Will your tenant build-out hit the lease date?

A tenant improvement lives or dies on the lease date, because the rent clock and move-in are fixed. The schedule, the permit, and the long-lead items are the real risks, and the allowance and work letter govern the money. Answer for how the build-out is actually set up. The score stays on your device; enter an email only if you want the tenant improvement checklist sent over.

1. Is the schedule driven by the lease date (move-in and rent commencement)?
2. Do you understand the TI allowance and the work letter (who pays for what)?
3. Have you verified the existing conditions against the as-built (the shell is never as drawn)?
4. Is the base-building capacity confirmed (HVAC, power, sprinkler the tenant taps into)?
5. Is the MEP coordinated into the tight ceiling before the work starts?
6. Is the TI permit pulled early (the timeline long pole)?
7. Are the long-lead items (switchgear, HVAC units, glass, millwork) ordered early?
8. Is there a closeout plan for the certificate of occupancy before move-in?