage restoration with S500-derived room-by-room math.Walk-In Cooler Gasket FinderMeasures and matches cooler and oven door gaskets and exports a clean parts-desk order list.FryerStat Manometer LogLogs fryer, range, and oven gas manifold WC readings against targets with a before/after proof sheet.LoopWright Radiant DesignerOffline hydronic radiant design from room heat loss to loop lengths, GPM, and circulator match.ShaftLine DCTurns dial readings and machine dimensions into shim and slide moves for millwright shaft alignment.StaticDoctorField app for residential and light-commercial HVAC airside service and install.TitrateSuite DCConverts drops to ppm, sizes loops and pumps, and charges chilled-water loops for water-treatment techs.
Calculators
Dehumidifier sizingSize dehumidification for a water loss: AHAM pints per day = affected volume divided by the class factor.Pipe velocity calculatorFind water velocity in a pipe from the flow rate: V = 0.4085 x GPM / diameter squared, in feet per second.Pipe volume calculatorFind the water a pipe holds from its inside diameter and length: V = pi/4 x diameter squared x length, in gallons.Propane runtime calculatorFind how long a propane tank lasts: hours = usable tank energy divided by the appliance BTU load.Fill/drain time calculatorFind how long a tank takes to fill or empty: time = volume divided by flow rate.Tank volume calculatorFind the gallons in a vertical cylindrical tank from its diameter and height: V = pi/4 x diameter squared x height, in gallons.Pipe expansion calculatorFind how much a pipe run grows or shrinks: movement = length x coefficient x temperature change.Water heating calculatorFind the heat to warm flowing water: BTU/hr = GPM x 500 x the temperature rise, with the kW equivalent.
Readiness checks
Backflow test readinessCatches the expired cert, the out-of-cal gauge, or the unbled line that gets a clean assembly reported wrong or the report bounced.Confined space readinessA 2 minute check on whether your confined-space entries are permitted, tested, and rescue-ready, before an atmosphere or a would-be rescuer turns one death into three.Fire protection readinessA 2 minute check on whether the sprinklers, fire pump, and standpipes would actually do their job in a fire, before an inspection or an incident finds out for you.Fire restoration readinessA 2 minute check on whether your fire and smoke cleanup matches the soot type, dries the water first, and kills the odor at the source.Medical gas piping readinessA 2-minute check that catches the credential, brazing, and verification gaps that keep a system from being used on a patient.Process piping weld checkA 2 minute check on whether your process piping is welded, examined, and tested to the fluid service it carries, before a failed weld leaks something hazardous.Loss response readinessA 2 minute check on whether your team can respond to a water, fire, or biohazard loss safely, correctly, and in a way the insurer will pay, before the next call comes in.Water restoration readinessA 2 minute check on whether your water mitigation moves fast enough, dries to standard, and documents the job, before mold sets in or the claim is denied.Water heater install readinessA 2-minute check that catches the missing demand number, unproven draft, and starved combustion air before you set the unit.Treatment plant readinessA 2 minute check on whether your water or wastewater plant work is controlling the gases, confined spaces, biological process, and discharge permit, before a fatality or a violation.
Offline apps
Backflow Fix It DCFailed-test diagnosis, kit lookup, retest gates, and repair export.FITUP DCGives WPS bevel angle, root gap, land, and hi-lo limits for weld fit-up plus weld-map exports.GasTrunkOffline app for plumbing, gas fitting, and HVAC install work.HeadRoomOffline app for well and pump installers, plumbers, and pump-house service techs.InvertChain DCOffline pipe invert grade calculator that chains inverts manhole to manhole and outputs a laser cut sheet.Restroom Route ScoreScores restroom routes against APPA levels with photo proof and property-manager audit exports.Salt Cell ServiceSalt dose, cell cleaning, diagnostics, and PDF service proof for pool route techs at the pad.SSO ClockStarts the sanitary sewer overflow clock, estimates gallons, and exports a clean event packet.TrenchSafeFinds OSHA trench slope, benching, spoil setback, and egress, then captures a signed daily inspection.VentWrightSizes DWV drains, stacks, and vents under IPC 2021 and exports a permit-ready riser diagram.WaterShot DCRecords water-main thrust restraint and hydro test results for a clean closeout packet.WrapBid DCPipe insulation takeoff by size with man-hours, material, bid PDF, and pay-app exports.
