Aggregate base

On a pavement submittal, aggregate base identifies a granular mixture accepted for particle grading and quality as well as compacted density. The supplier's sieve report and plasticity results establish whether the delivered blend belongs in that course. For example, INDOT's 2026 size 53 allows 5 to 13 percent passing the No. 200 sieve, but passing that limit alone does not establish material acceptance. Dense-graded road base and clean drainage stone serve different purposes.

The compacted crushed-stone layer under the asphalt that carries the load; also road base or DGA

Used across 4 Anvilfield field guides, most in Paving.
Updated

What does a base material designation actually guarantee?

ASTM D2940/D2940M-20 calls for aggregate quality checks that include grading, liquid limit, plasticity index, sand equivalent and expansion. A passing compaction result establishes how tightly a particular material was placed; it does not establish that the delivered material meets those separate requirements. Attach the approved source and grading to the base compaction record so a density test can be traced to the material it represents.

Read the complete agency size and class on the ticket. A nominal top size alone says little about how much sand or fine material the blend contains. Keep the supplier test report tied to the source and production lot so a change of quarry bench or recycled feedstock remains traceable.

How much fine material belongs in dense-graded base?

INDOT's 2026 aggregate chart permits 5.0 to 13.0 percent passing the No. 200 sieve for size 53 and 5.0 to 12.0 percent for size 73, with a 10 to 12 percent exception for size 53 slag used in a separation layer. Those are Indiana dense-graded products, not limits for clean reservoir stone. The No. 200 opening is 75 micrometers, or 0.075 mm.

The same INDOT 2026 chart limits the plasticity index of sizes 53 and 73 to 5 and the liquid limit to 25, increased to 35 for slag. Fines quantity and fines plasticity answer different questions: one measures how much passes the small sieve, while the other measures its consistency as water content changes. A grading result inside its envelope can still fail the plasticity requirement.

Read a delivery report before accepting the pile

Take a size 53 delivery reporting 11 percent passing No. 200, liquid limit 24 and plasticity index 7. Its fines percentage and liquid limit satisfy the cited INDOT limits, but its plasticity index fails. Additional rolling will not change that classification. Resolve the material discrepancy before it is spread through an accepted section.

Rejecting an unsuitable blend at the stockpile preserves a clear boundary between material replacement and compaction rework. Preserve the ticket, sampled lot and laboratory result together. For stone selected to store water, use the separate permeable pavement section rather than importing a dense-graded base acceptance envelope.

Distinctions

Subbase
The subbase lies below the base course. Price and order each by its specified designation: a supplier's base product does not automatically satisfy the grading selected for the lower course.

Frequently asked questions

Is three-quarter-inch minus the same as approved road base?

It describes a general size concept. Match the actual agency designation and quality results; the minus fraction still needs grading and plasticity control.

Sources checked

Also defined as

  • Landscaping: The compacted crushed-stone layer that carries the load and holds the grade
  • Compacted crushed stone that spreads load, used under pavement or as a gravel-road base