ANVILFIELD Try FieldOS

Field calculator

Ohm's law calculator

Enter any two of voltage, current, resistance, and power and leave the rest blank. The calculator solves the others with Ohm's law (V = I times R) and the power relationships (P = V times I). It is for a DC or resistive single-phase circuit; for AC motor and reactive loads, power factor and phase apply.

Worked example

A 240 V circuit feeds a 12 Ω resistive heating element. Find the current and power.

  • Voltage240 V
  • Resistance12 Ω
  1. Current: I = V ÷ R = 240 ÷ 12 = 20 A.
  2. Power: P = V × I = 240 × 20 = 4,800 W (4.8 kW).

20 A and 4,800 W. A continuous 20 A load needs a 25 A circuit (80% rule), so size the breaker and wire accordingly.

Change the numbers in the calculator above to run your own.

More Electrical calculators

Next step: Look for heating circuit work

Ohm's law FAQ

How does the ohm's law calculation work?

Enter any two of voltage, current, resistance, and power and leave the rest blank. The calculator solves the others with Ohm's law (V = I times R) and the power relationships (P = V times I). It is for a DC or resistive single-phase circuit; for AC motor and reactive loads, power factor and phase apply.

What does the ohm's law result mean?

Ohm law and the power relationships for a DC or resistive single-phase circuit: V = I × R and P = V × I. Enter any two of voltage, current, resistance, and power; the rest are solved. For AC motor or reactive loads, power factor and phase apply, so use the kVA-to-amps calculator and the load-calculation guide.

More in the Voltage drop field guide.