ANVILFIELD Try FieldOS

Readiness check

Are you preserving the right pavements at the right time?

Pavement preservation only pays when the right treatment lands on the right road at the right time, which is early, while the pavement is still in good shape. Spend it on a failed road and it is gone in a season. Answer for the network or project you are planning. The score is computed on your device; add an email only if you want the treatment-selection guide sent over.

1. Do you have a current condition assessment (PCI or equivalent) for the pavements in question?
2. Are you matching the treatment to the distress and the remaining life, not a one-size approach?
3. Are you treating good and fair pavements first (worst-first spends the budget the fastest)?
4. Are cracks sealed before a surface treatment goes over them?
5. Is the pavement a preservation candidate at all, or does it actually need mill-and-overlay or reconstruction?
6. Is the treatment matched to traffic and surface (chip seal, slurry, micro, fog, thin overlay)?
7. Is timing set for cure and weather (temperature and moisture windows for the treatment)?
8. Is there a plan to track how each treatment performs so the program improves?

Beyond road networks, the same condition-based treatment choices apply to parking lots: PorchRocket's Ground Control lists commercial properties with lots by business type for building a private pavement maintenance route.

Next step: Find preservation programs