ANVILFIELD Try FieldOS

Readiness check

Is your arc flash and electrical safety program ready to protect workers?

An arc flash happens in milliseconds and releases enough energy to kill or burn at several feet, and most incidents trace to working energized without the right justification, label, or PPE. Answer for how your crews actually work, not what the binder says. The score stays on your device; enter an email only if you want the electrical safety readiness checklist sent over.

1. Do you have a current arc flash study with incident energy labels on the equipment?
2. Is energized work treated as the exception, with a written justification and permit?
3. Do workers have and use arc-rated PPE matched to the incident energy at the task?
4. Is lockout/tagout established and verified (test for dead) before work?
5. Are workers trained and qualified for the voltage and tasks they perform (NFPA 70E)?
6. Do you use the right tools and boundaries (insulated tools, approach boundaries, barriers)?
7. Is the electrical equipment maintained so protective devices actually clear a fault fast?
8. Do you use arc-energy-reduction methods where required (maintenance switch, fast trip)?

Next step: Find arc flash study bids