ANVILFIELD Try FieldOS

Readiness check

EPA 608 certification practice test

The EPA 608 exam is built from the Core section plus the type you certify for, so this practice test pulls from both. The questions below mirror the domains the real test grades: the venting prohibition, recovery versus reclaim, cylinder handling, the sales restriction, and how Type I, II, III, and Universal divide the equipment. Your score is calculated on your device. Enter an email only if you want the full study guide sent over.

1. Section 608 of the Clean Air Act prohibits which of these?
2. Why does releasing CFC and HCFC refrigerant damage the stratospheric ozone layer?
3. What does it mean to RECLAIM refrigerant under Section 608?
4. When you fill a refillable recovery cylinder with liquid refrigerant, what is the limit?
5. A large refrigerant release happens in an enclosed mechanical room. What is the hazard and the right move?
6. Under the sales restriction, who may buy refrigerant, and how long does the seller keep the records?
7. Type I certification covers which equipment?
8. A tech who services residential and light-commercial AC running R-22 or R-410A needs which certification?
9. Which certification covers low-pressure appliances such as centrifugal chillers, and what sets those systems apart?
10. How does a technician earn Universal certification?

Next step: Find rooftop service accounts