ANVILFIELD Try FieldOS

Readiness check

Is your jobsite a hard target or an easy score?

Construction theft is a multi-billion-dollar problem with a low recovery rate, and an open site is a target. No single measure stops it, so security is layers that make your site the harder target and let you recover what does walk off. Answer for how the site is actually secured. The score stays on your device; enter an email only if you want the jobsite security checklist sent over.

1. Do you use layered security (perimeter, lighting, cameras, locks, GPS) rather than one measure?
2. Is the perimeter controlled with a fence, one entrance, lighting, and signage?
3. Are tools and small valuables locked up at the end of every day?
4. Is heavy equipment protected (immobilizer, GPS, geofence alert, clustered)?
5. Is high-value material (copper, wire, fuel) delivered just-in-time and secured?
6. Are tools and equipment marked and serial numbers recorded?
7. Do you keep an inventory so you know what is gone and can report it?
8. Do you control site access (who is on site, sign-in, sub control, after-hours)?

Next step: Find yards for security work