ANVILFIELD Try FieldOS

Readiness check

Is your digital twin a working tool or a 3D picture?

A digital twin only pays off when it is connected to live data, kept current, and used to make an operations decision. A static handover model nobody updates is a 3D picture, not a twin. Answer for how your twin is actually built and used. The score stays on your device; enter an email only if you want the digital twin checklist sent over.

1. Is the twin connected to live data (BAS, IoT sensors), not just a static model?
2. Is there an accurate as-built model behind it (tagged equipment, real geometry)?
3. Is there a clear use case it serves (asset management, maintenance, energy)?
4. Was the twin built from the commissioning handover (as-built + equipment data), not after the fact?
5. Is the asset and equipment data structured (COBie or similar), not loose documents?
6. Is there a plan to keep the twin current as the building changes?
7. Does the FM team actually open and use it?
8. Did you start with one valuable use case rather than an everything-twin?

Next step: Monitor equipment changes