Is your jobsite flowing or stopping and starting?

Lean construction is about reliable workflow, crews flowing without waiting on each other, and that only happens when the work is made ready before the crew shows up. Answer for how your project is actually planned, not the master schedule on the wall. The score stays on your device; enter an email only if you want the lean construction checklist sent over.

1. Do the trades pull-plan collaboratively, working backward from milestones, or is the schedule imposed?
2. Is there a look-ahead that screens upcoming work and removes constraints?
3. Do you make work ready (material, info, predecessor, access) before scheduling it?
4. Do crews commit only to work that is actually ready in the weekly plan?
5. Do you measure percent plan complete (did we do what we said)?
6. Do you analyze the why-not (the reasons commitments failed) and fix the cause?
7. Is waiting and rework treated as the enemy (waste), not the worker?
8. Is lean treated as a culture and behavior change, not a software purchase?