ASTM C1701: pervious-concrete infiltration rate and test selection

ASTM C1701/C1701M-17a(2023) reports a local pervious-concrete infiltration rate from water mass, ring diameter and elapsed time. With a 300 mm ring, 3.60 kg infiltrating in 120 seconds calculates to 1,527.9 mm/hour, or 60.2 inches/hour. That surface-test rate is not the native soil's design infiltration rate. Use C1781 (https://store.astm.org/c1781_c1781m-21.html) for permeable unit pavement, and keep modified porous-asphalt investigations identified by their actual procedure rather than presenting every ring test as C1701.

Current edition: ASTM C1701/C1701M-17a(2023), reapproved 2023
Updated

Official publisher page

Applies to

Pervious-concrete contractors, stormwater inspectors, testing agencies and maintenance managers use C1701 for construction and service records. The pervious concrete installation guide covers placement and acceptance. This page addresses the calculation trail behind a reported rate, complementing the location selection and cleaning decisions in the clogging restoration guide.

Key topics

Which geometry and water quantity produced the rate?

The City of Puyallup's published C1701-09 procedure uses a 300 ± 10 mm inside-diameter ring and maintains water between marks 10 and 15 mm above the pavement. Its 3.60 kg prewetting stage selects the test quantity: 18.00 kg when prewetting takes less than 30 seconds, or 3.60 kg at 30 seconds or longer. This is a dated procedure, not a substitute for the currently specified edition. A legacy result missing its prewetting time cannot establish why that test quantity was selected.

Keep kilograms, millimetres and seconds in one calculation

ODOT's June 2023 infiltration research publishes I = K × M / (D² × t), using water mass M in kilograms, inside diameter D in millimetres and time t in seconds. With K = 4,583,666,000, the result is millimetres per hour. ODOT used a modified asphalt test; the calculation is useful for auditing units, while the reported research setup remains a different procedure. Preserve diameter as a measured input instead of silently inheriting another ring's value.

How many locations does the monitoring plan need?

Philadelphia Water Department's January 2014 Comprehensive Monitoring Plan uses a modified C1701/C1781 procedure with at least three locations for up to 25,000 square feet, then one additional location for each further 10,000 square feet or fraction. A 40,000-square-foot area therefore needs five locations under that plan. This agency example shows how test count enters the scope and fee; the applicable project's testing plan establishes its own locations and acceptance population.

How it is used in the field

Using the published SI equation, 3.60 kg of water passing through a 300 mm ring in 120 seconds gives 4,583,666,000 × 3.60 / (300² × 120) = 1,527.9 mm/hour. Dividing the completed result by 25.4 gives 60.2 inches/hour. Keep the calculation in one unit system until that final conversion; inserting an inch diameter into the SI equation changes the denominator without changing its conversion constant.

Changing only the diameter cell from 300 to 150 mm makes the same mass-and-time record report 6,111.6 mm/hour, four times the correct value. Both rates are possible-looking numbers for a permeable pavement. Display the measured diameter beside the result; a simple high/low range warning would not reveal this error. A smaller-ring research result also cannot be normalized into an equivalent field test merely by changing that cell.

When reviewing a before-and-after cleaning spreadsheet, pair each location with its earlier raw record. Verify that the same method edition, ring geometry, timing convention and output units were used. Preserve the unrounded calculation and round only the displayed result. Otherwise a changed worksheet can manufacture an apparent maintenance benefit that the field observations never established.

ASTM C1701/C1701M-17a(2023) says the design engineer typically establishes the required field infiltration rate in relation to the design precipitation event. Enter the project's specified rate beside the reconciled measurement, with the drawing or acceptance-plan reference that supplies it. For a native-soil design input, use the separate site-soil infiltration interpretation rather than inserting the surface ring's 60.2-inch/hour result into the soil calculation.

A passing surface result also leaves some concealed defects unresolved. ASTM's C1701 public significance statement identifies bottom-of-slab void sealing as a condition the ring test does not establish. A pavement that accepts water at the surface but retains it in the section needs investigation of the base, slab underside and outlets. The pervious-concrete guide covers the complete section; retain the ring result as one measured observation within that investigation.

Edition history

The active ASTM designation is C1701/C1701M-17a(2023), a 2023 reapproval of the 2017a edition. The Puyallup-hosted 2009 text supplies historical documentation; it does not replace the current edition in a new test specification.

Municipal permeable-pavement cleaning and retesting scopes are public service work; public paving bid coverage tracks the relevant agency bids through PorchRocket's Bid Control.

Frequently asked questions

Does C1701 cover porous asphalt and permeable pavers?

Its published scope is in-place pervious concrete, and it identifies C1781 for permeable unit pavement. ODOT's cited asphalt research expressly modified C1701. Retain that modification in the method name instead of treating an asphalt research result as a conforming pervious-concrete acceptance test.

Why retain seconds when the final result is inches per hour?

Seconds are an equation input; inches per hour are an output unit. Keeping both the raw time and converted rate makes a unit-entry mistake detectable without repeating the field test.

Can the reported rate reveal a wrong ring-diameter entry?

The rate alone cannot distinguish that entry error from a faster measured infiltration time. Retrieve the original diameter, mass and time, then recalculate the result before interpreting a change in pavement performance.