Subgrade
Subgrade identifies the soil formation supporting the pavement section, whether exposed by excavation or built with compacted fill. Its condition record needs more than a soil name: include moisture, test depth and the method used to estimate support. FHWA's construction screening treats an estimated in-situ CBR of 6 or less as prone to rutting under construction traffic. A laboratory soil-classification symbol does not establish that field support value.
The prepared native soil or approved compacted fill beneath the pavement; yielding soil requires repair
Read a soil symbol as a classification, not a strength value
ASTM D2487-17(2025) bases precise soil classification on laboratory particle-size characteristics, liquid limit and plasticity index. A visual soil description in a boring log and a completed laboratory classification have different evidentiary bases. Preserve which one the report contains instead of silently upgrading a field description to a tested symbol.
ASTM D2487-17(2025) identifies soils with 5 to 12 percent fines as one circumstance requiring dual classification symbols. A notation such as GP-GM is deliberate information about the material, not a clerical uncertainty to delete from the earthwork record. Retain both symbols when submitting material for subgrade stabilization selection, since deleting the fines designation removes useful information.
Use penetration rate to locate changes with depth
FHWA NHI-05-037 presents CBR = 292 divided by DPI raised to 1.12 for gravel, sand and silt tested with a manual-hammer dynamic cone penetrometer; DPI is penetration in millimeters per blow. The reference gives separate clay correlations and reports different results for automatic-release hammers. Record hammer type, soil group and depth interval before converting penetration into CBR.
At 20 mm per blow, that gravel-sand-silt equation gives a CBR of about 10.2; at 40 mm per blow it gives about 4.7. Save penetration by depth interval. Averaging the whole sounding into one number can hide a soft layer beneath a firm surface, which is often the layer that changes the construction platform.
Construction support and long-term design are different checks
FHWA NHI-05-037 identifies an estimated in-situ CBR of 6 or less as a level at which soil is expected to rut and deflect under construction operations, with CBR 6 to 8 described as marginal construction support. That screening addresses equipment working on exposed ground; it is not a universal pavement thickness table.
Record the field moisture and the test depth beside the correlated result. A soaked laboratory CBR, an in-situ penetration correlation and a design resilient modulus are different inputs. Carry each with its method and condition into the pavement design guide rather than replacing one label with another during a spreadsheet handoff.
Distinctions
- Topsoil
- Topsoil is managed for vegetation and organic content. Calling a fill surface subgrade does not establish that organics have been removed or that it is suitable structural material.
- Dual symbol versus borderline classification
- ASTM D2487-17(2025) distinguishes a dual classification such as GP-GM from a borderline notation such as CL/CH. Preserve the hyphen or slash because they communicate different classification findings.
Frequently asked questions
Can compacted fill be subgrade?
Yes. Subgrade describes its position and function in the completed section. The fill still needs the material, placement and acceptance records required for that foundation.
Sources checked
Also defined as
- Concrete: The compacted natural or fill soil under the slab that carries the load; uniform matters more than stiff
- Paving: The natural soil at the bottom of the section that carries the base and pavement above it