ANVILFIELD Try FieldOS

Field glossary · process

Air entrainment

Air entrainment introduces a designed bubble system for freeze-thaw durability; its field acceptance test counts both the deliberately stabilized bubbles and residual entrapped air. A 6.8% pressure reading with a 0.3-point aggregate correction becomes 6.5% reported air. Record that calculation and the sampling location together. ASTM C457/C457M-24 supplies a separate hardened-concrete examination when the question concerns the void system remaining in an element with freeze-thaw damage.

Deliberate creation of tiny, stable, evenly spaced air bubbles in concrete using an admixture, for freeze-thaw and deicer durability

Used across 3 Anvilfield field guides, most in Concrete.
Updated

What the pressure gauge includes

ASTM C231/C231M-26 requires an aggregate correction factor because the reported fresh-concrete air content excludes air inside aggregate particles. The gauge reading is therefore an intermediate measurement. Record both the apparent reading and the correction used, so another technician can reproduce the reported result.

WSDOT's January 2026 Materials Manual reproduces a field procedure based on AASHTO T 152-24 that reports air to the nearest 0.1 percentage point and shows subtraction of the agency's aggregate correction. Keep this correction separate from meter standardization: standardization checks the instrument, while the aggregate correction accounts for the aggregate in the tested concrete.

Choose the air test for the aggregate

ASTM C231/C231M-26 excludes lightweight aggregate, air-cooled blast-furnace slag, and highly porous aggregate from the pressure method and directs those concretes to the volumetric method, currently ASTM C173/C173M-26. Put the aggregate description beside the test designation on the report; a precise pressure reading from an unsuitable aggregate system does not resolve the air content.

Keep the specified air target separate from the meter reading. The target belongs to the approved mixture and exposure requirements; the reading belongs to one sample at one stage of placement. The air-entrainment guide provides the exposure context for that comparison.

Why a core report does not label every bubble

ASTM C457/C457M-24 does not formally separate entrained, entrapped, and water voids because their sizes and shapes overlap. A report that supplies separate categories needs to state the analyst's classification convention. Calling every small cavity an admixture-created bubble assigns a history that the microscope alone does not establish.

The useful laboratory request identifies the sampled element, depth, orientation, and question being investigated. For a wearing-surface complaint, preserve which face was exposed and where the section came from. Otherwise a technically competent count can describe the interior paste while the disputed material is the surface zone.

Reconciling truck tests with hardened concrete

ASTM C457/C457M-24 notes that concrete with air content usually above 7.5% can give microscopic air results one or more percentage points higher than pressure-method results. That difference alone does not demonstrate that someone changed the mixture. Compare specimen consolidation and the stage at which the fresh sample was collected before attributing the discrepancy to batching.

Use separate columns for truck samples, pump-discharge samples, and cores, with a time and location for each. A difference between those columns identifies a question about handling or measurement; averaging them into one placement result discards the evidence needed to answer it.

  • Identify the meter and its standardization record.
  • Retain the gauge reading, aggregate correction, and reported air content.
  • Locate each sample in the delivery and placement sequence.
  • Preserve core orientation and the laboratory's void-classification convention.

Distinctions

Aggregate correction
A correction for the aggregate's response during the pressure test. It is not a deduction for air thought to be lost during pumping.
Meter standardization
An instrument check using a known volume relationship. It does not establish the correction for the concrete's aggregate blend.

Field example

A pressure gauge reads 6.8% and the established aggregate correction is 0.3 percentage point. The reported result is 6.5%, calculated as 6.8 minus 0.3. Subtracting 0.3% of the reading instead would produce 6.78%, a different calculation that leaves almost the entire correction unapplied.

Frequently asked questions

Does a higher core air result prove the truck test was wrong?

No. Different consolidation, sampling stages, and measurement methods can produce different results. Reconcile the records and specimen locations before treating the two percentages as measurements of identical material under identical conditions.

Sources checked

Also defined as

  • Tiny air bubbles folded into the mix, about 5 to 7 percent, that resist freeze-thaw scaling
  • Microscopic air bubbles added to the paste to resist freeze-thaw scaling and spalling

Where this shows up

Next step: Build a parking-lot list

Back to the full field glossary