ANVILFIELD Try FieldOS

Readiness check

Is your pavement foundation ready before you pave?

The pavement is only as good as what it sits on, and every foundation problem gets buried the day you pave over it. Answer for the section you are about to build. The score is computed on your device; add an email only if you want the base-and-subgrade checklist sent over.

1. Is the subgrade compacted to the specified density and proof-rolled for soft spots?
2. Is the subgrade moisture near optimum (not bone-dry, not pumping wet)?
3. Is the base thickness and gradation confirmed against the pavement design?
4. Where the subgrade is soft, is stabilization or geotextile separation planned?
5. Is drainage handled (edge drains, daylighting, or subdrains to get water out of the section)?
6. Is grade and cross-slope controlled (stringline, machine control, or careful survey)?
7. Is the base compacted and tested before paving, not just spread?
8. Are proof-roll and density records kept for the buried layers?

Road reconstruction puts subgrade, base and drainage in the same contract; PorchRocket's Bid Control lists public paving bids from state agencies and special districts for crews quoting the complete pavement section.

Next step: Find yard reconstruction accounts