ANVILFIELD Try FieldOS

Readiness check

Is your pressure washing safe, effective, and legal?

Exterior cleaning goes wrong three ways: the wrong method wrecks the surface, the chemistry burns plants or people, and the wash water enters the storm drain and brings a fine. Answer for how the crew actually works, not the ideal. The score stays on your device; enter an email only if you want the exterior cleaning checklist sent over.

1. Do you match the method to the surface (pressure for hard surfaces, soft wash for delicate)?
2. Do you soft wash roofs and other delicate surfaces instead of pressure washing them?
3. Do you mix the cleaning solution to the right strength and let it dwell rather than overusing pressure?
4. Do you protect plants and property (pre-wet, rinse, cover) from the chemicals?
5. Do you keep wash water out of the storm drain (contain, reclaim, or divert)?
6. Do you know and follow the local stormwater rules (Clean Water Act, local ordinance)?
7. Do you use the right equipment (GPM for rinsing, surface cleaner for flatwork, hot water for grease)?
8. Is the crew trained on chemical safety and the high-pressure injection-injury hazard?

A surface cleaner earns its keep on flatwork, and PorchRocket Ground Control lists commercial buildings with parking lots for crews selling that service.

Next step: Get roof-streaking lists