ANVILFIELD Try FieldOS

Readiness check

Will your laser scan be usable or just a pretty cloud?

A laser scan is only worth the effort if it ties to control, hits the accuracy the use needs, and actually gets used to build or verify. A drifting, gap-filled cloud nobody opens again is wasted money. Answer for how your scanning actually runs. The score stays on your device; enter an email only if you want the reality capture checklist sent over.

1. Do you make a scan plan (coverage, overlap, setups, line of sight) before scanning?
2. Do the scans tie to the project survey control (the same control as layout and BIM)?
3. Is the registration checked so the combined cloud does not drift?
4. Is the level of accuracy (LOA) agreed and matched to the use?
5. Is the right method used for the job (terrestrial for accuracy, mobile for speed, drone for outside)?
6. Is the coverage complete (no gaps in the areas that matter)?
7. Is the cloud turned into something usable (scan-to-BIM model or a QA deliverable)?
8. Do you use the scan to verify the as-built against the design (deviation check)?

Survey control and specified accuracy define what the scan crew is selling. Award records in PorchRocket's Bid Control name the winning contractors, tying a scanning firm's subcontract pitch to a specific public construction job.

Next step: Build a scanning territory