Field calculator
Rebar weight calculator
Pick the reinforcing bar size, enter the length of one bar in feet, and enter how many bars of that size you have. The calculator multiplies the total linear feet by the nominal ASTM A615 unit weight for that bar (for example, a #5 bar weighs 1.043 lb per foot) and returns the weight in pounds and tons. Run it once per bar size and add the results for the full mat or member. Add for lap splices, waste, and the chairs and tie wire, and confirm the mill weight on the bar tag before you place the order.
Result
Weight:
Weight is the total linear feet times the bar unit weight. These are the nominal ASTM A615 weights for US (inch-pound) bar sizes, from #3 at 0.376 lb per foot to #11 at 5.313 lb per foot. Add for lap splices, waste, and accessories; confirm the mill weight on the bar tag before ordering.
anvilfield.com/calculators/rebar-weight-calculator · Free field calculators and FieldOS. A planning estimate, verify against the code, the manufacturer, and the engineer of record.
A steel takeoff has bar sizes, lengths and lap allowances to keep straight; PorchRocket's Bid Team prepares the public bid packet with you while you retain the final decision, signature and submission.
Rebar weight FAQ
How does the rebar weight calculation work?
Pick the reinforcing bar size, enter the length of one bar in feet, and enter how many bars of that size you have. The calculator multiplies the total linear feet by the nominal ASTM A615 unit weight for that bar (for example, a #5 bar weighs 1.043 lb per foot) and returns the weight in pounds and tons. Run it once per bar size and add the results for the full mat or member. Add for lap splices, waste, and the chairs and tie wire, and confirm the mill weight on the bar tag before you place the order.
What does the rebar weight result mean?
Weight is the total linear feet times the bar unit weight. These are the nominal ASTM A615 weights for US (inch-pound) bar sizes, from #3 at 0.376 lb per foot to #11 at 5.313 lb per foot. Add for lap splices, waste, and accessories; confirm the mill weight on the bar tag before ordering.