Field glossary · component
Edge restraint
Inspect a paver edge for lateral support, cut-unit size, and concealed sand-loss paths. CMHA's edge detail uses cut pavers for gaps exceeding 3/8 inch and recommends vehicle-exposed cuts at least one-third of a unit. A straight curb with a sinking border still needs an underside inspection: drainage openings and curb joints can release bedding even when the restraint has not moved sideways.
The spiked edge or concrete haunch anchored in the base that holds the perimeter from spreading
Check the gap between pavers and the restraint
CMHA PAV-TEC-003-22 calls for cut pavers where the gap to an edge restraint exceeds 3/8 inch. That space belongs to the paving layout, not an enlarged joint filled to hide an inaccurate cut. Measure at the widest part of a tapered gap, where the missing support is greatest.
For cut units exposed to vehicle tires, CMHA PAV-TEC-003-22 recommends pieces at least one-third of a whole paver. A border that leaves thin slivers needs a layout adjustment before the restraint position becomes fixed. The field and border guide provides the layout sequence; the acceptance check concerns the units that actually remain at the edge.
Provide drainage without releasing bedding sand
For a continuous concrete curb without drainage joints, CMHA recommends 1-inch-diameter weep holes at 15-foot intervals, with their bottoms at the top of the base and filter cloth covering the openings. This detail releases water at bedding level while retaining the bedding particles.
Where sand could escape through or under restraint joints, CMHA describes a 12-inch-wide geotextile strip laid on the base and turned up against the restraint. The detail is localized at the escape path. It does not call for covering the complete bedding surface with fabric.
A 45-foot curb contains three 15-foot intervals, but that is not a complete hole layout. Specify the first and last opening, their invert elevations, and where each one discharges. Compare the exposed filter at a failed opening with an intact one on the same run; matching hole diameters alone would miss a torn or absent filter.
Diagnose an edge that looks sound from above
CMHA's PAV-TEC-006-22 maintenance guide distinguishes paver separation caused by loose restraint from depressions associated with lost bedding or support. Record whether the units have moved sideways, downward, or both before choosing the repair.
Follow a low border to nearby curb joints and drainage openings. Local loss beside one opening directs attention to the filter detail; a widening line of joints directs attention to lateral restraint. Photograph the exposed interface during repair so future inspections can compare the concealed condition with the visible symptom.
Keep border pavers separate from the restraint takeoff
Measure the structural curb or anchored restraint along its own alignment. Separately count the border units that sit inside it and the cuts required around drains, utility covers, and changes in direction. Those quantities describe different items even when the visible perimeter looks like one continuous border.
Distinctions
- Decorative edging
- A landscape divider can separate mulch from paving without providing the structural support required at the paver perimeter.
Frequently asked questions
Will polymeric sand repair a moving paver edge?
A hardened joint cannot restore a displaced restraint or replace bedding that has escaped. Repair the movement or material-loss path before reinstating the joints.