ANVILFIELD Try FieldOS

Field glossary · material

Bedding sand

For conventional pavers, accept bedding sand by layer thickness, particle grading, and resistance to breakdown. CMHA specifies a nominal 1-inch loose course before seating the units; its road-traffic guidance also limits No. 200 fines to 1%. The first number describes placement and the second describes material quality. A concrete-sand delivery ticket answers neither question without a depth measurement and the supplier's test report.

The nominal 1 in (25 mm) loose, screeded setting course of ASTM C33 concrete sand before seating interlocking pavers under CMHA PAV-TEC-002-22

Used across 2 Anvilfield field guides, most in Landscaping.
Updated

Measure the loose course before accepting the sand quantity

CMHA PAV-TEC-002-22 defines its nominal 1-inch bedding thickness in the uncompacted condition. For 1,200 square feet, that loose geometric layer contains 100 cubic feet, or 3.70 cubic yards. A takeoff labeled 1 inch compacted uses a different quantity basis and needs its consolidation allowance stated.

Measure from the accepted base to the screeded surface before covering it, then record the delivered material separately from installed volume. A delivery surplus could be stockpile residue or handling loss; it does not establish that a thicker course was installed.

Does ASTM C33 cover the whole bedding specification?

ASTM C33/C33M-24a specifies concrete aggregate grading and quality; a paving specification must identify the additional bedding requirements. For the road traffic addressed in PAV-TEC-017-22, CMHA limits material passing the No. 200 sieve, the 0.075 mm opening, to 1%. A supplier's general concrete-sand ticket therefore needs the actual fines result, not just the product name.

The paver installation guide covers the setting course. Material acceptance happens earlier: tie the gradation and durability reports to the source and delivered lot. A report for another pit or a different manufactured blend does not describe the sand now on the truck.

Why sound grains matter under traffic

For roads carrying at least 1.5 million lifetime equivalent standard axle loads, CMHA PAV-TEC-017-22 recommends a maximum Micro-Deval degradation loss of 8%. The note addresses axle loads up to 24,250 pounds. Micro-Deval subjects aggregate to wet abrasion. It addresses a failure that a particle-size distribution misses: grains that become fines after installation.

Suppose two sands both arrive with 0.8% passing the No. 200 sieve. Their Micro-Deval losses are 6% and 11%. Both satisfy the cited initial fines limit, but only the first satisfies the cited durability recommendation. Choosing by the cleaner-looking stockpile would miss the difference that the abrasion test reveals.

Reading permeability beside the fines result

CMHA PAV-TEC-017-22 lists minimum bedding-sand permeability of 2.8 inches per hour for its road traffic scope and evaluates that result alongside durability and grading. A fast-draining sample still needs acceptable gradation and durability. The tests answer separate questions: present pore flow, present particle sizes, and resistance to future breakdown.

Bedding that loses fines can leave unsupported pockets; bedding that accumulates fines can retain water and pump slurry. When investigating depressions, retain a sample from the affected layer and compare it with the approved material report. Joint refill alone cannot restore a seating layer whose grains have broken down or migrated.

Distinctions

Jointing sand
Jointing material occupies the gaps between units. Its grading and binder requirements do not automatically qualify it for the bedding layer.
PICP bedding aggregate
Open-graded stone supports permeable pavement while preserving interconnected voids. Substituting conventional bedding sand changes that drainage assembly.

Frequently asked questions

Can a washed-sand label replace test results?

Washing describes processing. Acceptance still depends on the delivered grading, fines content, and any durability or permeability criteria in the pavement specification.

Is stone dust the same as bedding sand?

CMHA PAV-TEC-002-22 excludes stone dust, limestone screenings, and masonry sand from conventional paver bedding. A trade name such as paver sand still needs the specified grading and quality reports.

Sources checked

Also defined as

  • The screeded 1 in (25 mm) setting course of washed concrete sand the pavers seat into

Where this shows up