ANVILFIELD Try FieldOS

Readiness check

Is your warranty year protecting the owner or burning your reputation?

The warranty year after substantial completion is where the relationship and the reputation are made or lost. Tracked warranties, an 11-month inspection, and fast callback triage protect the owner and your name; a drifting warranty year burns both. Answer for how the warranty period is actually managed. The score stays on your device; enter an email only if you want the warranty management checklist sent over.

1. Do you track every warranty's terms, coverage, and start and expiration dates?
2. Do you know which warranties are workmanship (yours) vs manufacturer (the product)?
3. Do you run an 11-month inspection to catch defects before the one-year warranty expires?
4. Is there a callback process that triages warranty defect vs owner maintenance vs abuse?
5. Do you respond to warranty calls fast (knowing it drives reputation and repeat business)?
6. Did you train the owner so they can operate the building (not just hand over manuals)?
7. Are deferred and seasonal commissioning tests scheduled into the warranty year?
8. Do you avoid eating non-warranty work (maintenance or abuse) as if it were a defect?

Next step: Calculate warranty route density