ANVILFIELD Try FieldOS

Readiness check

Is your trade fleet ready for a DOT audit and safe on the road?

A trade fleet is rolling liability: the trucks carry your crews, tools, and reputation, and a single preventable crash or a failed audit costs far more than the program to prevent it. Many contractors do not realize where federal and state motor-carrier rules apply to them. This is general guidance, not legal advice; confirm your obligations with a qualified advisor. The score stays on your device; enter an email only if you want the fleet readiness checklist sent over.

1. Do you know which DOT/FMCSA rules apply to your vehicles (by weight, type, and what you haul)?
2. Do you qualify and check drivers (license/CDL where required, MVR/driving record, screening)?
3. If hours-of-service or CDL rules apply, are you tracking and following them?
4. Are drivers doing pre-trip inspections and reporting defects (DVIR where required)?
5. Is fleet maintenance preventive and documented (not run-to-failure)?
6. Do you have a written fleet safety policy (distracted driving, seatbelts, speed, backing)?
7. Do you secure loads, ladders, and equipment so nothing becomes a road hazard?
8. Do you have a crash/incident procedure and the insurance and records to back it up?

Next step: Calculate route density