Calculators
UPS runtime calculatorEstimate how long a battery or UPS holds a load: runtime = usable kWh x efficiency / load kW.PUE calculatorFind a data center's Power Usage Effectiveness: total facility power divided by the IT load, plus DCiE and the overhead in kW.Rack airflow CFM calculatorFind the CFM a rack needs from its kW load and the supply-to-return temperature rise: CFM = kW x 3412 / (1.08 x deltaT).Rack current & sizing calculatorConvert rack kW to amps (single or three phase) and size the continuous feeder and breaker at 80% per the NEC.Raised floor load calculatorCheck the uniform load a cabinet puts on a raised access floor (psf) against the floor rating before you roll it into place.Redundancy capacity calculatorFind the usable capacity of a UPS, generator, or cooling plant under N, N+1, or 2N, and check it carries the critical load with a unit down.
Readiness checks
BIM coordination readinessA 2 minute check on whether your model coordination actually resolves clashes before the field, before a duct meets a beam on site.Connected jobsite readinessA 2 minute check on whether your IoT and RTLS data actually changes decisions, with the connectivity, platform, and privacy to make it work.AI density readinessA 2 minute check on whether your facility can actually power, cool, connect, and support the 50-to-130kW+ AI racks the build-out is bringing, before you commit the space.Data center Cx readinessA 2 minute check on whether the project is actually ready to commission, before a squeezed Cx schedule or a missed failure test turns into a go-live outage.Liquid cooling readinessA 2 minute check on whether your facility and team can deploy and operate liquid cooling safely and reliably, before the first leak or the first stranded GPU rack proves you were not.DC ops readinessA 2 minute check on whether your day-2 operations actually deliver the uptime the facility was designed for, before a human-error outage proves they do not.Digital twin readinessA 2 minute check on whether your digital twin is connected, current, and actually used to operate the building, or just a static model on a shelf.Turnover and closeout readinessA 2 minute check before you call a job done, so a missing as-built or test report does not hold your retention hostage.Quality control readinessA 2 minute check on whether your QC program builds quality in with an ITP and hold points, or just catches defects at the end.Reality capture readinessA 2 minute check on whether your laser scanning ties to control, hits the right accuracy, and actually gets used to verify the build.Switchgear delivery readinessA 2 minute readiness check before the gear hits the dock, so a tripped indicator or a missed claim window does not become your problem.
Offline apps
FieldOS by AnvilfieldOffline-first FieldOS for job photos, proof packets, property memory, calculations, teams, billing, and owner-ready reports.Switchgear Receive QAReceiving packets, shortages, photos, and claim-window reminders.RackSet DCRack layout, readiness checks, matrices, and floor-load workflow.Fire-Watch Hourly Patrol LogScanned, photo-proven fire-watch rounds with local PDF, CSV, JSON, photo, and ZIP exports.TieMap DCOffline scaffold tie, guy, and brace maps with daily competent-person inspection records and signed tag-packet exports.HeatBand DCWeld heat-input kJ/in bands, per-pass ledgers, material trace fields, and CWI-ready PDF/CSV exports.HydroTest DCPressure-test package math, hold timing, thermal drift verdicts, witness signatures, and PDF/CSV records.BESS Commissioning PunchCold and hot BESS commissioning checks, witnessed hold points, photo punch, and signed turnover packets.HoursProof DCWorker-owned hours, overtime, per diem, paycheck reconcile, and export records for traveling construction hands.TakeoffField DCOffline count, length, and area takeoff that turns field quantities into priced change-order lines with waste, labor, markup, and export math.PatchRecord DCOffline cross-connect, demarc owner, panel-port, barcode, photo proof, occupancy, and export records for data center MMR crews.HuddleBoard DCOffline datacenter morning huddle, manpower-by-area count, blocker ownership, safety acknowledgement, signature, and