Readiness check

Is your quality built in or inspected in at the end?

Quality is built in by a planned, documented process, not inspected in at the end. The test is whether you have an inspection and test plan, real hold points, and the records to prove it. Answer for how quality is actually controlled on your project. The score stays on your device; enter an email only if you want the quality control checklist sent over.

1. Is there an inspection and test plan (ITP) defining what is checked, when, and to what criteria?
2. Are acceptance criteria measurable (a spec or tolerance), not 'looks good'?
3. Are hold points enforced so work cannot proceed until it is inspected and signed off?
4. Do you inspect the first-of-its-kind work or a mock-up to set the standard?
5. Do nonconformances get documented (NCR), dispositioned, root-caused, and closed?
6. Is QC independent of production (the checker is not the one being pushed to finish)?
7. Do you keep the records (sign-offs, test reports) that prove compliance?
8. Does quality start at the submittal (approving material before it is installed)?