Broom finish

On a finish schedule, 'broom finish' calls for a brushed concrete texture for traction whose appearance should be agreed using a representative placement. The brush marks are not a slip-test result or a flatness tolerance. ASCC's May 2022 textured-finish study recommends overall FF values of 15 to 20 when an F-number is specified for broomed concrete; the U.S. Access Board sets no numerical friction coefficient in the 2010 ADA Standards.

Fine ridges dragged into the floated surface for traction, the standard driveway finish

Used across 3 Anvilfield field guides, most in Concrete.
Updated

Set the broom texture with a production sample

Choose an accessible part of the first placement as the appearance reference, using the proposed broom, reach and finishing crew. Note the stroke direction, overlap and texture beside a photograph of that panel. Those details give the next crew something repeatable to match across adjoining placements.

The ASCC authors of F-numbers and Textured Concrete Surface Finishes identify a 2 ft square sample as unrepresentative of brooming a 15,000 sq ft placement. A bench sample does not reproduce production access or the changing concrete condition across a large pour.

Compare overlapping strokes, heavy start marks, smooth skips and torn areas with that accepted panel. A texture that changes where the operator changes reach points to the finishing method; a surface that tears despite a consistent pull calls for a check of the concrete's surface condition.

Check for bleeding beneath a dry crust

NRMCA's CIP 14, revised in 2017, recommends covering a small portion of the slab to check whether bleeding continues. Compare the protected spot with the exposed surface: water showing only under the cover reveals evaporation masking the bleed water. A dry-looking face alone is a poor basis for starting the broom.

Use this check separately in windy, shaded and sheltered areas when their surfaces behave differently. The protected spot supplies evidence for the timing decision that the flatwork finishing sequence requires. Log which area was checked, rather than assigning the whole placement one elapsed-time rule.

Separate FF acceptance from the depth of the brush marks

ASCC's 2022 paper recommends specified overall FF values between 15 and 20 for broomed surfaces when flatness acceptance is needed. This is the authors' recommendation, not an automatic requirement attached to the word 'broom'. Their reported broom-texture measurements ranged from FF 14 to 22 across the finishing techniques studied.

An estimator reading 'broom finish, overall FF 35' has two acceptance demands to resolve before pricing the pour. The FF 35 target exceeds the authors' recommended range; a deeper brush pattern does not supply the extra flatness. Agree on the placing method and acceptance survey with the production sample, then price the work needed to meet both demands.

Broom finish and ADA slip resistance

The U.S. Access Board's surface guidance explains that 2010 ADA Standards Section 302.1 requires firm, stable, slip-resistant surfaces without assigning a numerical friction coefficient. A claimed 'ADA coefficient' therefore has no threshold in that provision. A project specifying a friction value also needs its own measurement protocol.

Texture photographs, a drainage observation and a slope survey answer separate acceptance questions. Record smooth patches and surface contamination during the walk-through, and use the curb-ramp guide for the surrounding geometry. Brooming a ramp does not demonstrate its running slope or cross slope.

Distinctions

Swirl finish
Curved tool strokes create a different visual pattern from the repeated brush pulls used in the broom reference panel. Approve the actual specified pattern rather than substituting one textured finish for another.

Frequently asked questions

Is a heavier broom finish automatically more slip resistant?

A heavier-looking pattern supplies no numerical friction result. The Access Board ties slip resistance to the expected surface conditions and does not prescribe an ADA coefficient; specify the test protocol separately when a numerical result is required.

Can a small broom sample establish the whole job's appearance?

ASCC identifies the mismatch between a 2 ft square reference and a 15,000 sq ft pour. Use a production panel to capture the actual broom reach, overlaps and surface timing.

Sources checked

Also defined as

  • Paving: Surface texture dragged perpendicular to travel, ~1/16 to 1/8 in deep, for slip resistance
  • Slip-resistant texture dragged into the floated surface, run perpendicular to slope

Where this shows up