export packet.DropTakeoff CopperOffline low-voltage cabling takeoff and per-drop bid math with cost books, forgotten-line flags, what-if copies, and PDF/CSV exports.BMP Takeoff DCOffline erosion-control BMP takeoff, bid pricing, build sheets, and pay-app quantity exports for large civil jobs.DeckCheck DCGives a clear or unsafe fall-clearance verdict for harness, SRL, and anchor at datacenter tie-offs.FiberCert DCLabels trunks and logs OTDR and OLTS PASS evidence to build the fiber cert packet for data-center closeout.FloorGrid DCProves raised-access-floor level, lippage, cut-tile, and load-test results into a QA acceptance packet.Load Bank Interval LogLogs generator load bank intervals at the panel with pass/fail checks and signed test records.OTDR Bidirectional Loss LogAverages both-direction OTDR splice loss, catches gainers, and exports a per-fiber turnover matrix.PanelCourse DCSolves metal panel start points, reveal hits, cut lists, and hang maps for cladding crews.Pick Planner DCOffline crane pick planning with load charts, rigging checks, bearing pressure, and signed lift cards.PolaritySolver DCChecks fiber MPO/MTP polarity for data-center trunks with Method A/B/C and pinned endfaces.ProdTrack DCTracks earned vs spent labor hours, cost at completion, and red flags for datacenter subs.PullRight DCCalculates cable pull tension, sidewall pressure, jam ratio, lube, and a GO/NO-GO verdict.RigChainOffline rigging calc for center of gravity, sling tension, hardware checks, and signed rig sheets.SpliceCoach DCFusion splice loss app with bidirectional averaging, gainer checks, and tray ledger for data halls.TrayFill CopperCable tray fill calculator for Cat6A, conduit sleeves, J-hook support, and per-segment pathway reports.WasteTrack DCTurns haul tickets and roll-off box status into a construction waste diversion report.WaterMistProof DCRecords NFPA 750 water mist zone acceptance checks and exports a signed field record.
Calculators
Fall clearance calculatorFind the clearance a personal fall arrest system needs below the anchor: free fall + deceleration + worker height + a safety margin.R-value thickness calculatorFind the insulation thickness for a target R-value: thickness = target R divided by the material's R per inch.Ladder setback calculatorSet a ladder safely with the 4 to 1 rule: base setback = height to contact divided by four.Coating coverage calculatorFind the paint or coating needed: gallons = area x coats / the coverage rate, plus waste.Roof squares calculatorEstimate roofing squares from the building footprint and the pitch: roof area = footprint x the pitch multiplier, and one square is 100 square feet.
Readiness checks
Envelope readinessA 2 minute check on whether the air barrier, insulation, and moisture control are working together, before high bills, condensation, or rot prove they are not.Roof maintenance readinessA 2 minute check on whether your low-slope roof is on a real maintenance program, before a clogged drain or a skipped inspection turns into an interior leak and a voided warranty.Drone inspection readinessA 2 minute check on whether your drone inspections are flown legally, capture the thermal data that matters, and feed a report the crew can act on.Facade access readinessA 2 minute check on whether your swing stage, mast climber, or scaffold is rigged, tied, loaded, and tied off so a failure does not drop someone off the building.Fall-protection complianceA 2 minute check on the program OSHA actually looks for, before a fall or an inspection finds the gap for you.Jobsite safety readinessA 2 minute check on whether your crews are actually protected from the hazards that kill in the trades, before an injury or an OSHA inspection finds the gap for you.Siding install readinessA 2 minute check on whether your siding job has the water barrier, flashing, and install details that actually keep the wall dry.Single-ply seam and attachment QA readinessA 2-minute check that catches the missing trial weld, the unprobed seam, and the untested deck before they cost you the warranty.Storm claim documentation readinessA quick check of whether your crew has the verification, test squares, photos, and legal guardrails a storm claim needs before tear-off.
