HVAC · Start here
Get the HVAC job done
External static pressure, CFM, duct leakage, charging, balancing, and commissioning notes.
Run the numbers
HVAC field calculators for sizing, quantities, and loads.
ACH to CFM calculatorFind the airflow for a target air change rate: CFM = room volume x ACH / 60, from floor area and ceiling height.Ventilation rate calculatorFind the breathing-zone outdoor air a space needs: Vbz = Rp x Pz + Ra x Az.Tons to BTU calculatorConvert a cooling load to tons of refrigeration: tons = BTU per hour divided by 12,000.Dew point calculatorFind the dew point from air temperature and relative humidity, and the surface temperature condensation forms at.Duct equivalent diameterConvert a rectangular duct to its equal-friction round diameter: De = 1.30 x (a x b)^0.625 / (a + b)^0.250.Affinity laws calculatorScale fan or pump flow, pressure, and power for a speed change using the affinity laws: flow with speed, pressure with the square, power with the cube.
All HVAC calculators Check you're ready
Readiness checks before you start the work.
Cold storage readinessA 2 minute check on whether your refrigerated warehouse handles the floor heave, vapor drive, and ammonia risk a walk-in never faces, before the slab cracks or a leak shuts you down.Succession & exit readinessA 2 minute check on whether your business is built to transfer for real value, before the day you want out arrives and you find out it is worth less than you hoped.EPA 608 practice testTen questions across the Core section and all four certification types, the way the real EPA 608 exam splits the work.HVAC Cx readinessA 2 minute check on whether an HVAC system will actually pass commissioning and run as designed, before the Cx agent and the owner find the problems.
All HVAC readiness checks Choose between options
Side-by-side decision guides with a decision table.
Air-side vs water-side economizerAir-side economizer vs Water-side economizerCentrifugal vs ScrewCentrifugal chiller vs Screw chillerChilled water vs DXChilled water vs DX (direct expansion)Ducted vs mini-splitDucted system vs Ductless mini-split
All HVAC comparisons Learn the work
Start with the HVAC pillars, then go deep.
Cold storage and refrigerated warehouse designScaling a walk-in to a warehouse: heat the sub-floor or the freezer heaves, keep the inward vapor barrier continuous or ice fills the panels, manage the ammonia with PSM, and pull the building down slowly.Refrigeration cycle field guideCooling moves heat, it does not make cold. Read the four-part loop, the phase change that carries the load, the high and low side, and the saturation numbers that tell you what the system is doing.HVAC system types field guideThe axes that sort every HVAC system, the families behind the labels, and how to match the system to the building before the bid locks it in.Heat pump fundamentals field guideMove heat, do not make it: how a heat pump heats and cools with one system, what COP and the balance point mean, and why defrost is normal.Cooling tower types and operationWhat a cooling tower does, why the wet-bulb is the floor it can never beat, and how open, closed-circuit, crossflow, counterflow, induced, and forced-draft towers actually differ on the job.Chiller types and selectionWhat a chiller is, the compressor families and how they reject heat, the efficiency each one buys you, and how to pick the machine the building actually wants.
All HVAC field guides Prove it and get paid
Capture the HVAC job in the field, build the proof, and send a clean record.