Is your HVAC system ready for commissioning and turnover?

Commissioning is where the gap between the design and the install shows up, and most failures are unfinished startup, an unbalanced system, or controls that were never proven against the sequence. Answer for the actual state of the job, not the schedule you hoped for. The score stays on your device; enter an email only if you want the commissioning readiness checklist sent over.

1. Is equipment startup complete per the manufacturer, with the startup reports in hand?
2. Has the air side been balanced with a TAB report (airflows set to design)?
3. Has the water side been balanced (flows and delta-T verified)?
4. Are the controls installed and the points checked out (point-to-point verified)?
5. Have the sequences of operation been functionally tested against the design intent?
6. Are safeties and alarms tested (freezestat, high-limit, smoke, low-water)?
7. Is the system documentation complete (O&M manuals, as-builts, submittals)?
8. Is owner training planned and the punch list tracked to closure?