Offline apps
BlindSide Spark DCSets spark holiday-test voltage, maps membrane holidays, and exports a signed survey package.CricketWrightSizes roof crickets at twice the field slope and counts tapered polyiso boards into a cut-and-stack layout.DrainPass RoofChecks roof slope, crickets, and 48-hour ponding tests against the stamped plan on low-slope roofs.FilmProofRecords dry-film-thickness readings, runs SSPC-PA2 spot and area math, and exports a signed conformance report.PanelRunLays out metal roof panels per plane with panel count, seam layout, sliver split, and cut lengths.SteelCoatOffline structural-steel coating takeoffs for paintable sqft, coat gallons, kit counts, and bid sheets.UpliftZoneDraws ASCE 7-22 roof wind zones, computes uplift pressures, and exports a counted fastening-plan PDF.VectorMap ELDPlans roof electronic leak detection surveys, pins breaches on a grid, and exports the report.
Calculators
Aggregate base calculatorFind the tons of crushed aggregate base for a given area and compacted depth.Asphalt density calculatorTurn a mat density reading and the Gmm into % Gmm and air voids, and check it against the acceptance target before the lot cools.Asphalt tonnage calculatorEstimate the tons of hot-mix asphalt for a job from length, width, compacted thickness, and the mix unit weight, with a waste allowance.Soil swell/shrink calculatorConvert earthwork volume between bank, loose (haul), and compacted using swell and shrink: loose = bank x (1+swell), compacted = bank x (1-shrink).Trench volume calculatorFind excavation volume: length x width x depth in feet, divided by 27 for cubic yards, plus an approximate truck-load count.
Readiness checks
ADA ramp and parking readinessA two-minute pass that flags the slope, count, aisle, warning, and sign gaps that get accessible work chipped out and re-poured.Density acceptance readinessA 2-minute check that catches the missing Rice test, uncorrelated gauge, or untested joint before the cores come back and settle it for you.Milling grade-control readinessA two-minute check on whether depth, grade reference, drum, castings, and the drop-off are handled before the drum drops.Asphalt paving day readinessA 2 minute check before the paver moves, so a short compaction window, a cold joint, or a segregated mat does not lock low density into the lot.Pavement foundation readinessA quick check on subgrade and base, because the layer under the pavement decides how long the surface lasts, and it is buried after you pave.Striping readiness checkA 2-minute check that catches the prep, cure, weather, layout, and record gaps that peel a lot or fail its inspection.Pavement preservation timingA quick check on treatment selection and timing, so preservation dollars go to roads that can still be saved instead of ones that need reconstruction.Struck-by prevention readinessA 2 minute check on whether your site separates people from equipment, with the plan, the spotters, and the tech to back it up, before a struck-by injury.
Offline apps
MatWindowAsphalt paving and compaction timing.Brake Stroke CardRecords air-brake pushrod stroke, chamber limits, and margin, then exports an axle proof sheet.CulvertCheckOffline FHWA HDS-5 culvert calculator giving a pass or fail headwater verdict with PDF reports.DirtBalanceOffline excavation and site-grading tool for earthwork cut and fill estimating.LotDoctorAsphalt pavement maintenance and commercial lot assessment on device.PaverFitPlans interlocking concrete paver and clay brick hardscape installs offline.PaverProCalculates pavers, gravel base, sand, and cost for patio takeoffs in one offline entry.RollPassTurns nuclear gauge readings and Proctor curves into percent compaction with a PASS or FAIL for soil lifts.SaltLedgerCalculates salt rate per zone from pavement temperature and logs photo-backed service records.StripeSetLays out parking stalls, auto-places ADA spaces, totals paint, and exports a dimensioned compliance PDF.UCPercentMeasures undercarriage wear percent on tracked equipment and exports signed inspection reports.
