Specify a geotextile by the soil it must retain and the water it must pass, then compare mechanical properties for installation survival. ASTM D4491/D4491M-22 reports through-thickness flow as permittivity; 1.5 s⁻¹ multiplied by a 2 mm nominal thickness gives 3 mm/s nominal conductivity. That conversion does not include clogging at the soil interface. Fabric weight and a woven or nonwoven description cannot replace these results.

A permeable textile selected to retain soil while passing water; drainage filters include suitable woven and nonwoven products

Used across 3 Anvilfield field guides, most in Landscaping.
Updated

Apparent opening size includes a test method

Apparent opening size, or AOS, describes an opening dimension used in soil-retention evaluation. It is not a complete distribution of every pore in the textile. A product report needs the test designation alongside the result; similarly named opening-size values are not automatically interchangeable.

ASTM D4751-21a requires at least three satisfactory comparison results to establish a product-specific correlation before using its capillary-porometer Method B as an alternative to Method A. Different manufacturers or nominal fabric weights constitute different products for that correlation. A previous approval for a heavier fabric does not qualify the lighter substitute.

For a dispute involving porometer results, ASTM D4751-21a identifies dry-sieving Method A1 as the referee method. Put the method in the acceptance record so a numerical disagreement can be traced to the measurement before anyone changes the specified opening size.

Permittivity is not a soil permeability result

ASTM D4491/D4491M-22 measures geotextile water permeability through permittivity in the uncompressed condition. Permittivity has units of inverse time, commonly s⁻¹; hydraulic conductivity has units of length per time. The distinction matters when a fabric report is being compared with a soil or aggregate drainage test.

ASTM D4491/D4491M-22 calculates nominal hydraulic conductivity by multiplying permittivity by nominal fabric thickness. For a report showing 1.5 s⁻¹ and 2 mm thickness, the calculated conductivity is 3 mm/s. Multiplying by 0.002 m instead produces the equivalent 0.003 m/s. Neither calculation adds the adjacent soil or the loaded soil-fabric interface to the laboratory result.

When falling-head or air-flow results are disputed, ASTM D4491/D4491M-22 specifies the constant-head method at a 50 mm head as the referee test. This is a defined comparison condition, not the water head that every drainage installation must maintain.

Keep the soil and fabric reports paired

File the soil grading beside the proposed opening-size result and keep the drainage requirement beside the permittivity result. The separation and stabilization guide covers installation choices; these paired reports explain why the particular fabric was selected.

Record the product, lot, test method, units, and acceptance basis together. If one report gives permittivity in inverse seconds and another gives flow per unit area at a stated head, first align the head and units. A larger bare number is not evidence of a more permeable fabric.

Distinctions

Geogrid
The large openings of a reinforcement grid admit aggregate interlock. They do not establish the particle-retention behavior measured for a filter textile.
Landscape weed fabric
A retail weed-suppression product without declared opening-size, flow, and strength tests cannot be accepted as an engineered separator or drainage filter from its color or weight.

Frequently asked questions

Does nonwoven fabric always drain better than woven fabric?

Construction type alone does not answer the flow question. Compare the specified flow test and result for the exact products, then their compatibility with the soil.

Sources checked

Also defined as

  • Paving: An engineered permeable fabric placed in soil, here between subgrade and aggregate, to separate, filter, drain, or reinforce.
  • A separation fabric over weak subgrade that keeps soil fines and base stone from migrating into each other