Is your dock safe in the water and around the power?

A dock is built in the harshest environment there is, and the moment you add shore power you create the risk of electric shock drowning. The failures are corrosion, ice, and a deadly leakage current. Answer for how the dock is actually built. This is general guidance; confirm with NEC 555, the engineer, and the permitting agencies. The score stays on your device; enter an email only if you want the dock readiness checklist sent over.

1. Is the marina electrical protected against electric shock drowning (NEC 555, GFCI, bonding)?
2. Is swimming prohibited near powered docks, with signage and awareness?
3. Are the fasteners and hardware marine-grade (hot-dip galvanized or 316 stainless)?
4. Is the lumber or decking rated for water or ground contact (or composite)?
5. Are the pilings designed for the loads and, in cold climates, for ice jacking?
6. For a floating dock, is the flotation encapsulated (no exposed foam)?
7. Do you have the waterfront permits (Army Corps, state submerged land, environmental)?
8. Is the gangway accessible at the working water levels (slope, transition plates)?