Readiness check

Will your protective coating actually last?

A protective coating fails from how it was applied far more than from which product went on. Bad prep, the wrong conditions, and a missed pinhole take down an expensive job long before the coating itself wears out. Answer for how the work actually runs, not the data sheet on the wall. The score stays on your device; enter an email only if you want the coatings readiness checklist sent over.

1. Do you blast or prep to the specified SSPC/NACE cleanliness standard for the service?
2. Do you degrease (solvent clean) before blasting so you do not drive oil into the surface?
3. Do you check the anchor profile so the coating has the right tooth to grip?
4. Do you track the dew point and surface temperature before and during coating?
5. Do you measure dry film thickness against the spec (not too thin, not too thick)?
6. Do you stripe coat the edges, welds, and corners where coating thins out?
7. For immersion or tank linings, do you holiday-test for pinholes and repair them?
8. Do you let the coating fully cure before putting it into service or filling the tank?

Quarterly tank monitoring through PorchRocket's Asset Search reports additions and removals with dated views, keeping a lining contractor's territory current between coating campaigns.