Calculators
Bulk material calculatorEstimate the cubic yards, cubic feet, bags, and tons of mulch, gravel, topsoil, or sand for a bed or area from length, width, and depth.Deck board calculatorFind the deck boards for a deck: boards = deck area divided by the coverage of one board, plus waste.Drip run time calculatorFind a drip zone's precipitation rate and run time: rate = GPH x 1.604 / area, and run time = target depth divided by the rate.Fence post calculatorFind the posts, sections, and rails for a fence run: sections = length divided by post spacing.Precipitation rate calculatorFind how fast a zone applies water: PR (in/hr) = 96.25 x total gpm / zone area, and the run time to hit a target depth.Paver count calculatorFind how many pavers or bricks an area needs: area divided by the coverage of one unit, plus a waste allowance for cuts and breakage.Runoff calculator (Q=CiA)Estimate peak stormwater runoff from a small site with the rational method: Q = C x i x A, in cubic feet per second.Retaining wall calculatorFind the segmental wall blocks for a wall: face blocks = wall face area divided by the block face area.Slope and grade calculatorTurn rise and run into percent grade, degrees, a run-to-rise ratio, and inches per foot for grading, drainage, and ramps.Sod & seed calculatorFind the sod (square feet and pallets) or grass seed (pounds) to cover an area.
Readiness checks
Track surfacing readinessA 2 minute check on whether your running track has the flat, sealed base, the right system thickness, and the geometry and certification it needs, before it ponds and fails.Dock & marina readinessA 2 minute check on whether your dock or marina handles electric shock drowning, the water environment, and the permits, before someone is hurt or the build is stopped.Deck construction readinessA 2 minute check on whether your deck has the ledger, footings, span, and guardrail to carry people safely, before a collapse or a fall.Exterior cleaning checkA 2 minute check on whether your pressure and soft washing matches the method to the surface, protects people and plants, and keeps the wash water out of the storm drain.Living wall readinessA 2 minute check on whether your green wall is built as a building system, with the waterproofing, irrigation, structure, light, and maintenance it needs to survive.Fire feature readinessA 2 minute check on whether your fire pit or fireplace holds its clearances, uses rated media, and runs gas to code, before a fire, an explosion, or a code violation.Outdoor kitchen readinessA 2 minute check on whether your outdoor kitchen has the gas, ventilation, and outdoor-rated build to be safe and survive the weather.Pergola readinessA 2 minute check on whether your pergola or shade structure is anchored against wind uplift, footed below frost, and permitted, before it lifts off.Playground readinessA 2 minute check on whether your playground has the surfacing, use zones, and entrapment safety that prevent the injuries, before a fall or an audit finds them.
Offline apps
BoulderRigOffline field app for boulder-wall, water-feature, and natural-stone landscape crews.CascadeWrightOffline field app for water-feature, pond build, and waterscape contracting crews.DeckFrameSizes deck joists, beams, posts, and footings to DCA6 and IRC and exports a code-cited PDF plan.MatchRate Irrigation AuditRuns catch-can DU audits and turns ET, soil, and slope into controller-ready cycle-soak schedules.RunoffRouteField app for residential and light-commercial drainage, grading, and stormwater work.TurfClockOffline app for lawn-care and turf IPM season programs.TurfRateCalculates lawn fertilizer rates, liquid tank mixes, and spreader starting settings offline.
More field tools
Slide-Out Sync SetterRV slide mechanism ID, re-sync sequences, amp-band checks, fault notes, photos, and service proof exports for field techs.DryTrip DCOffline dry-pipe and pre-action air-hold, trip-test, retest, signature, certificate, riser-tag, and CSV records for sprinkler fitters.CutEdgeMachining and CNC reference for mill, lathe, drill, and tap work, offline.TapWiseOffline app for machining, CNC, fabrication, and DIY tapping work.
Printable field-card packs
All field guidesElectrical field-card packEvery electrical threshold, spec, and code in one printable PDF.Concrete field-card packEvery concrete threshold, spec, and code in one printable PDF.HVAC field-card packEvery HVAC threshold, spec, and code in one printable PDF.Plumbing field-card packEvery plumbing threshold, spec, and code in one printable PDF.Datacenter field-card packEvery datacenter threshold, spec, and code in one printable PDF.Roofing field-card packEvery roofing threshold, spec, and code in one printable PDF.Paving field-card packEvery paving threshold, spec, and code in one printable PDF.Landscaping field-card packEvery landscaping threshold, spec, and code in one printable PDF.Market Intelligence field-card packEvery market intelligence threshold, spec, and code in one printable PDF.